| 1 | Clearing shrub jungles uprooting stumps and small bushes and trees below 1.00m. Girth on premeasurement with all lead , lifts, delifts including all cost of the direction of the Engineer-in-charge |
| 2 | Earth work in suitable type of soil in approved borrow area, loading into transport vehicle manually or mechanically and transportation of earth by mechanical means and unloading the same over the approved surface of the embankment in proper profiles with all leads of 1 km, lifts,delifts including rough dressing and breaking the clods in to 5 cm to 7 cm size including removal of all roots, bushes from transported earth with all cost, carriage, royality, labour welfare cess and laying in layers not exceeding 22.50cm in depth including watering and oridinary compaction by sheep foot roller with hire and running charges of all labour, T & P, cost of fuel, lubricant, cost of labour, carriage, royality EMF,DMF, Additional charge, cess, taxes, etc. all complete as per specification and direction of the Engineer-in-Charge. |
| 3 | Earth work in excavation of foundation in ordinary soil including rough dressing and levelling the bed and depositing the excavated materials with intial lead 50m and initial lift of 1.50m with cost of all labour, hire & running charges of all machinaries with all labour, T & P required for the work in all respects including labour cess etc. complete as per direction of the Engineer-in-charge |
| 4 | Filling foundation and plinth with sand of approved quality and from approved quarry with wel waterded and rammed etc. complete including cost coveyance, royality with all labours T & P Cess, EMF,DMF, Additional charge etc. complete as per directed of the Engineer-in-charge |
| 5 | Cement concrete (1:3:6) using 4cm size CB HG metal of approved quality and from approved quarry including all labours T & P and cost, conveyance of materials and HRC of concrete mixture and EMF,DMF, Additional charge etc. complete and as per the direction of engineer-in- charge. |
| 6 | Rigid smooth centering and shuttering including false work and dismentalling then after casting all complete as per direction of the Engineer-in-charge |
| 7 | Filling foundation and plinth with excavated earth including all cum etc. complete as per direction of the Engineer-in-charge |
| 8 | Providing weep holes in plane/ RCC Abutment, wing walland return with 100m dia AC Pipe extending through the full width of the structures with slope etc. complete as per direction of the Engineer-in-charge |
| 9 | Quarrying, collecting & supply good quality of moorum from approved quarry and stacking the same at work site or at approved stock yard for premeasurement I regular box heaps of 1.50 x 1.50 x 0.50m to be measured as one cum and conveying from premeasured stacks and admixture the moorum and sand in required propertion (70:30) and spreading the admixing over the prepared load surface to required thickness not including 100mm in layers including watering & consolidation with PRR including cost, conveyance, royality and all other taxes of all materials, labour T & P required for the work including hire and running charges of machineries and labour welfare cess with all leads, lifts, delifts EMF,DMF and additional charge etc. complete in all respect as per specification and direction of the Engineer-in-charge Please Enable Macros to View BoQ information |