| 1 | Jalanidhi Sustainability Project 2025-2026-Nanma Kakkamala wss |
| 2 | OD58791/2025-2026Drilling for 150mm dia bore well,Cost of 180 mm dia PVC end Cap |
| 3 | 100.98.228Supply of PVC Pipe, 8kg/cm2, 180mm Dia |
| 4 | 100.9.12Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches alreadymade, placing in position aligning the pipeline to the lines and levels and jointing thepipes and specials with solvent cement and testing the pipeline with water to therequired test pressure (excluding cost of pipes and specials): 180 mm nominal outsidediameter pipes |
| 5 | 100.98.151Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 50mm Outer Dia |
| 6 | 100.9.5Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches alreadymade, placing in position aligning the pipeline to the lines and levels and jointing thepipes and specials with solvent cement and testing the pipeline with water to therequired test pressure (excluding cost of pipes and specials): 50 mm nominal outsidediameter pipes. |
| 7 | OD58795/2025-2026Supply and fixing submersible cable for bore well pump (4qr ISI) |
| 8 | OD58796/2025-2026Supplying and erection of best quality ISI market brand bore well submersible Three phase driven motor pump set working at 360 voltage (ISI) with bronze impeller andstainless steel shaft having 120 Mtr head and 3000 lph dischare suitable ISI marked accessories such as starter(best qualityISI marked fully automatic electronic star delta ),main switch, fuse, capacitor, ELCB ,reflux valve, sluice valve, pressure gauge, earthing materials conforming to IS3043/2000 as amended to date ,ammeter ,voltmeter, selector switch, flickering lampsdry running preventer cum no voltage wire, conveying and erecting the motorpumpset and panel board and giving all connections earthing etc as per the KSEB/EIrules and regulations .Trial run should be given for 7 days . Any documentationrequired for proper electric connection shall be arranged by the contractor at theirown cost etc.. complete as per the directions of engineer in charge of the work |
| 9 | OD58838/2025-2026Supplying and erection of best quality ISI market brand ?open well submersibleThree phase drivenmotor pump set working at 360 voltage (IS 14220) with bronze impeller and stainlesssteel shaft having 70 mtr head 3000 lph dischare suitable ISI marked accessories such as starter(best quality ISI marked fully automaticelectronic star delta ),main switch, fuse, capacitor, ELCB,adequate length of best quality suitable size flat submersible cable, reflux valve,sluice valve, pressuregauge, earthing materials conforming to IS 3043/2000 as amended to date ,ammeter,voltmeter, selectorswitch, flickering lamps dry running preventer cum no voltage wire, GI CLB(medium)/column HDPE/ASTM pipesof suitable size and length , conveying and erecting the motor pumpset and panelboard and giving allconnections earthing etc as per the KSEB/EI rules and regulations .Trial run shouldbe given for 7 days .Any documentation required for proper electric connection shall be arranged by thecontractor at theirown cost etc.. complete as per the directions of engineer in charge of the work |
| 10 | OD58797/2025-2026hydro geologist test -bore well/open well |
| 11 | OD58798/2025-2026supply and erecting mobile starter for pump |
| 12 | OD58799/2025-2026water quality test |
| 13 | OD58800/2025-2026 supply and fixing name board |
| 14 | Sustainability Project 2025-2026-Repiar and Maintenance Mangalamkunn wss |
| 15 | OD62665/2025-2026Drilling for 150mm dia bore well,Cost of 180 mm dia PVC end Cap |
| 16 | 100.98.228Supply of PVC Pipe, 8kg/cm2, 180mm Dia. |
| 17 | 100.9.12Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches alreadymade, placing in position aligning the pipeline to the lines and levels and jointing thepipes and specials with solvent cement and testing the pipeline with water to therequired test pressure (excluding cost of pipes and specials): 180 mm nominal outsidediameter pipes. |
| 18 | 100.98.151Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 50mm Outer Dia |
| 19 | 100.9.5Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches alreadymade, placing in position aligning the pipeline to the lines and levels and jointing thepipes and specials with solvent cement and testing the pipeline with water to therequired test pressure (excluding cost of pipes and specials): 50 mm nominal outsidediameter pipes. |
