| 1 | Clearing boundary line to a width of 1.5 M to facilitate Survey |
| 2 | Survey with prismatic compass |
| 3 | Providing & fixing 15×15×90 cm boundary stone of hard stone |
| 4 | Slash Felling where ever necessary in entire area |
| 5 | Heaping the debris after the extraction of Acacia |
| 6 | Collection of 60 Cm Bamboo, reed or wooden stakes for aligning and staking |
| 7 | Transport of stakes |
| 8 | Digging pits of size 45×45×45 CM in type Hard Soil After Rain |
| 9 | Transporting charges of Basket cover seedlings from on site Nursery to planting site including loading and unloading charges |
| 10 | Head load Transport of big Basket seedlings to planting sites & distribution up to a lead of 50 Metres (including for casualty replacement 10 %) |
| 11 | Making Rain water harvesitng pits (1.5×0.5×0.5= 0.375M3), 30 Nos× 0.375= 11.25 M3 |
| 12 | Covering pits, digging planting holes and planting seedlings |
| 13 | First year First Weeding (1.0 Ha planted area and selective Removal in 5.40 Ha) (May-June) |
| 14 | First year Second Weeding (1.0 Ha planted area and selective Removal in 3.0 Ha)(Aug-Sep) |
| 15 | First year Third Weeding (1.0 Ha planted area and selective Removal in 2.0 Ha) (Dec-Jan) |
| 16 | Making Platform of size 1m × 1 m with 30/2 Cm depth inward slopes (June-July) |
| 17 | Replacing Casualtiesusing Big Basket seedlings |
| 18 | First Uprooting of existing invasive species like Acacia, Mangium seedlings etc. by manual means for the entire area of the plantation for assisting natural regeneration wherever necessary |
| 19 | Second time Uprooting of existing invasive species like Acacia, Mangium seedlings etc. by manual means for the entire area of the plantation for assisting natural regeneration wherever necessary |
| 20 | Third time Uprooting of existing invasive species like Acacia, Mangium seedlings etc. by manual means for the entire area of the plantation for assisting natural regeneration wherever necessary |
| 21 | Clearing boundary line to a width of 5.2 metre on either side to prevent the fire (Decemebr- January) |
| 22 | Provision for sign board6''×4' and plantation boards including cost of materials and erecting charges etc. complete |
| 23 | Contractor Profit |
| 24 | Contingencies including cost of pesticides, fungicides, Kerosene etc. |
| 25 | VDA Please Enable Macros to View BoQ information |