|
| 1 | Clearing boundary line to a width of 1.5 m to facilitate Survey |
| 2 | Survey with prismatic compass |
| 3 | Providing & fixing 15 x 15 x 90 cm boundary stone of hard stone |
| 4 | Transportation of survey stone including loading and unloading from Chithara to Elavupalam 12 km |
| 5 | Heaping the debris after getting the extraction of Acacia poles |
| 6 | First year first weeding (Selective removal of Eupatorium, Thudali etc.)(May-June). |
| 7 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift ip to 1 m, disposed earth to be levelled and neatly dressed.(Rain Pits) All kinds of soil (50 rain pits)Say 60 cum @ Rs. 203.83/cum |
| 8 | For first time uprooting of existing invasive species like Acacia, Mangium seedlings etc. by manual means for the entire area of the plantations for asisting natural regeneration where ever necessary |
| 9 | First year second weeding (Selective removal of Eupatorium, Thudali etc.) (August-September). |
| 10 | For second time uprooting of existing invasive species like Acacia, Mangium seedlings etc. by manual means for the entire area of the plantations for asisting natural regeneration where ever necessary |
| 11 | Girdling Acacia and Manjium saplings (if its needed) |
| 12 | First year third weeding (Selective removal of Eupatorium, Thudali etc.) (December -January). |
| 13 | For third time uprooting of existing invasive species like Acacia, Mangium seedlings etc. by manual means for the entire area of the plantations for asisting natural regeneration where ever necessary |
| 14 | Provision for sign board 6\\" x 4\\" and plantation boards including cost of materials and erecting charges etc. complete |
| 15 | Clearing boundary line to a width of 5.2 m to prevent the fire (Fire Break) |
| 16 | Cost of preparation of SSP including photocopy, Sketches & photos |
| 17 | Contractor Profit |
| 18 | Contingencies including cost of pesticides, fungicides, Kerosene etc. |
| 19 | VDA Please Enable Macros to View BoQ information |