| 20 | 2.1.1Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m inwidth as well as 10 sqm on plan including disposal of excavated earth up to 50 m andlift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil |
| 21 | 16.15.1Supplying at site:R.C.C. Standards post / struts / rails / pales of mix 1:1.5:3 ( 1cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size ) withwooden plugs or 6 mm bar nibs wherever required as per direction of Engineer-inCharge (cost of earth works in excavation, concrete works in foundation to be paidseparately) |
| 22 | 16.17.1Fencing with R.C.C. post placed at required distance, embedded in cement concreteblocks, every 15th post, last but one end post and corner post shall be strutted on bothsides and end post one side only, provided with horizontal lines and two diagonals ofbarbed wire weighing 9.38 kg per 100 metres (minimum), between the two postsfitted and fixed with G.I staples on wooden plugs or G.I binding wire tied to 6 mmbar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work andconcrete to be paid for separately):- Payment to be made per metre cost of total lengthof barbed wire used .With G.I barbed wire |
| 23 | 5.1.3Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mmnominal size derived from natural sources) |
| 24 | OD62767/2025-2026hydro geologist test -bore well/open well |
| 25 | OD62768/2025-2026Supply and fixing submersible cable for bore well pump (4qr ISI) |
| 26 | OD62769/2025-2026Supplying and erection of best quality ISI market brand bore well submersible Threephase driven motor pump set working at 360 voltage (ISI) with bronze impeller andstainless steel shaft having 120 mtr head and 5000 lph dischare suitable ISI marked accessories such as starter(best qualityISI marked fully automatic electronic star delta ),main switch, fuse, capacitor, ELCB ,reflux valve, sluice valve, pressure gauge, earthing materials conforming to IS3043/2000 as amended to date ,ammeter ,voltmeter, selector switch, flickering lampsdry running preventer cum no voltage wire, conveying and erecting the motorpumpset and panel board and giving all connections earthing etc as per the KSEB/EIrules and regulations .Trial run should be given for 7 days . Any documentationrequired for proper electric connection shall be arranged by the contractor at theirown cost etc.. complete as per the directions of engineer in charge of the work |
| 27 | OD62770/2025-2026supply and erecting mobile starter for pump |
| 28 | OD62771/2025-2026water quality test |
| 29 | Jalanidhi Sustainability Project 2025-2026- Kalichira wss |
| 30 | 100.54.5.2Desilting open wells of dia above 9.0m and up to 12.0m and depth up to 6.0m byearth work excavation in or under water, after closing the inlet valves and pluggingany holes in the steining by engaging divers with breathing accessories, bailing outwater using pump set of suitable capacity, lifting the excavated silt/mud/clay usingropes, pulleys and buckets and disposing the same within minimum lead of 50 m fromthe periphery of the well, including engaging coolies for scrapping the inner side ofthe well, without causing any damages to the existing structures and installations,including hire and conveyance of tools and plant and as per the directions of thedepartment officers etc. complete. |
| 31 | 100.7.1Bailing out water with 5HP engine and pump set including conveyance to the site,erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oiland other stores pay of staff etc., complete. |
| 32 | 13.37.1White washing with lime to give an even shade:New work (three or more coats) |
| 33 | 13.4.112 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) |
| 34 | 13.60.1Wall painting with acrylic emulsion paint of approved brand and manufacture to givean even shade:Two or more coats on new work |
| 35 | 22.6Providing and laying water proofing treatment on roofs of slabs by applying cementslurry mixed with water proofing cement compound consisting of applying : a) aftersurface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass clothwhen the first layer is still green. Overlaps of joints of fibre cloth should not be lessthan 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarsesand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by watercuring for 48 hours. The entire treatment will be taken upto 30 cm on parapet walland tucked into groove in parapet all around. d) fourth and final layer of brick tillingwith cement mortar (which will be paid for separately. For the purpose ofmeasurement the entire treated surface will be measured) |
