|
| 1 | Earth work in excavation by mechanical means(hydraulic excavator) in trenches for foundations, drain, pipes,cables, etc (not exceeding 1.5m in width ) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottom lifts up to 1.5mtr including getting out excavated earth and disposal of surplus excavated earth as directed within a leads of 50mtr.(A) All kinds of soil. |
| 2 | Extra for every additional lift of 1.5 m or part there of in excavation/ banking excavated or stacked materials. |
| 3 | Dry stone pitching and thickness in horizontal in horizantal on level including cost of stone. |
| 4 | Reinforced cement concrete work in wall, walls (any thickness) including attached pilasters, buttresses plinth and string courses, fillets columns pillar ,piers, abutments posts and struts up to floor five level includingcuring but excluding cost of centring and shuttering finishing and reinforcement M20 grade (crushed) |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth with bond stone. |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centring, shuttering , finishing and reinforcement -All work up to plinth level 1:2:4 ( 1 cement :2 coarse sand :4 graded stone aggregate 20mm nominals size (crushed). |
| 7 | Refilling of excavated earth arrount foundation trench I/C ramming and consolidations complete. |
| 8 | Dumping soling stone in bed of foundation tightly handpacked and laid well 10cm thick including cost of stone i.e horizontal on level. |
| 9 | Centering and shuttering including strutting and proping and removal of form work for walls, Walls (anythickness) etc. |
| 10 | Centering and shuttering including strutting and proping and removal of form work for Suspended floors roofs, landing balcones and access platforms etc. |
| 11 | Centering and shuttering including strutting and proping and removal of form work for Foundations ,Footings etc. |
| 12 | Edges of slab etc. |
| 13 | Steel reinforcement for RCC work including straightening cutting bending placing in position and binding placing in position and binding all complete up to plinth level T.Mt bars etc. |
| 14 | Providing and fixing of HDPE Pipe 125 mm (PE- 16 & PN-100) including all necessary fittings and excavation of trenches filling of earth carriage complete. |
| 15 | Dewatering of water from dug well and sump tank site. Complete. |
| 16 | Carriage of different material from sources to site of work including loading unloading and stacking complete .(A) Sand for an avge leads of 05 km by MT |
| 17 | B) Stone aggreagte for an avge leads of 15 km by MT |
| 18 | C) Cement for an avg leads of 15 km by MT. |
| 19 | D)Steel for an avg leads of 15 km by MT. |
| 20 | E) Soling Stone for an avg leads of 10 km by MT Please Enable Macros to View BoQ information |