| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope I and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 8000 m as per Technical Specification Clause 301.5 |
| 2 | Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC Nominal mix 1:4:8 (Hand mixed) |
| 3 | Construction of granular sub base by proiding wel graded material, spreding in uniform layours on prepared 3 surface, mixing by mix in place method and compacting disered density, as per Specification clause 401 |
| 4 | Providing, Laying, Spreading and compacting WBM grading-3 stone aggregates of specific sizes ot water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel 80-100 KN static roller in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density, complete as per Technical Specfication Clause 405. |
| 5 | M-150 Brick Work in 1:4 one cement & coase sand in foundation and plinth including supply of all materials labour, Tools & Plants etc. required for proper completion of the work. S.I.No. 305 (a) |
| 6 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, |
| 7 | CC work in 1:2:4 Cement coarse sand and 20mm stone grit including supply of all materils, labour T&P etc SINO-279(a) |
| 8 | 12 mm thick plaster in 1:4 Cement and Coarse sand mortar over brick work minimum thickness not to be less than I cm. including supply of all materials, labour, Tools & Plants etc. S.I.No. 584 New Item |
| 9 | Providing concrete for reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203, R.C.C grade M 20 |
| 10 | Supplying, fitting and placing TMT bar reinforcement (Fe 9 550) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 11 | Supply & fixing of MS Sign Board i/c painting, letter writing etc. complete. Please Enable Macros to View BoQ information |