| 36 | 5.1.3Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mmnominal size derived from natural sources) |
| 37 | 5.22A.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete above plinth level.Thermo - MechanicallyTreated bars of grade Fe-500D or more |
| 38 | 18.19.4.1Providing and fixing gun metal non-return valve of approved quality (screwed end):50 mm nominal boreHorizontal |
| 39 | OD58630/2025-2026water quality test |
| 40 | OD58631/2025-2026Supplying and erection of best quality ISI market brand ?open well submersibleThree phase drivenmotor pump set working at 360 voltage (IS 14220) with bronze impeller and stainlesssteel shaft having 40 mtr head and discharge 5000 lphsuitable ISI marked accessories such as starter(best quality ISI marked fully automaticelectronic star delta ),main switch, fuse, capacitor, ELCB,adequate length of best quality suitable size flat submersible cable, reflux valve,sluice valve, pressuregauge, earthing materials conforming to IS 3043/2000 as amended to date ,ammeter,voltmeter, selectorswitch, flickering lamps dry running preventer cum no voltage wire, GI CLB(medium)/column HDPE/ASTM pipesof suitable size and length , conveying and erecting the motor pumpset and panelboard and giving allconnections earthing etc as per the KSEB/EI rules and regulations .Trial run shouldbe given for 7 days .Any documentation required for proper electric connection shall be arranged by the contractor at theirown cost etc.. complete as per the directions of engineer in charge of the work |
| 41 | OD58632/2025-2026name board |
| 42 | OD58674/2025-2026supply and erecting mobile starter for pump |
| 43 | Jalanidhi Sustainability Project 2025-2026-Urava Mathamangalam wss |
| 44 | 13.37.1White washing with lime to give an even shade:New work (three or more coats) |
| 45 | 13.60.1Wall painting with acrylic emulsion paint of approved brand and manufacture to givean even shade:Two or more coats on new work |
| 46 | 13.4.112 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) |
| 47 | 22.6Providing and laying water proofing treatment on roofs of slabs by applying cementslurry mixed with water proofing cement compound consisting of applying : a) aftersurface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with waterproofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass clothwhen the first layer is still green. Overlaps of joints of fibre cloth should not be lessthan 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarsesand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by watercuring for 48 hours. The entire treatment will be taken upto 30 cm on parapet walland tucked into groove in parapet all around. d) fourth and final layer of brick tillingwith cement mortar (which will be paid for separately. For the purpose ofmeasurement the entire treated surface will be measured) |
| 48 | 2.1.1Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m inwidth as well as 10 sqm on plan including disposal of excavated earth up to 50 m andlift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil |
| 49 | 16.15.1 Supplying at site:R.C.C. Standards post / struts / rails / pales of mix 1:1.5:3 ( 1cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size ) withwooden plugs or 6 mm bar nibs wherever required as per direction of Engineer-inCharge (cost of earth works in excavation, concrete works in foundation to be paidseparately) |
| 50 | 16.17.1Fencing with R.C.C. post placed at required distance, embedded in cement concreteblocks, every 15th post, last but one end post and corner post shall be strutted on bothsides and end post one side only, provided with horizontal lines and two diagonals ofbarbed wire weighing 9.38 kg per 100 metres (minimum), between the two postsfitted and fixed with G.I staples on wooden plugs or G.I binding wire tied to 6 mmbar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work andconcrete to be paid for separately):- Payment to be made per metre cost of total lengthof barbed wire used .With G.I barbed wire |
