|
| 1 | वार्ड सं० 68 कोनिया अन्तर्गत मो० विजयीपुरा में माँ अन्नपूर्णा स्कूल होते हुए हर्ष इण्टर कालेज तक व कल्याण योग केन्द्र से माता पार्वती मन्दिर तक सड़क निर्माण का कार्य | |
| 2 | Dismantlling of exist stone chauka including allcomplete. NNV |
| 3 | Earth work in cutting and cartage up to 8 km. with all complete.(SOR -SI No. CARTAGE 231a +253 E/W) |
| 4 | S/L and Compaction of G.S.B. with all complete. |
| 5 | P/L of Cement concrete work in 1:4:8 with C, F/sand & 40 mm Stone Ballast with all complete. SOR SI No. -281 |
| 6 | S/L of 25 micron polythene sheet as per site with all complete. |
| 7 | P/L of CC in 1:1.5:3 with c, c/sand & 20 mm stone grit with all complete. SOR SI No. -279B |
| 8 | S/L of precosted C.C. block K.C. drain of app. Design and mix over 3\\" thick 1:6:12 base concrete with B/B ,F/Sand & Cement and E/W etc. all complete. NNA |
| 9 | Providing & Laying of tack coat of bitumin 80/100 @0.25 kg per sqm with all complete. |
| 10 | Providing & Laying dense graded bituminous macadam with higher capacity batch type HMP using crushed grading, premixed with bituminous binder @ 5.4 per cent by weight of total mix and filter, transporting the hot mix to work site etc all complete work.Spe.clause No. 505 |
| 11 | Providing & Laying dense graded bituminous macadam with higher capacity batch type HMP using crushed grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filter, transporting the hot mix to work site etc all complete work.Spe.clause No. 507 |
| 12 | Raising & Repairing of H.D.P. with all complete.(Rate Analysis Sanction by NNV &PWD)(Rate Teandar) |
| 13 | Raising & Repairing of M. H. up to 30 cm with all complete.((Rate Teandar) |
| 14 | Construction of Gully pit of size 0.60.x0.60x0.90 Mtr. Including Gully grating with all complete. (Rate Analysis Sanction by NNV &PWD) |
| 15 | Supply, laying and jointing of 110 mm dia PVC pipe for connection of gully pit with existing manhole with all complete. NNA |
| 16 | B/W in sub structure for side wall with cement mortar in 1:3 (C : F/sand )etc. all complete. SOR SI No. 307+309 |
| 17 | S/F of heavy duty M.H. Cover with frame etc. all complete..(Rate Analysis Sanction by NNV &PWD) |
| 18 | S/F of sign board with all complete |
| 19 | Add GST @ 18% Please Enable Macros to View BoQ information |