| 1 | Earth work excavation for plinth protection depositing on bank in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including cost of labour, T&P, lead, lift etc.,complete. |
| 2 | Clean removal of cement plaster & pointing from the existing walls and clearing away the debrises from the site as directed by the engineer at site including scaffolding charges, cost of labour, lead, lift, tools & plants, etc. complete. |
| 3 | PCC 1:3:6 for Plinth using 20 mm HBG metal including cost of all materials, labour, lead, lift, head load, curing, etc., complete. |
| 4 | Plastering with C.M 1:3, 12mm thick with water proof compound including cost of all materials, curing, labour lead lift complete. |
| 5 | Pointing with cement mortar 1:3 for RR wall including all cost of materials, labour, lead, lift, etc complete. |
| 6 | Flooring with cement mortar 1:5 of 20mm thick including cost of all materials, labour, lead, lift, head load, etc., complete. |
| 7 | Supplying fabrication,erection,aligning and placing in position of structural steel materials like M.S. Angle including cost of all material.labour charges, welding charges, painting two coats of enamel over one coat of primer, lead, lift etc., complete. |
| 8 | Painting with Water Proofing Paint with two coat by using Arresting Water leakage after through scrapping and washing /cleaning the old surface including the cost of all materials,lead, lift, labour, T&P,etc.,complete. |
| 9 | White Washing with two coat by using white cement after through scrapping and washing /cleaning the old surface including the cost of all materials, lead, lift, labour, T&P, etc., complete. |
| 10 | Supply and laying of water supply Pipe line specials like Flange, Valve, reducer, connecter etc., as approved by the Engineer incharge including cost of all materials, labour, transportation, lead, lift, head load, etc complete. |
| 11 | 3\\" GI Pipe |
| 12 | 4\\" Gate Valve |
| 13 | 3\\" GI Flange |
| 14 | 2\\" GI Flange |
| 15 | 2\\" Hose collar |
| 16 | 3\\" x 2\\" Reducer |
| 17 | GST 18% as per Govt. Norms Please Enable Macros to View BoQ information |