Tender For Inclusion Of Existing Smart Meters In The Scheme & Replacement Of Existing Energy Meters With Smart Electric Meters At Mount Abu Mil Stn And Udaipur Mil Stn, Udaipur-Rajasthan
TDR : 55466929
Tender Notice
BOQ
27 Days Left
Udaipur
Rajasthan
Tender For Inclusion Of Existing Smart Meters In The Scheme & Replacement Of Existing Energy Meters With Smart Electric Meters At Mount Abu Mil Stn And Udaipur Mil Stn
Name of Work:- INCLUSION OF EXISTING SMART METERS IN THE SCHEME & REPLACEMENT OF EXISTING ENERGY METERS WITH SMART ELECTRIC METERS AT MOUNT ABU MIL STN AND UDAIPUR MIL STN
Sl. No.
Item Description
1
Taking down carefully old Unserviceable energy meters carefully by disconnecting and unscruing/removing from boards/ outlet boxes, of any size, rating, at any location, noting down the meter reading building wise including photographic record of the meter reading depositing to AGE E/M store duly marked house number and last meter reading with permanent marker as per building inventory, making good the disturbed surface as per existng specifications, complete all as specified and as directed. (102 number of meters in Mount Abu Mil Station and 667 number of meters in Udaipur Mil Station)
2
Survey, Design,Supply, installation , commissioning, integration and testing of the advanced metering infrastructure (AMI) including procurement of all necessary hardware,software,programming licenses for each station (One for Mount Abu and one for the Udaipur), comprising following :
3
To perform (carryout) site survey and decide the communication technology and design advanced metering infrastructure system to ensure seamless communication and operation of complete AMI, smart meter system and data availability to all cosumers. The communication technology selected and decided may be cellular(3G/4G/5G)/RF Mess network or combination(Hybrid) of cellular (3G/4G/5G) and RF mess or any other advanced technology as per CEA/TRAI guidelines. NOTE for 2.00 and 2.01 of BOQ item : Complete Survey report with proposed AMI technology to be provided , shall be submitted by the contractor to the engineer-in-charge and after getting it approved from GE, report shall be submitted to Nodal Officer(Rep of Accepting Officer) for approval in consultation with user. Irrespective of approval of Nodal Officer, Contractor shall be fully responsible for proper design,execution and smooth functioning of AMI infrastructure. Please Enable Macros to View BoQ information
4
To perform (carryout) site survey and decide the communication technology and design advanced metering infrastructure system to ensure seamless communication and operation of complete AMI, smart meter system and data availability to all cosumers. The communication technology selected and decided may be cellular(3G/4G/5G)/RF Mess network or combination(Hybrid) of cellular (3G/4G/5G) and RF mess or any other advanced technology as per CEA/TRAI guidelines. NOTE for 2.00 and 2.01 of BOQ item : Complete Survey report with proposed AMI technology to be provided , shall be submitted by the contractor to the engineer-in-charge and after getting it approved from GE, report shall be submitted to Nodal Officer(Rep of Accepting Officer) for approval in consultation with user. Irrespective of approval of Nodal Officer, Contractor shall be fully responsible for proper design,execution and smooth functioning of AMI infrastructure. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.