| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared |
| 2 | Dismantling old protection work including cutting of crates and stacking of stones. |
| 3 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil |
| 4 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil |
| 5 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil (rolling and watering not included) |
| 6 | Supply of labour for all sorts of works as per requirements for the item work not in the purview of SSR of 2022 |
| 7 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 8 | Tipping of stone filled crates wired in position including equipment charges |
| 9 | Extra for every additional lift of 1.5 m or part there of beyond 1.5 m height for hand-packing of stones in wire-crates |
| 10 | Dry stone pitching (any thickness) excluding cost of stones ( hortizontal) |
| 11 | Dry stone pitching (any thickness) excluding cost of stones ( on slope) |
| 12 | Supply of stones from source to site of work |
| 13 | Supply and fixing of Iron sign board inculding painting writing on it (4'x2'.6'') fet with angle iron legs and frame of 40x40x6 mtr complete job lumpsum |
| 14 | Re-lettering with Black Japan paint of approved bran and manufacture. |
| 15 | Painting with synthetic enamel paint of approved bran and manufacture of required colour to give an even shade on old work (one or more coats) |
| 16 | Hydraulic Excavator JCB/Tata/L&T and equivalent in th category of Back Hoe |
| 17 | providing and laying in position cement concrete of specified gradew including curing but excluding the cost of centring and shuttering. All work upt linth level with 1:3:6 (1 cement 3 course sand 6 graded stone aggrigate 20 mm nominal size) |
| 18 | providing and laying in position cement concrete of specified gradew including curing but excluding the cost of centring and shuttering. All work upt linth level with 1:2:4 (1 cement 2 course sand 4 graded stone aggrigate 20 mm nominal size) |
| 19 | Carriage of stones avg 50 Km by MT from source to able of work including loading & unloading of material as per site |
| 20 | Carriage of stones avg 40 Km by MT from source to able of work including loading & unloading of material as per site |
| 21 | Carriage of stones avg 30 Km by MT from source to able of work including loading & unloading of material as per site |
| 22 | Carriage of stones avg distance 100m by H/L |
| 23 | Carriage of stones avg distance 150m by H/L |
| 24 | Carriage of stones avg distance 200m by H/L |
| 25 | Carriage of Earth avg distance 5KM by MT |
| 26 | Carriage of sand avg distance of 5 km MT including Loading and Unloading of material |
| 27 | Carriage of Aggrigate on any distance of 15 Km by MT including Loading and unloading of Material |
| 28 | Filling available excauated earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20 cm in depth, lead upto 50 m and lift upto 1.5 m |
| 29 | Supply of empty cement bags |
| 30 | Filling of empty cement bags with sand/earth including cost of sewing and strings excluding cost of bags and earth/sand |
| 31 | Loading/ unloading of sand/earth filled bags in lorries lead upto 50 m |
| 32 | Placing of bags filled with earth/sand in dry |
| 33 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. |
| 34 | Supply of B.A. wire 4mm dia Knitted crate boxes size 6.0mx1.50mx1.50m with lids (15cm x 15cm Mesh) |
| 35 | Supply of B.A. wire 4mm dia Knitted crate boxes size 6.0mx1.20mx1.20m with lids (15cm x 15cm Mesh) |
| 36 | Supply of B.A. Wire Please Enable Macros to View BoQ information |