| 1 | Clearing boundary line to a width of 1.5 m to facilitate Survey |
| 2 | Survey with prismatic compass |
| 3 | Providing & fixing 15 x 15 x 90 cm boundary stone of hard stone |
| 4 | Slash felling where ever necessary in entire area |
| 5 | Heaping the debris after getting the extraction of Acacia Poles |
| 6 | Collection of 60 Cm Bamboos, reed or Wooden stacks for stacking |
| 7 | Transport of stacks |
| 8 | Digging pits of size 45 x 45x 45 cm in ordinary soil after rain |
| 9 | Transporting charges of Basket cover seedlings from on site Nursery to planting site including loading and unloading charges |
| 10 | Head load Transport of big Basket seedlings to planting sites & distribution up to a lead of 50 Metres (including for casualty replacement 10 %) ie 3025+302 |
| 11 | Covering pits, digging planting holes and planting seedlings |
| 12 | First year First weeding (for planted area) (August) |
| 13 | Making Platform of size 100 cm x 100 cm with 30/2 Cm depth inward slopes |
| 14 | Replacing Casualties using Big Basket seedlings (for planted area) |
| 15 | For First time, Uprooting of existing invasive species like Acacia, Mangium Seedlings etc by manual means for the entire area of the plantations for assisting natural regeneration where ever necessary |
| 16 | First year Second Weeding(for planted area) (October) |
| 17 | For Second time, Uprooting of existing invasive species like Acacia, Mangium Seedlings etc by manual means for the entire area of the plantations for assisting natural regeneration where ever necessary |
| 18 | First year third Weeding(for planted area) (December) |
| 19 | For Third time, Uprooting of existing invasive species like Acacia, Mangium Seedlings etc by manual means for the entire area of the plantations for assisting natural regeneration where ever necessary |
| 20 | Providing for sign board 6\\" x 4\\" and plantation boards including cost of materials and erecting charges etc, complete |
| 21 | Construction of temporary Shed |
| 22 | Clearing fire break to a width of 5.2 metre to prevent the fire |
| 23 | Contractor Profit |
| 24 | Contingencies including cost of pesticides, fungicides, Kerosene etc. |
| 25 | VDA Please Enable Macros to View BoQ information |