|
| 1 | DESCRIPTION OF ITEMS |
| 2 | Maintenance and servicing of existing DG Set of capacity 30 KVA Make- Kirlosker DG set at Sig Coy including replacement of filters,dis -assembling of operating mechanism / parts, well cleaning with chemicals, replacing unserviceable parts / assessories, oiling / greasing of complete moving parts, calibration and resetting of governer by the rep of reputed manufacturer, cleaning of injector nozzle, cleaning/descaling of radiator assembly with cleaning agent, removal of all deposited materials including oiling / greasing of exhaust fan & bearing etc. including re - assembling the DG set after replacing the unserviceable parts and components etc. and making DG Set in perfect operational in manual and electrical mode, complete all as directed including testing of DG Set at full load.Note:- (i) Spare parts will be measured and paid seperately under respective items of Sch 'A'. (ii) Make of parts shall be same as per existing make. |
| 3 | (a) Rubber hose pipes with fixing clamps |
| 4 | (b) Lubrication oil filter |
| 5 | (c) Fuel filters |
| 6 | (d) Fuel pipe duly covered with supper fine steel wire with coupling , nut and bolts. |
| 7 | (e) Engine gasket. |
| 8 | (f) Lubrication Oil, Make - Castrol Servo. |
| 9 | (g) Air filter |
| 10 | (h) Replacement of Hose: Air Cleaner. |
| 11 | (j) Replacement of Gasket: Oil filter |
| 12 | Maintenance and servicing of existing 25KVA Make- Cummins at 1J dte unit DG set including replacement of filters,dis -assembling of operating mechanism / parts, well cleaning with chemicals, replacing unserviceable parts / assessories, oiling / greasing of complete moving parts, calibration and resetting of governer by the rep of reputed manufacturer, cleaning of injector nozzle, cleaning/descaling of radiator assembly with cleaning agent, removal of all deposited materials including oiling / greasing of exhaust fan & bearing etc. including re - assembling the DG set after replacing the unserviceable parts and components etc. and making DG Set in perfect operational in manual and electrical mode, complete all as directed including testing of DG Set at full load.Note:- (i) Spare parts will be measured and paid seperately under respective items of Sch 'A'. (ii) Make of parts shall be same as per existing make. |
| 13 | (a) Rubber hose pipes with fixing clamps |
| 14 | (b) Lubrication oil filter |
| 15 | (c) Fuel filters |
| 16 | (d) Fuel pipe duly covered with supper fine steel wire with coupling , nut and bolts. |
| 17 | (e) Engine gasket. |
| 18 | (f) Lubrication Oil, Make - Castrol Servo. |
| 19 | (g) Air filter |
| 20 | (h) Replacement of Hose: Air Cleaner. |
| 21 | (j) Replacement of Gasket: Oil filter |
| 22 | Maintenance and servicing of existing 40 KVA DG set Make- Greaves cotton at DAM Booster including replacement of filters,dis -assembling of operating mechanism / parts, well cleaning with chemicals, replacing unserviceable parts / assessories, oiling / greasing of complete moving parts, calibration and resetting of governer by the rep of reputed manufacturer, cleaning of injector nozzle, cleaning/descaling of radiator assembly with cleaning agent, removal of all deposited materials including oiling / greasing of exhaust fan & bearing etc. including re - assembling the DG set after replacing the unserviceable parts and components etc. and making DG Set in perfect operational in manual and electrical mode, complete all as directed including testing of DG Set at full load.Note:- (i) Spare parts will be measured and paid seperately under respective items of Sch 'A'. (ii) Make of parts shall be same as per existing make. |
| 23 | (a) Rubber hose pipes with fixing clamps |
| 24 | (b) Lubrication oil filter |
| 25 | (c) Fuel filters |
| 26 | (e) Fuel pipe duly covered with supper fine steel wire with coupling , nut and bolts. |
| 27 | (f) Engine gasket. |
| 28 | (g) Lubrication Oil, Make - Castrol Servo. |
| 29 | (h) Air filter |
| 30 | (j) Replacement of Hose: Air Cleaner. |
| 31 | (k) Replacement of Gasket: Oil filter |
