| 1 | SCHEDULE 1 Single Stream Metering Regulating Station MRS with Metal cabinet or enclosure of flow capacity of 250 SCMH Inlet 4 to 6 Bar g Outlet 1 4 Bar g | SCHEDULE 1 Single Stream Metering Regulating Station MRS with Metal cabinet or enclosure of flow capacity of 250 SCMH Inlet 4 to 6 Bar g Outlet 1 4 Bar g as per tender document |
| 2 | SCHEDULE 1 Dual stream Metering Regulating Station MRS with Metal cabinet or enclosure of flow capacity of 500 SCMH Inlet 4 to 6 Bar g Outlet 1 to 4 Bar g | SCHEDULE 1 Dual stream Metering Regulating Station MRS with Metal cabinet or enclosure of flow capacity of 500 SCMH Inlet 4 to 6 Bar g Outlet 1 to 4 Bar g as per tender document |
| 3 | SCHEDULE 1 Dual stream Metering Regulating Station MRS with Metal cabinet or enclosure of flow capacity of 650 SCMH Inlet 4 to 6 Bar g Outlet 1 to 4 Bar g | SCHEDULE 1 Dual stream Metering Regulating Station MRS with Metal cabinet or enclosure of flow capacity of 650 SCMH Inlet 4 to 6 Bar g Outlet 1 to 4 Bar g as per tender document |
| 4 | SCHEDULE 1 Supervision of Installation Testing Commissioning of Metering Regulating Station MRS consisting of Filtration Pressure reduction and Metering with Transition fittings at respective site | SCHEDULE 1 Supervision of Installation Testing Commissioning of Metering Regulating Station MRS consisting of Filtration Pressure reduction and Metering with Transition fittings at respective site as per tender document |
| 5 | SCHEDULE 2 Single Stream Metering Regulating Station MRS with Metal cabinet or enclosure of flow capacity of 100 SCMH Inlet 4 to 6 Bar g Outlet 1 to 4 Bar g | SCHEDULE 2 Single Stream Metering Regulating Station MRS with Metal cabinet or enclosure of flow capacity of 100 SCMH Inlet 4 to 6 Bar g Outlet 1 to 4 Bar g as per tender document |
| 6 | SCHEDULE 2 Single stream Metering Regulating Station MRS with Metal cabinet or enclosure of flow capacity of 150 SCMH Inlet 4 to 6 Bar g Outlet 1 to 4 Bar g | SCHEDULE 2 Single stream Metering Regulating Station MRS with Metal cabinet or enclosure of flow capacity of 150 SCMH Inlet 4 to 6 Bar g Outlet 1 to 4 Bar g as per tender document |
| 7 | SCHEDULE 2 Supervision of Installation Testing Commissioning of Metering Regulating Station MRS consisting of Filtration Pressure reduction and Metering with Transition fittings at respective site | SCHEDULE 2 Supervision of Installation Testing Commissioning of Metering Regulating Station MRS consisting of Filtration Pressure reduction and Metering with Transition fittings at respective site as per tender document |
| 8 | SCHEDULE 3 Single Stream Metering Regulating Station MRS with Metal cabinet enclosure of flow capacity of 250 SCMH Inlet 16 to 49 Bar g Outlet 1 to 4 Bar g | SCHEDULE 3 Single Stream Metering Regulating Station MRS with Metal cabinet enclosure of flow capacity of 250 SCMH Inlet 16 to 49 Bar g Outlet 1 to 4 Bar g as per tender document |
| 9 | SCHEDULE 3 Dual stream Metering Regulating Station MRS with Metal cabinet or enclosure of flow capacity of 500 SCMH Inlet 16 to 49 Bar g Outlet 1 to 4 Bar g | SCHEDULE 3 Dual stream Metering Regulating Station MRS with Metal cabinet or enclosure of flow capacity of 500 SCMH Inlet 16 to 49 Bar g Outlet 1 to 4 Bar g as per tender document |
| 10 | SCHEDULE 3 Dual stream Metering Regulating Station MRS with Metal cabinet or enclosure of flow capacity of 650 SCMH Inlet 16 to 49 Bar g Outlet 1 to 4 Bar g | SCHEDULE 3 Dual stream Metering Regulating Station MRS with Metal cabinet or enclosure of flow capacity of 650 SCMH Inlet 16 to 49 Bar g Outlet 1 to 4 Bar g as per tender document |
| 11 | SCHEDULE 3 Supervision of Installation Testing Commissioning of Metering Regulating Station MRS consisting of Filtration Pressure reduction and Metering with Transition fittings at respective site | SCHEDULE 3 Supervision of Installation Testing Commissioning of Metering Regulating Station MRS consisting of Filtration Pressure reduction and Metering with Transition fittings at respective site as per tender document |
| 12 | SCHEDULE 4 Dual stream Metering Regulating Station MRS with Metal cabinet enclosure of flow capacity of 1000 SCMH Inlet 16 to 49 Bar g Outlet 1 4 Bar g | SCHEDULE 4 Dual stream Metering Regulating Station MRS with Metal cabinet enclosure of flow capacity of 1000 SCMH Inlet 16 to 49 Bar g Outlet 1 4 Bar g as per tender document |
| 13 | SCHEDULE 4 Dual stream Metering Regulating Station MRS with Metal cabinet enclosure of flow capacity of 2000 SCMH Inlet 16 to 49 Bar g Outlet 1 4 Bar g | SCHEDULE 4 Dual stream Metering Regulating Station MRS with Metal cabinet enclosure of flow capacity of 2000 SCMH Inlet 16 to 49 Bar g Outlet 1 4 Bar g as per tender document |
| 14 | SCHEDULE 4 Supervision of Installation Testing Commissioning of Metering Regulating Station MRS consisting of Filtration Pressure reduction and Metering with Transition fittings at respective site | SCHEDULE 4 Supervision of Installation Testing Commissioning of Metering Regulating Station MRS consisting of Filtration Pressure reduction and Metering with Transition fittings at respective site as per tender document |