| 1 | Earth work in making diversion from ordinary soil by any means Including lead upto 100 m and lift 1.50m with manual compaction and proper completion of work as per direction engineer in charge . |
| 2 | Earth work in Strengthening of bank from ordinary soil by any means Including lead upto 100 m and lift 1.50m with manual compaction and proper completion of work as per direction engineer in charge . |
| 3 | Dismantalling of brick work in cement mortar including stacking of dismantled materials as directed by engineer-in- charge within a distance of 60M. |
| 4 | Dry Earth work in foundation of masonry work on channels of discharge below 10 cumecs , Including all lead & lift including disposal and back filling with all cost of labour and T & P etc. |
| 5 | Providing and laying of cement concrete 1 : 3 : 6 ( 1 cement : 3 Coarse sand : 6 stone grit 20-40 mm nominal size ) in foundation , Including supply of all materials , labour , tools & plants etc. required for proper completion of work. |
| 6 | Centering & shutering for R.C.C. work including all cost of material , labour and T & P etc. required for porper completion of the work . |
| 7 | Steel Bending , Binding , Cutting and Placing in proper position , Including all cost of labour and material T & P etc. required for porper completion of the work . |
| 8 | Laying CC of concrete grade 1:1.5:3 with coarse sand and stone grit size 4.75 mm to 20 mm and cement , Including all cost of material, labour and T&P etc. required for porper completion of the work. |
| 9 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , including the cost of material, finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge.(proportion as per design mix) |
| 10 | Dewatering by 5HP deisel pump including suction and delievery pipe, operator, Khalasi and POL complete with all respect |
| 11 | Providing and Placing 20 mm thick joint filler board with all cost of material , labour and T & P etc. |
| 12 | Finishing wlls with premium acrylic smooth exterior paint with silicone additves of required shade new work(two or more coats applied @.43ltr/10 sqm.Over and including priming coat of exterior primer applied @2.20 kg/10sqm ) (apex,ultima,weather coat all guard) asian Berger. |
| 13 | Brick masonry in 1:4 Cement and coarse sand mortar using class 150 bricks complete in all respect including all leads, lifts, all cost of material, labour and T&P etc. required for porper completion of the work. |
| 14 | Providing and fixing of 150/100 mm dia Hume CC pipe Length = (12.00+8.00)/2=10.00 including cost of labour materials T&P etc proper completion of work as perdirection of Engineer in charge. |
| 15 | 150mm dia |
| 16 | 100mm dia |
| 17 | Centering & shutering for R.C.C. work including all cost of material, labour and T&P etc. required for porper completion of the work. |
| 18 | Centering & shutering for C.C. work including all cost of material, labour and T&P etc. required for proper completion of the work. |
| 19 | Providing and laying R.C.C. of concrete mix 1:1.5:3 ( 1 cement: 1.5 coarse sand : 3 aggregate) in beams and slabs , including of all materials, labour, tools & plants and centering, shuttering etc. required for proper completion of work |
| 20 | S/F Drainage pipe in slab of 75 mm dia PVC including all cost of material, labour and T&P etc. required for proper completion of the work. |
| 21 | Deep Struck Cement Pointing in 1:2 ( 1 cement : 2 coarse sand) mortar including all cost of material, labour and T&P etc. required for proper completion of the work. |
| 22 | Preparation of sub-grade for lining work including all cost of labour T&P etc. required for proper completion of work. |
| 23 | Providing and laying C.C. Lining M-15 in cement coarse sand and grit 10-20mm in bed and side slope ncluding all cost of labour, material, shuttering and T&P etc.required for proper completion of work. |
| 24 | Supply and laying local sand under CC lining as sub-grade and filter including all cost of labour, material & T&P etc. required for proper completion of work. |
| 25 | Bitumen painting on top of sleepers including cost of all material fuel for heating, labour and T&P etc.required for proper completion of work. |
| 26 | Supplying & laying 200 micron L.D.P.E. film (sheet) above sub grade including all cost of labour, material & T&P etc. |
| 27 | Making Construction joint in cc lining bed and side slope filled with sealing compound including all cost of labour, material & T&P etc. required for proper completion of work. Please Enable Macros to View BoQ information |