|
| 1 | PARTICULARS |
| 2 | Excavation of soil up to a depth of 1.5 m for foundation, trench, drain, compaction of the bottom, watering, leveling of the sides, removal of excavated soil, filling of voids after filling of foundation with soil again and drainage of the remaining soil up to a distance of 50 m |
| 3 | Providing & Laying cement concrete foundation or floor, use 40 mm nominal size crusher broken/brick clay, cement-sand mixture in the ratio of 1 cement: 4 sand: 8 aggregates and ramming, including weeding. |
| 4 | Providing & Laying of cement concrete 1:1.5:3 mix in mixed cement concrete, including cladding of roof slabs, eaves, beams, lintels etc., plastering and levelling of surface with 1:3 cement mortar etc. but cost of steel and shuttering separately. |
| 5 | Installation of shuttering (fabric and cast) for laying RCC elements up to 4.5m height and removal etc. as per specifications. |
| 6 | Supplying and stacking good earth at site of work. Note: 1) Loading, unloading and carriage to be paid extra as per actual lead.2) Earth measured in stacks will be reduced by 20% foe payment |
| 7 | Supply of Steel Reinforcement including cutting, bending, fitting and fastening of iron for RCC work. |
| 8 | Cement plastering involves applying a mixture of cement and gravel in a 1:6 ratio to the wall, ramming the joints, and regular wetting for 14 days. 20mm Thick |
| 9 | Painting two coats including primer coat after filling the surface with synthetic enamel paint inall shades on new, plastered / concrete surfaces as per drawing and MoRTH Specification Clause 801 |
| 10 | Plantation of various types of plants of road side and divider as required inluding Purchasing of plants as required |
| 11 | Supply and Fixing of Pole OЕM fabricated hot dipped galvanized M.S. Overhang (48.3 X 3.25 mm) with cap (250x 88.9 / 114.3 x 3.25mm) over the existing poles.18.2.2 Double arm overhang |
| 12 | Providing and laying RCC Foundation for octagonal/ Conical street light poles. High msat poles as per Drawing attach at table P-4 with following procedure & All as per pre approved by Engineer in charge for additional technical parameters of products/work refer annexure \\"A\\" attached with this BSR.A) Excavation of pit for foundation Size upto required depth from ground level.B) Dressing of pit and dry stone pitching 200mm thick includingsupply of stones and preparing surface complete.C) Providing and laying in position cement concrete of M-10 grade of 75mm thickness.D) Reinforcement for RCC work with TMT bars including straightening, cutting, hending, placingin position and binding all complete.E) Centring & Shuttering including sturing, propping etc. and removal of from work for footing and pedstal.F)providing & fixing of 2 no. Required size PLB HDPE pipe & Foundation Bolt with template as per OEM recommendations.G) Providing and laying reinforce cement concrete of M-25 grade in footing and pedestal including curing the foundation for 7 days. H) Providing and fixing nosing Angle 40 mm X 40 mmX 6mm with 2 no. 100 mm long, 10mm dia. lugs on each face pole foundation for Pole Foundation for Octagonal pole from 3 Mtr. To 6 Mtr. |
| 13 | Supply and erection of Galvanized Iron pole with galvanizing done in single dipping (Average coating thickness Minimum 65 Microns) continuously tapered poles having Octagonal / Circular crosssections designed to withstand the maximum wind speed as per IS 875, The pole shaft shall be made from sheet steel (HT Steel Conforming to grade S355JO) and confirming to BSEN 10025 and shall be continuously tapered with single longitudinal welding. There shall not be any circumferential welding. The welding of pole shaft shall be done by Submerged Arc Welding (SAW) process. pole shafts shall be provided with the rigid flange plate of suitable thickness (Fe 410 conforming to IS 226 / IS 2062) with provision for fixing 4 no. foundation bolts, This base plate shall be fillet welded to the pole shaft at two locations i.e. from inside and outside.The octagonal Poles shall have lockable door of approximate 500 mm length at the elevation of 500 mm from the Base plate with bakelite sheet having 6A SP MCB and 16 sqmm stud type connector ( 4 nos) inside the pole at door opening for cable connection of following length and dimension as per table P-01 with base plate and foundation bolt on the Existing cement concrete foundation.All as per pre approved by Engineer in-charge. For additional technical parameters of |
| 14 | Providing & Fixing of IK08 IP-66 protected high power LED flood light system with single piece Pressure diecast aluminium housing, toughened glass with suitable lenses on LED / integrated lens diffuser to achieve various beam angles, of high-power LED of 3 to 5 watt each. Integrated metal case potted driver as a unique BIS R number (as per IS 15885) having efficiency more than 85% and in compliance to BIS certified and Trade mark certificate (Fitting & driver both have separate BIS R number). The System level Luminaire efficacy >=130 Im/ wt. LED driver Input Voltage AC 120 to 270 V AC with High voltage Cutoff @>=300 V AC & Low Voltage cutoff >=90 V AC and Auto resetting Safety. Power Factor >0.95, THD(I) <10%, LED driving output current <=750mA. driver should be Phase to phase protection of 440 V for 4 Hrs. Electrical Connector, Surge Protection Min >=4KV internal and 10KV external but inside driver compartment, System life of 50000 Burning hours with 70% of Initial Lumens maintained, CRI>70 and CCТ 5700K ±355K as required. 18.11.1 High Power LED Flood Light Minimum lumen output 6500 Im |
| 15 | P AND LAYING OF PVC/XLPE INSULATED AND PVC SHEATED CABLE OF 1.1 KV GRADE WITH ALUMINIUM CONDUCTOR 4.0 SQ MM 4 CORE AROMED CABLE |
| 16 | PROVIDING AND FIXING OF FUSE BOX SIZE 250H 200W 150D MM FABRICATED OF 16 MM MS SHEET WITH HINGED COVER DUST AND VERMIN PROOF RUBEER GASKET LOCKING ARRANGMENT DULY HOLDED WITH 2 NOS POLE CLAMPS OF 20 MM 3 MM FLAT NUT AND BOLTS |
| 17 | PLATE EARTHING WITH HOT DIPPED GI EARTH PLATE OF SIZE 600MM MM BY EMBODYING 3 TO 4 MTR BELOW THE GROUND LEVEL WITH 20MM DIA GI B CLASS WATERING PIPE |
| 18 | PROVIDING AND FIXING OF SURFACE MOUNTING HEAVY DUTY HORIZONTAL TYPE DOUBLE DOOR DISTRIBUTION BOARD WITH METAL END BOX MADE OUT FROM GALVANIZED STEEL Please Enable Macros to View BoQ information |