|
| 1 | Schedule 'A' Part-I (Building Work) Note : This schedule is not pre-priced by MES and the pre-priced rate indicated as \\"Rs 0.00\\" under Col. 5 siginifies this fact only. |
| 2 | Construction of 01 x Toilet complex consisting of 14XIWC.02XEWC,02 Urinal and 02x Wash hand basin with permanent specification, RCC framed construction, ATT, Mosquito proofing, Seismic measures etc, complete all as specified and as shown on drawings. |
| 3 | Schedule 'A' Part-II (Internal Electrification works) |
| 4 | Total amount of Sch 'A' Part-II (Internal Electrification works) brought forward from srl page No-23 |
| 5 | Schedule 'A' Part-III (Internal water supply Works) |
| 6 | Total amount of Sch 'A' Part-III (Internal water supply Works) brought forward from srl page No-25 |
| 7 | Schedule 'A'Part-IV (Road / Path / Hardstanding Works) |
| 8 | Total amount of Sch 'A' Part-IV (Road / Path / Hardstanding Works) brought forward from srl page No-27 |
| 9 | Schedule 'A'Part-V (Sewage Disposal Works) |
| 10 | Total amount of Sch 'A' Part-V (Sewage Disposal Works) brought forward from srl page No-29 |
| 11 | Schedule 'A'Part-VI (Area Drainage Works) |
| 12 | Total amount of Sch 'A' Part-VI (Area Drainage Works) brought forward from srl page No-30 |
| 13 | Schedule 'A'Part-VII (External Electrification Works) |
| 14 | Total amount of Sch 'A' Part-VII (External Electrification Works) brought forward from srl page No-33 |
| 15 | Schedule 'A'Part-VIII (External Water Supply Works) |
| 16 | Total amount of Sch 'A' Part-VIII (External Water Supply Works) brought forward from srl page No-34 |
| 17 | Schedule 'A'Part-IX (RETAINING WALL) |
| 18 | Total amount of Sch 'A' Part-IX (RETAINING WALL) brought forward from srl page No-36 |
| 19 | Schedule 'A'Part-X (Site Clearance Works) |
| 20 | Total amount of Sch 'A' Part-X (Site Clearance Works) brought forward from srl page No-37 |
| 21 | Schedule 'A'Part-XI (Misc Items of Works) Note : This schedule is not pre-priced by MES and the pre-priced rate indicated as \\"Rs 0.00\\" under Col. 5 siginifies this fact only. |
| 22 | Point wiring with two single core 1.5 Sqmm (nominal cross section area) FRLS PVC insulated unsheathed copper conductor cable and one single core 1.5 Sqmm (nominal cross section area) FRLS PVC insulated unsheathed copper conductor cable as earth continuity to common earth and connecting to earth dolly running in and including medium grade rigid nonmetallic PVC concealed conduit of 25mm dia in wall after cutting chases in wall including concealed modular sheet terminal box factory made of suitable size with modular cover plate with frame for mounting modular switches, sockets, fan regulators etc. and all requisite accessories such as PVC elbow, Tee, collars, bends etc. for mounting switches, sockets, fan regulators etc for one light / fan / exhaust fan point controlled by one way switch 6 Amp, complete all as specified. Note:-The colour coding of wiring to be followed as Red/Yellow/Blue for Phase/Neutral/Earth respectively. |
| 23 | Description all as per item No. 11.01 here-in-before but for 3 Pin socket outlet 15 Amps point on independent board controlled by other switches with 2.5sqmm copper conductor PVC insulated cable 1100 Volts grade with 2.5sqmm copper conductor as earthwire, complete all as specified and directed. |
| 24 | M&L for Decorative Tube light fitting LED 1X20W batten made out of fixture with extruded polycarbonate, environmental friendly, energy efficient ready to use pack surface and wall mounted LED batten complete with hosing with all accessories pre wired and making connection with three core copper flexible cable of size 23/0.0076 from ceiling rose to PVC connection to light fitting complete all as specified and directed. |
| 25 | M&L for pre polished coloured chequred cement concrete tiles of size 30cm x30cm x 25mm thick set, jointed in neat cement slurry in floor and pointed in white or coloured cement to match the shade of tiles laid over and including 15mm thick screed bed in cement mortar 1:4, complete all as specified and directed. |
| 26 | GI bracket pipe of size 40mm dia light grade of 1.2 mtr long bent to shape hot or cold suitable for street light fitting and making the one end of GI pipe bracket suitable for fixing of street light fittings of any type/ size and GI bracket pipe shall be fixed on wall/pole, steel/PCC surfaces by providing suitable MS iron 25x4 mm clamps 2 nos with necessary suitable nuts, bolts & washers and complete all as specified and as directed. |
| 27 | Supply and fixing FRP looping box of size 200x140x95 mm with connector and comprising of MCB SP 10 Amps, ISI marked, 240V complete with and including providing GI clamps, nuts, bolts etc suitable for fixing on PCC pole/wall/steel tubular pole etc and , complete all as specified and as directed. |
| 28 | Decorative Tube light fitting LED 20W tube Rod made out of basic all purpose surface and wall mounted LED batten with aluminum housing & integrated electronic driver. complete with hosing with all accessories pre wired and making connection with three core copper flexible cable of size 23/0.0076 from ceiling rose to PVC connection to light fitting complete all as specified and directed. |
| 29 | 100 users conventional type brick masonry Septic Tank designed to carry sewage and sullage water, excavation in hard/ dense soil, PCC 1:2:4 in foundation over hardcore, RCC M-25 Design Mix Baffle walls and Roof slab with vent shaft, manhole openings with cover connections etc. complete with effective depth 1.04 mtr complete all as per HQ CEUZ Drg no: CE/TD-1202/2003, Sheet 1/2 & 2/2. |
| 30 | Construction of soakage well exc in ordinary soil foundation in PCC 1:3:6, wells of honeycombed and solid in M-25 concrete including intercepting chamber screen chamber brick work in CM RCC cover slab in M-25 /RR masonry / filling with brick bats , complete of size 3.6 m dia X 4.5 m effective depth , complete all as specified and as directed by Engineer-in-Charge Please Enable Macros to View BoQ information |