| 51 | 5.1.3Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mmnominal size derived from natural sources) |
| 52 | 10.1Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approvedsteel primer all complete. |
| 53 | OD56797/2025-2026water quality test |
| 54 | OD56798/2025-2026Supplying and erection of best quality ISI market brand ?open well submersibleThree phase drivenmotor pump set working at 360 voltage (IS 14220) with bronze impeller and stainlesssteel shaft having 70 mtr head 6000 lph suitable ISI marked accessories such as starter(best quality ISI marked fully automaticelectronic star delta ),main switch, fuse, capacitor, ELCB,adequate length of best quality suitable size flat submersible cable, reflux valve,sluice valve, pressuregauge, earthing materials conforming to IS 3043/2000 as amended to date ,ammeter,voltmeter, selectorswitch, flickering lamps dry running preventer cum no voltage wire, GI CLB(medium)/column HDPE/ASTM pipesof suitable size and length , conveying and erecting the motor pumpset and panelboard and giving all connections earthing etc as per the KSEB/EI rules and regulations .Trial run shouldbe given for 7 days .Any documentation required for proper electric connection shall be arranged by thecontractor at theirown cost etc.. complete as per the directions of engineer in charge of the work |
| 55 | OD56799/2025-2026name board |
| 56 | Jalanidhi Sustainability Project 2025-2026-Vismaya Pilakkav wss |
| 57 | 100.7.1Bailing out water with 5HP engine and pump set including conveyance to the site,erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oiland other stores pay of staff etc., complete. |
| 58 | 100.54.3.2Desilting open wells of dia above 3.5m and up to 6.0m and depth up to 6.0m by earthwork excavation in or under water, after closing the inlet valves and plugging anyholes in the staining by engaging divers with breathing accessories, bailing out waterusing pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes,pulleys and buckets and disposing the same within minimum lead of 50 m from theperiphery of the well, including engaging coolies for scrapping the inner side of thewell, without causing any damages to the existing structures and installations,including hire and conveyance of tools and plant and as per the directions of thedepartment officers etc. complete. |
| 59 | 13.37.1White washing with lime to give an even shade:New work (three or more coats) |
| 60 | 13.60.1Wall painting with acrylic emulsion paint of approved brand and manufacture to givean even shade:Two or more coats on new work |
| 61 | 13.4.112 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) |
| 62 | 2.1.1Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m inwidth as well as 10 sqm on plan including disposal of excavated earth up to 50 m andlift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil |
| 63 | 16.15.1Supplying at site:R.C.C. Standards post / struts / rails / pales of mix 1:1.5:3 ( 1cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size ) withwooden plugs or 6 mm bar nibs wherever required as per direction of Engineer-inCharge (cost of earth works in excavation, concrete works in foundation to be paidseparately) |
| 64 | 16.17.1Fencing with R.C.C. post placed at required distance, embedded in cement concreteblocks, every 15th post, last but one end post and corner post shall be strutted on bothsides and end post one side only, provided with horizontal lines and two diagonals ofbarbed wire weighing 9.38 kg per 100 metres (minimum), between the two postsfitted and fixed with G.I staples on wooden plugs or G.I binding wire tied to 6 mmbar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work andconcrete to be paid for separately):- Payment to be made per metre cost of total lengthof barbed wire used .With G.I barbed wire |
| 65 | 5.1.3Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mmnominal size derived from natural sources) |
| 66 | 10.2Structural steel work riveted, bolted or welded in built up sections, trusses and framedwork, including cutting, hoisting, fixing in position and applying a priming coat ofapproved steel primer all complete. |