| 32 | Maintenance and servicing of existing 58.5 KVA DG set Make- Kirlosker at Kumaun Unit including replacement of filters,dis -assembling of operating mechanism / parts, well cleaning with chemicals, replacing unserviceable parts / assessories, oiling / greasing of complete moving parts, calibration and resetting of governer by the rep of reputed manufacturer, cleaning of injector nozzle, cleaning/descaling of radiator assembly with cleaning agent, removal of all deposited materials including oiling / greasing of exhaust fan & bearing etc. including re - assembling the DG set after replacing the unserviceable parts and components etc. and making DG Set in perfect operational in manual and electrical mode, complete all as directed including testing of DG Set at full load.Note:- (i) Spare parts will be measured and paid seperately under respective items of Sch 'A'. (ii) Make of parts shall be same as per existing make. |
| 33 | (a) Rubber hose pipes with fixing clamps |
| 34 | (b) Lubrication oil filter |
| 35 | (c) Fuel filters |
| 36 | (e) Fuel pipe duly covered with supper fine steel wire with coupling , nut and bolts. |
| 37 | (f) Engine gasket. |
| 38 | (g) Lubrication Oil, Make - Castrol Servo. |
| 39 | (h) Air filter |
| 40 | (j) Replacement of Hose: Air Cleaner. |
| 41 | (k)Replacement of Gasket: oil filter |
| 42 | Maintenance and complete servicing of existing DG Set of capacity 320 KVA at SS -09 Make Kirlosker including replacement of filters,dis-assembling of operating mechanism / parts, well cleaning with chemicals, replacing unserviceable parts / assessories, oiling / greasing of complete moving parts, calibration and resetting of governer by the rep of reputed manufacturer, cleaning of injector nozzle, cleaning/descaling of radiator assembly with cleaning agent, removal of all deposited materials including oiling / greasing of exhaust fan & bearing etc. including re - assembling the DG set after replacing the unserviceable parts and components etc. and making DG Set in perfect operational in manual and electrical mode, complete all as directed. Note:- (i) Spare parts will be measured and paid seperately under respective items of Sch 'A'. (ii) Make of parts shall be same as per existing make |
| 43 | Supply only the following spare part of existing make & size, suitable for DG Set 320 KVA complete in all respect & as directed. :-(a) Rubber hose pipes with fixing clamps |
| 44 | (a) Lubrication oil filter |
| 45 | (b) Fuel filters |
| 46 | (c) Lubrication Oil, Make - Castrol Servo. |
| 47 | Supply and filling of Urea AUS-32 Grade of 5 Ltr bucket complete all as specified and directed |
| 48 | Maintenance and complete servicing of existing DG Set of capacity 200 KVA Make Cummins at MAP Pump House including replacement of filters,dis-assembling of operating mechanism / parts, well cleaning with chemicals, replacing unserviceable parts / assessories, oiling / greasing of complete moving parts, calibration and resetting of governer by the rep of reputed manufacturer, cleaning of injector nozzle, cleaning/descaling of radiator assembly with cleaning agent, removal of all deposited materials including oiling / greasing of exhaust fan & bearing etc. including re - assembling the DG set after replacing the unserviceable parts and components etc. and making DG Set in perfect operational in manual and electrical mode, complete all as directed. Note:- (i) Spare parts will be measured and paid seperately under respective items of Sch 'A'. (ii) Make of parts shall be same as per existing make |
| 49 | (a) Rubber hose pipes with fixing clamps |
| 50 | (b) Lubrication oil filter |
| 51 | (c) Fuel filters |
| 52 | (d) By Pass filters (as per sample) |
| 53 | (e) Fuel pipe duly covered with supper fine steel wire with coupling , nut and bolts. |
| 54 | (f) Fan belt (as per sample) Make:- Fanner |
| 55 | (g) Engine gasket. |
| 56 | (h) Lubrication Oil, Make - Castrol Servo. |
| 57 | (J) Air filter |
| 58 | (k) Replacement of Hose: Air Cleaner. |
| 59 | (l)Replacement of Gasket: oil filter |
