| 1 | Description of Work |
| 2 | Removing and Refiting of Pumping Machinary |
| 3 | Excavation in general in soft material comprising of soft soil, Soft Murum, Sand, Hard Murum with Bouders in wet or dry condition for Head works. for Lift 0 to 1.5M and Lead of 150M including barricating,guarding,disposing of surplus excavated stuff within of radius 0.5km. as per Directed byEngineer in charge. |
| 4 | Excavation in General hard material comprising of soft Rockl, Hard Rock,Manjara Rock,etc by blasting / controled blasting, chiseling as required in wet or dry condition for Head works. for Lift 1.5 to 3M (105Cum), 3 to 4.5M (60cum) and Lead of 150M including barricating,guarding,disposing of surplus excavated stuff within of radius 0.5km. as per Directed byEngineer in charge. |
| 5 | Excavation in general in soft material comprising of soft soil, soft murum,sand,hard murum with boulders in wet or dry condition for head work allied works by well sinking process for avarage depth of 12M and lead of 150M including shoring, baricating, guarding, refilling, disposing off surplus excavated stuff as directed by engineer. (lift 4.5 to 6M for 60Cum) (lift 6 to 7.5M for 41Cum) total quantity 101 Cum |
| 6 | Providing 450 mm Dia ISI Standard RCC slotted pipes of NP-3 class including RCC collar, including taxes transportation etc. |
| 7 | Providing at site 40mm Gauge Pebbles |
| 8 | Provinding at Site 12 to 40mm Gauge Pebbles |
| 9 | Provinding at Site 6 to 12 mm Gauge Pebbles |
| 10 | Providing at site Course mm Gauge Pebbles |
| 11 | Providing at site Find Sand mm Guage Pebbles |
| 12 | Providing M-15 grade concrete at Site. Using material as per standard agrigate/sand/Cement 5.90bag per cum / water. ( Using concrete mixer at Site or RMC) |
| 13 | Labour Charges for Laying in situ cement Concrete M-15 for foundation,beding including bailing out water from work, compaction, curing etc complete |
| 14 | Dewatering the excavated trenches and pools of water in construction area using pump or other device including disposing of the water to safe distance as directed. |
| 15 | Refilling the trenches with and floor with available excavation stuff soil or Murum in 15 to 20 cm layers including watering and compaction compete. |
| 16 | Providing and filling around the well boulders filling of selected variety and size loading unloading cost of material labour, transportation etc complete with |
| 17 | Labour Charges for Lowering, laying and joining NP-3 Class RCC slotted pipes of 450mm Diameter of total RCC pipe length 60RMT |
| 18 | Labour Charges for Lowering, and Placing in position shrouting material for porous pipe, Gallery / Slotted pipe gallery / trench gallery with all lead and lift. For material 40mm gauge pebbles, 12 to 40mm gauge pebbles, 6 to 12mm gauge pebbles, course sand pebbles and fine sand pebles. ( 27cubic meter quantity of each material) total quantity 135 cubic meter. Please Enable Macros to View BoQ information |