| 67 | 12.1.3Providing corrugate G.S. sheet roofing including vertical/ curved surface fixed withpolymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I.limpet washers or with G.I. limpet washers filled with white lead, including a coat ofapproved steel primer and two coats of approved paint on overlapping of sheetscomplete ( up to any pitch in horizontal / vertical or curved surfaces), excluding thecost of purlins, rafters and trusses and including cutting to size and shape whereverrequired.0.63 mm thick with zinc coating not less than 275 gm/m2 |
| 68 | 13.55.1Painting (two or more coats) on rain water, soil, waste and vent pipes and fittings withblack anticorrosive bitumastic paint of approved brand and manufacture, over andincluding a priming of ready mixed zinc chromate yellow primer on new work:100mm diameter pipes |
| 69 | 100.98.229Supply of PVC Pipe, 10kg/cm2, 20mm Dia |
| 70 | 100.9.1Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches alreadymade, placing in position aligning the pipeline to the lines and levels and jointing thepipes and specials with solvent cement and testing the pipeline with water to therequired test pressure (excluding cost of pipes and specials): 20 mm nominal outsidediameter pipes |
| 71 | 100.1.1Excavating trenches of required width for pipes, cables, etc., including excavation forsockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, includinggetting out the excavated soil, and then returning the soil as required, in layers notexceeding 20cm in depth, including consolidating each deposited layer by ramming,watering, etc., and disposing of surplus excavated soil as directed, within a lead of50m, in all kinds of soil |
| 72 | 100.60.18.1Repair work for 1m to 2m length in 15 mm (1/2 inch) house connections, using20mm PE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PP PN16 Compression specials, including trenching and refilling in all kinds of soil, hire fortools, cost of consumables and labour charges, cost of materials, including charges forlighting, watching, providing caution boards, traffic control etc. complete, butexcluding the cost of cutting of concrete / tarred / bituminous roads and as per thedirections of the department officers |
| 73 | 100.60.18.2Repair work for 1m to 2m length in 20mm (3/4 inch) house connections, using 25mmPE Pipe, PE80, PN16, Conforming to IS 4984: 2016 or later edition and PP PN 16Compression specials, including trenching and refilling in all kinds of soil, hire fortools, cost of consumables and labour charges, cost of materials, including charges forlighting, watching, providing caution boards, traffic control etc. complete, butexcluding the cost of cutting of concrete / tarred / bituminous roads and as per thedirections of the department officers |
| 74 | OD60272/2025-2026water quality test |
| 75 | OD60273/2025-2026Supplying and erection of best quality ISI market brand ?open well submersibleThree phase drivenmotor pump set working at 360 voltage (IS 14220) with bronze impeller and stainlesssteel shaft having 30 mtr head and dischare 5000 lph suitable ISI marked accessories such as starter(best quality ISI marked fully automaticelectronic star delta ),main switch, fuse, capacitor, ELCB,adequate length of best quality suitable size flat submersible cable, reflux valve,sluice valve, pressuregauge, earthing materials conforming to IS 3043/2000 as amended to date ,ammeter,voltmeter, selectorswitch, flickering lamps dry running preventer cum no voltage wire, GI CLB(medium)/column HDPE/ASTM pipesof suitable size and length , conveying and erecting the motor pumpset and panelboard and giving allconnections earthing etc as per the KSEB/EI rules and regulations .Trial run shouldbe given for 7 days .Any documentation required for proper electric connection shall be arranged by thecontractor at theirown cost etc.. complete as per the directions of engineer in charge of the work |
| 76 | OD60274/2025-2026name board |
| 77 | Jalanidhi Sustainability Project 2025-2026-Pazhashi Valluvadi wss |
| 78 | 13.37.1White washing with lime to give an even shade:New work (three or more coats) |
| 79 | 13.60.1Wall painting with acrylic emulsion paint of approved brand and manufacture to givean even shade:Two or more coats on new work |
| 80 | 13.4.112 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) |