| 60 | Maintenance and complete servicing of existing DG Set of capacity 160 KVA Make Cummins at MH Oxygen plant including replacement of filters,dis -assembling of operating mechanism / parts, well cleaning with chemicals, replacing unserviceable parts / assessories, oiling / greasing of complete moving parts, calibration and resetting of governer by the rep of reputed manufacturer, cleaning of injector nozzle, cleaning/descaling of radiator assembly with cleaning agent, removal of all deposited materials including oiling / greasing of exhaust fan & bearing etc. including re - assembling the DG set after replacing the unserviceable parts and components etc. and making DG Set in perfect operational in manual and electrical mode, complete all as directed including testing of DG Set at full load.Note:- (i) Spare parts will be measured and paid seperately under respective items of Sch 'A'. (ii) Make of parts shall be same as per existing make. |
| 61 | (a) Lubrication oil filter |
| 62 | (b) Fuel filters |
| 63 | (c) By Pass filters (as per sample) |
| 64 | (d) Lubrication Oil, Make - Castrol Servo. |
| 65 | (e) Air filter |
| 66 | (f) Replacement of Hose: Air Cleaner. |
| 67 | (g)Replacement of Gasket: oil filter |
| 68 | Maintenance and complete servicing of existing DG Set of capacity 125 KVA Make cummins at STP KAsni, STP ARO and Make Greaves cotton at MI Room MH including replacement of filters,dis -assembling of operating mechanism / parts, well cleaning with chemicals, replacing unserviceable parts / assessories, oiling / greasing of complete moving parts, calibration and resetting of governer by the rep of reputed manufacturer, cleaning of injector nozzle, cleaning/descaling of radiator assembly with cleaning agent, removal of all deposited materials including oiling / greasing of exhaust fan & bearing etc. including re - assembling the DG set after replacing the unserviceable parts and components etc. and making DG Set in perfect operational in manual and electrical mode, complete all as directed including testing of DG Set at full load.Note:- (i) Spare parts will be measured and paid seperately under respective items of Sch 'A'. (ii) Make of parts shall be same as per existing make. |
| 69 | (a) Rubber hose pipes with fixing clamps |
| 70 | (b) Lubrication oil filter |
| 71 | (c) Fuel filters |
| 72 | (d) By Pass filters (as per sample) |
| 73 | (e) Fuel pipe duly covered with supper fine steel wire with coupling , nut and bolts. |
| 74 | (f) Fan belt (as per sample) Make:- Fanner |
| 75 | (g) Engine gasket. |
| 76 | (h) Lubrication Oil, Make - Castrol Servo. |
| 77 | (J) Air filter |
| 78 | (k) Replacement of Hose: Air Cleaner. |
| 79 | (l)Replacement of Gasket: oil filter |
| 80 | (m)Replacement of display |
| 81 | (n)Replacement of sensor |
| 82 | Servicing to AMF panels of 160KVA DG Capacity set Make- Cummins at Oxygen plant MH including cleaning with blower, cleaning with CRC spray,checking the bus bar connections /power cable from main bus bar to ACBs/MCCBs and out going cable coonections , tightening of all bolts,nuts at power cables/ bus bar/ outgoing cables including replacement of damaged/burnt lugs, replacement of deteriorated copper wiring, checking the power contactors, MCCBs for serviceability, rectifying of loose connections, removing contactors and cleaning the points, refixing it in its original position,removing the carbon deposit including servicing to ACBs/MCCBs in the panel and reconditioning of door lock complete for following capacity DG sets all as specified and as directed. Note: (i) MCCB etc required for replacement shall be measured and paid separately under relevant items |
| 83 | S&F (in repair) for self starter assembly 12 volts complete suitable for 25 KVA DG set including removal of extg unsv one complete all as specified and directed. |
| 84 | S&F (in repair) for self starter assembly 12 volts complete suitable for 40 KVA DG set including removal of extg unsv one complete all as specified and directed. |
