|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres, as directed byEngineer-in-Charge. |
| 2 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 4 | Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 5 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete(Coping) |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete above plinth level Cold twisted bars |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs Under 20 cm wide |
| 10 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 11 | Dry random rubble masonry with hard stone in foundation and plinth with bond stone. |
| 12 | Hand-packing stones filling in wire-crates; including cost of crates and stones. |
| 13 | Dumping stone including cost of stones in Horizontal on level |
| 14 | Providing and laying watering and compacting in layers not exceeding 200mm thick with 80-100KN roller,river bed material free from organic material mixed with coarse aggregate round nallah shingle max. aggregate size 75mm thick including carriage from source to site of work including of all leads and lift complete. |
| 15 | Providing and laying non-pressure of specified class R.C.C. pipesincluding collars/spigot jointed with stiff mixture of cement mortar in theproportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc.complete.1000 mm dia. R.C.C. pipe (laying by manual/mechanicalmeans) 1000 mm dia. R.C.C. pipe (laying by manual/mechanical |
| 16 | Providing, laying, spreading and compacting graded stone aggregate (sizerange 53 mm to 0.075 mm ) to wet mix macadam (WMM) specificationincluding premixing the material with water at OMC in mechanical mixplant, carriage of mixed material by tipper to site, for all leads & lifts,laying in uniform layers with mechanical paver finisher in sub- base / basecourse on well prepared surface and compacting with vibratory roller of 8to 10 tonne capacity to achieve the desired density, complete as perspecifications and directions of Engineer-in-Charge |
| 17 | Providing and applying tack coat using hot straight run bitumen ofgrade – VG-30, including heating the bitumen, spraying the bitumenwith mechanically operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as per specifications On W.B.M. @ 0.75 Kg/sqm. |
| 18 | 2 cm premix carpet surfacing with 1.8cum and 0.90 cum of stonechippings of 13.2 mm size and 11.2 size respectively, per 100 sqm and52kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mmand 11.2 mm size respectively including a tack coat with hot straight runbitumen, including consolidation with road roller of 6 to 9 tonne capacityetc. complete (tack coat to be paid for separately).With paving Asphalt grade VG-30 with no solvent. |
| 19 | Providing and laying seal coat of premixed fine aggregate (passing2.36 mm and retained on 180 micron sieve) with bitumen using 128 kgof bitumen of grade VG-30 bitumen per cum of fine aggregate and0.60 cum of fine aggregate per 100 sqm of road surface includingrolling and finishing with road all complete |
| 20 | Carriage of Material by mechanical transport from source to site of work includidng loading/un-loading completeSand / Stone aggregate below 40 mm for average distance 35.0 km |
| 21 | Stone aggregate Above 40 mm for average distance 35.0 km |
| 22 | Stone for an average lead of 20.0 Km Please Enable Macros to View BoQ information |