| 81 | OD61177/2025-2026Supplying and erection of best quality ISI market brand ?open well submersibleThree phase drivenmotor pump set working at 360 voltage (IS 14220) with bronze impeller and stainlesssteel shaft having 60 mtr head dischare 5000 lphsuitable ISI marked accessories such as starter(best quality ISI marked fully automaticelectronic star delta ),main switch, fuse, capacitor, ELCB,adequate length of best quality suitable size flat submersible cable, reflux valve,sluice valve, pressuregauge, earthing materials conforming to IS 3043/2000 as amended to date ,ammeter,voltmeter, selectorswitch, flickering lamps dry running preventer cum no voltage wire, GI CLB(medium)/column HDPE/ASTM pipesof suitable size and length , conveying and erecting the motor pumpset and panelboard and giving allconnections earthing etc as per the KSEB/EI rules and regulations .Trial run shouldbe given for 7 days .Any documentation required for proper electric connection shall be arranged by thecontractor at theirown cost etc.. complete as per the directions of engineer in charge of the work |
| 82 | OD61178/2025-2026water quality test |
| 83 | OD61179/2025-2026name board |
| 84 | OD61188/2025-2026supply and erecting mobile starter for pump |
| 85 | Sustainability Project 2025-2026-Repiar and Maintenance Jalakanyaka vadakkanad wss |
| 86 | OD61279/2025-2026Drilling for 150mm dia bore well,Cost of 180 mm dia PVC end Cap |
| 87 | 100.98.228Supply of PVC Pipe, 8kg/cm2, 180mm Dia |
| 88 | 100.9.12Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches alreadymade, placing in position aligning the pipeline to the lines and levels and jointing thepipes and specials with solvent cement and testing the pipeline with water to therequired test pressure (excluding cost of pipes and specials): 180 mm nominal outsidediameter pipes. |
| 89 | 100.98.151Supply of HDPE Pipe PE 100 (IS 4984/1995), 10kg, 50mm Outer Dia |
| 90 | 100.98.234Supply of PVC Pipe, 10kg/cm2, 63mm Dia. |
| 91 | 100.9.6Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches alreadymade, placing in position aligning the pipeline to the lines and levels and jointing thepipes and specials with solvent cement and testing the pipeline with water to therequired test pressure (excluding cost of pipes and specials): 63 mm nominal outsidediameter pipes |
| 92 | Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches alreadymade, placing in position aligning the pipeline to the lines and levels and jointing thepipes and specials with solvent cement and testing the pipeline with water to therequired test pressure (excluding cost of pipes and specials): 50 mm nominal outsidediameter pipes |
| 93 | 12.1.3Providing corrugate G.S. sheet roofing including vertical/ curved surface fixed withpolymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I.limpet washers or with G.I. limpet washers filled with white lead, including a coat ofapproved steel primer and two coats of approved paint on overlapping of sheetscomplete ( up to any pitch in horizontal / vertical or curved surfaces), excluding thecost of purlins, rafters and trusses and including cutting to size and shape whereverrequired.0.63 mm thick with zinc coating not less than 275 gm/m2 |
| 94 | OD61309/2025-2026hydro geologist test -bore well/open well |
| 95 | OD61310/2025-2026Supply and fixing submersible cable for bore well pump (4qr ISI) |
| 96 | OD61311/2025-2026Supplying and erection of best quality ISI market brand bore well submersible Threephase driven motor pump set working at 360 voltage (ISI) with bronze impeller andstainless steel shaft having 120 mtr head dischare 5000 lph ,suitable ISI marked accessories such as starter(best qualityISI marked fully automatic electronic star delta ),main switch, fuse, capacitor, ELCB ,reflux valve, sluice valve, pressure gauge, earthing materials conforming to IS3043/2000 as amended to date ,ammeter ,voltmeter, selector switch, flickering lampsdry running preventer cum no voltage wire, conveying and erecting the motorpumpset and panel board and giving all connections earthing etc as per the KSEB/EIrules and regulations .Trial run should be given for 7 days . Any documentationrequired for proper electric connection shall be arranged by the contractor at theirown cost etc.. complete as per the directions of engineer in charge of the work |
| 97 | OD61312/2025-2026supply and erecting mobile starter for pump |
| 98 | OD61313/2025-2026water quality test |
| 99 | OD61314/2025-2026 name board Please Enable Macros to View BoQ information |