| 85 | S&F (in repair) for servicing /cleaning of ball bearing of alternator by cleaning agent ,cleaning the slip rings,adjustment of carbon bushes, greasing the ball bearings , refittings and alignments of complete altornator with engine for smooth functioning all as specified and directed, |
| 86 | M & L for servicing of DG Set 200 dynamo 12 V assemblly including replacement of worn out armature ,union, carbon bush complete and refixing all the component in existing position with necessayy screw, nuts and bolts for smooth and efficient functioning all as specified and directed. |
| 87 | M & L for servicing of DG Set125 dynamo 12 V assemblly including replacement of worn out armature ,union, carbon bush complete and refixing all the component in existing position with necessayy screw, nuts and bolts for smooth and efficient functioning all as specified and directed. |
| 88 | M & L for servicing of DG Set 25/30 KVA dynamo 12 V assemblly including replacement of worn out armature ,union, carbon bush complete and refixing all the component in existing position with necessayy screw, nuts and bolts for smooth and efficient functioning all as specified and directed. |
| 89 | M & L for servicing of DG Set160 KVA dynamo 12 V assemblly including replacement of worn out armature ,union, carbon bush complete and refixing all the component in existing position with necessayy screw, nuts and bolts for smooth and efficient functioning all as specified and directed. |
| 90 | Decanning of diesel oil from diesel tank more then 500 ltrs capacity in empty barrel, dismantling of inlet & outlet fuel connection, removing all deposited material from bottom, cleaning the diesel tank with K'oil, scraping of old paint from outer side of tank and applying two coats of synthetic enameled paint on outer surfaces of tank, marking & painting of oil levels on tank, making inlet and outlet connection , re-filling of decanned diesel in the tank all as directed. |
| 91 | Decanning of diesel oil from diesel tank of 20 to 200 ltrs capacity in empty barrel, dismantling of inlet & outlet fuel connection, removing all deposited material from bottom, cleaning the diesel tank with K'oil, scraping of old paint from outer side of tank and applying two coats of synthetic enameled paint on outer surfaces of tank, marking & painting of oil levels on tank, making inlet and outlet connection , re-filling of decanned diesel in the tank all as directed. |
| 92 | Decanning of diesel oil from diesel tank of 200 to 500 ltrs capacity in empty barrel, dismantling of inlet & outlet fuel connection, removing all deposited material from bottom, cleaning the diesel tank with K'oil, scraping of old paint from outer side of tank and applying two coats of synthetic enameled paint on outer surfaces of tank, marking & painting of oil levels on tank, making inlet and outlet connection , re-filling of decanned diesel in the tank all as directed. |
| 93 | M & L for painting of complete DG Set of capacity 200 KVA by means of scraping old paints preparing the surface for painting with requisite tools then painting the DG Set with two coats ofsuper enemal paint as per existing colour once a coat of red oxide paint over spray gun or by brush as terible including rewriting of srl No. & MES No.in two inch block letter all as per specified and directed by Engr-in-Charge. |
| 94 | M & L for painting of complete DG Set of capacity 125 KVA by means of scraping old paints preparing the surface for painting with requisite tools then painting the DG Set with two coats ofsuper enemal paint as per existing colour once a coat of red oxide paint over spray gun or by brush as terible including rewriting of srl No. & MES No.in two inch block letter all as per specified and directed by Engr-in-Charge. |
| 95 | M & L for painting of complete DG Set of capacity 25/40 KVA by means of scraping old paints preparing the surface for painting with requisite tools then painting the DG Set with two coats ofsuper enemal paint as per existing colour once a coat of red oxide paint over spray gun or by brush as terible including rewriting of srl No. & MES No.in two inch block letter all as per specified and directed by Engr-in-Charge. |
