|
| 1 | Dismentaling Reinforcement cement concrete including stacking of dismantled material with in 60M distance. as directed by Engineer-in-Charge |
| 2 | Dismentaling Brick work including stacking of material with in a distance of 60M as directed by Engineer-in-Charge |
| 3 | Dismentaling cement concrete including stacking of dismantled material with in 60M distance. as directed by Engineer-in-Charge |
| 4 | E/W in foundation in all kind of soil with all lead and lift and including back filling, watering, ramming of excavated earth into the trenches and removal and disposal of surplus earth as directed by Engineer-in-charge within a distance of 30M from the foundation trenches. |
| 5 | Making sub-grade for lining work including watering compaction and preparationof surface. as directed by Engineer-in-charge |
| 6 | Centering and shuttering for C.C/R.C.C. work including cost of all materials, labour and T&P etc for proper completion of work as per direction by Engineer-in-Charge |
| 7 | Centering & shuttering of plain C.C work in different part of structure with all leads & lifts required for proper completion of work including cost of all material, labour scaffolding, T&P & labour etc. |
| 8 | Laying of C.C in (1:2:4) with stone ballast (12.5mm to 20mm) size and coarse sand FM not less than 2 including all cost of materials labour and T&P complete.as per direction by Engineer in charge. |
| 9 | Bending, binding ,cutting,placing in position steel reinforcement including materials with cost of binding wire and tack welding for proper completion of work. As per direction of Engineer in Charge. |
| 10 | Laying R.C.C (1:1:2), M25 grade with coarse sand FM not less than 2 and hard crushed Aggregate of specified grade including all lead, lift, machanical mixing, labour and T&P complete.as per direction by Engineer in charge. |
| 11 | Providing and laying stone grite of 100mm, size( 4.75 mm to 10 mm) as filtring material including cost of all material,labour and T&P for proper completion of work as directed by Engineer-In-Charge as per drawing and I.D. specification. |
| 12 | Supply and laying 100mm of course sand FM not less than 2 in inverted filtter . Including cost of all labour, Material, T & P required for proper completion of work |
| 13 | Providing and laying 150 micron thick L.D.P.E film(first grade) with cost of all material,labour and T&P for proper completion of work as directed by Engineer-In-Charge as per drawing and I.D. specification. |
| 14 | Earth work in making Road Diversion for V.R.B. Construction including all lead , lift, labour and T&P etc.as per direction of engineer in charge |
| 15 | Supplying and laying PVC Pipe including material, labour,T&P etc. complete work directed by Engineer-in-charge. |
| 16 | Boring with 100 mm diameter casing pipe including lowering and extraction of assembly, loading, unloading and carriage including cost of all materials, labour and T&P etc. complete work As per Engineer-in-charge as per drawing and I.D.Technical specification. |
| 17 | Running of 10 H.P. genrator set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work. |
| 18 | Earth work in removing of diversion and correction of bank including cost of labour and T&P with proper completion of work approved by Engineer-in-charge as per drawing and I.D. specification. |
| 19 | Painting of wall with two coat water proofing cement paint of approved quality including preparation of surface on Structure including with all materials,labour and T&P etc. as directed by Engineer-in-Charge as per I.D. specification. |
| 20 | Dry brick on edge soling with M150 1st class brick including preparation of sub-grade to prescribed camber, filling joint with Local sand including cost of material, labour and T&P etc for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification. Please Enable Macros to View BoQ information |