| 96 | S&F (in repair) of Auto Voltage Regulator ( AVR) suitable for DG set of capacity 25 KVA DG set complete all as specified and directed. |
| 97 | S&F (in repair)of Auto Voltage Regulator ( AVR) suitable for DG set of capacity 125 KVA to 200 KVA complete all as specified and directed. |
| 98 | S&F (in repair) of solonoid switch suitable for existing DG set of capacity 125 KVA to 200 KVA complete all as specified and directed. |
| 99 | S&F (in repair)of solonoid switch suitable for existing DG set of capacity 40 KVA DG set complete all as specified and directed. |
| 100 | M&L for earthing complete with galvanised or steel earth plate electrode of size 60cm x60cmx6mm thick burried directly in ground vertically ( to a depth not less than 2.25mtr deep below normal ground level) with top edge of the plate not less than 1.5 mtr below normal ground level, connected to strip 32x 6 mm size with nuts, bolts , check nuts , washers, earth plate surrounded by packed layers of charcoal dust and common salt 15cm thick all around, top & bottom watering pipe 20mm bore of GI medium grade with funnel and wiremesh all as shown in electrical plate No. 5 of SSR -1991 Part I and connecting to arthing test point,main switch board and testing on completion including PCC chamber concrete 1:3:6 type C-2 and RCC cover 75mm thick with MS TMT bar 8mm dia @ 150mm c/c both ways in cement concrete(1:2:4) type B-1 all asshown in electrical plate in No 5 of SSR(Pt-I)1991 complete all as specified and dirfected by Engineer-in-charge. |
| 101 | S&F (in repair) of galvanized iron strip of size 32x6 mm as earth continuity conductor provided in between earth test point terminal and upto the equipment incl nuts, bolts and washers complete all as specified and directed. |
| 102 | S&F (in repair) indicating lamp assembly (LED) Red, green, yellow, blue and making necessary connection including taking down existing unserviceable indicating lamp assembly, complete all as directed. |
| 103 | Supply only the following items / material, complete all as directed |
| 104 | (a). Cotton waste white |
| 105 | (b) Caustic soda |
| 106 | (c) Distilled water (1 ltr bottle) |
| 107 | (d) Coolant |
| 108 | (e) Copper battery leads, 1.5 m long |
| 109 | (f) Copper battery terminals |
| 110 | (g) Copper battery leads, 0.80 m long |
| 111 | S&F (in repair) synthetic Rubber insulated mats 2 mm thick for voltage upto 3.3 kv for electrical purpose as per IS 15652-2006, (superseding IS 5424) suitable forelectrical shock safety of sizes 2m x 1m complete all as directed |
| 112 | S&f in repairs Battery, low maintainance type, 12V 150 Ah including testing complete all as directed by Engr-in- charge |
| 113 | S&f in repairs Battery, low maintainance type , 12V 100 Ah including testing complete all as directed by Engr-in- charge |
| 114 | S&F in repairs MCCB 4 pole 160 Amps with breaking capacity 25 KA 415 volt & elect connection etc completeall as specrfied and directed. |
| 115 | S&Fplates( plain or chequered) challels, square cut or notched( ordinary and counter sunk) for cable duct including 2 coats of synethic enamel paint over a coat of red oxide primer complete all as specified & directed |
| 116 | S&Fin repairs of TPN on load change over switch of capacity 200 Amp including dismantling of existing complete all as specified and directed by Engr-in-charge. |
| 117 | Excavation in trenches in any type of soil n.exc. 1.5 mtr wide and n.exc 1.5 mtr in depth for LT cables complete including bricks all as specified & directed. |
| 118 | Returning, filling in, any type of soil and spreading in layers n. exc 25cm thick each layer including watering & well ramming complete all as specified& directed. |
| 119 | Removal of surplus soil to a distance n.exc 50 mtr & depositing where directed at a level n. exc. 1.5mtr above the starting point complete all as specified & directed. |
| 120 | M & L for brick protection to cable using old size sub class 'B' bricks, laidflat, dry butt jointed, laid lengthwise perpendicular to the axis of cable all as specified & directed. |
| 121 | M&L for sand cushioning with layer of sand 8 cm thick before laying of cable and 15 cm after lying of calbe in trenches complete all as specified & directed. |
| 122 | Supply ,laying jointing and testing (in repair) of cable XLPE insulated, armoured heavy duty electric cable with stranded aluminium conductor, 1100 volts grade, laid in trenches or duct or passing through pipe or fixed to poles walls with suitable cable gland, lugs of cross sectional area 150 Sqmm 3.5 core complete all as specified and directed. |
| 123 | S & F (in repair) GI pipe light grade 100mm bore for cable protection, fixed to pole/ alongwall/ floor/ under road/ across the drain or nallaha etc complete all as specified & directed. |
| 124 | S&F (in repair) for canopy hinges for auqastic doors with suitable bolts and nuts of DG set including removal of extg unsv one compete all as specified. |
| 125 | S&F (in repair) for Anti vibration pads with suitable bolts and washers including removal of extg unsv one compete all as specified. |
| 126 | S&F (in repair) for Electronic Type Starting Switch for 40KVA DG set including removal of extg unsv one compete all as specified. |
| 127 | M&L for taking out all injector (by using right tools means torque wrench ) from DG set up to 58.5 KVA for servicing through authorised dealar and refixing its original position after repairing including replacement of plunger, washer, jets and any internal parts of injector, complete all as specified and as directed. |
| 128 | M&L for taking out all injector (by using right tools means torque wrench ) from DG set 125KVA to 200 KVA for servicing through authorised dealar and refixing its original position after repairing including replacement of plunger, washer, jets and any internal parts of injector, complete all as specified and as directed. |
| 129 | S & F electric shock treatment chart on flex/pvc reflecting sheet with of size 50x100 cm complete all as specified and directed |
| 130 | Disconnecting, removing and dismantling radiator assembly from the following capacity DG sets and descaling the radiator throughly with CTC solution/ any other chemical solvent agent as approved by the Engineer-in-charge, stopping of leakage at place to copper cores and tubes by brazing scrapping the existing oil paint, dusting and painting the radiator with enamelled paint etc., re-installing and commissioning complete all as specified and as directed . |
| 131 | (ii) 25 to 58.5 capacity genset |
| 132 | (iii) 125 to 200 KVA capacity genset |
| 133 | Maintenance and complete servicing of existing retrofit emission control device (RECD) up to 200KVA DG set capacity including repair of leakage, cracks or damage, check abnormal back pressure, ensure no unusual vibrations, verifying proper mounting and clamp tightning with cleaning of outer casing and exhaust lines and check insulation condition, sensor functioning and removal/cleaning of particulate filter (DPF) using compressed air and inspection and cleaning of carbon deposition, surface chocking, , internal honeycomb structure,calibration of sensor if required with repacement of gasket and seals, clamp & fastners, catalytic elemets including re - assembling the device of DG set after replacing the unserviceable parts and components etc. and making DG Set in perfect operational in manual and electrical mode, complete all as directed. Note:- (i) Spare parts will be measured and paid seperately under respective items of Sch 'A'. (ii) Make of parts shall be same as per existing make. |
| 134 | Exhaust Gaskets & Seals |
| 135 | Clamps & Fasteners |
| 136 | Thermal Insulation / Exhaust Lagging |
| 137 | DPF Cleaning / Partial Media Replacement |
| 138 | Electrical Consumables (Fuses, Wiring, Lamps) |
| 139 | Anti-Vibration Rubber Pads |
| 140 | Catalyst Cleaning Chemicals Please Enable Macros to View BoQ information |