| 1 | Earth work in excavation of foundation in all kinds of soil with all leads and lifts including shoring, shuttering, proping bullahs, piling dewatering from foundation trenches supplying and working pumps and shifting the materials away from the working area with coffer dam if required including basic cost, conveyance of all labour, T&P, hire and running charges of all machineries including removing bushes and any other foreign materials from the foundation etc. including labour cess but excluding GST complete including provision of key trenches as directed by the Engineer-in-charge |
| 2 | Filling foundation & plinth with excavated earth including watering, ramming with ordinary compaction by PRR including hire and running charges of P.R.R. with basic cost of all labour, T&P required for the work etc. including labour cess but excluding GST complete as per direction of the Engineer-in-charge |
| 3 | Supplying and filling foundation and plinth with sand well watered and rammed with basic cost, conveyance, royalities of all materials including labour cess but excluding GST complete |
| 4 | Cement concrete (1:3:6) in foundation and floor i;e below the base course of terrazo flooring using 4cm (1½”) size black crusher hard broken granite aggregates / chips / metal of approved quality and from approved quarry, including lowering, laying concrete, watering curing etc. complete to required level laid in layers not exceeding 1'-6\\" thick including basic cost, conveyance, royalities of all materials and cost of all labour, T&P. required for the work etc. including labour cess but excluding GST complete as per direction of the Engineer-in-charge |
| 5 | RCC M20 having compressive strength of 20mpa, target mean strength of 30mpa, for150mm cubes at 28 days curing as per IS-456-2000 & I.R.C-212000 test conducted in accordance with I.S. 516 using 20mm & down graded size crusher broken hard granite coarse aggregate of approved quality and from approved quarry & other materials as per section 302 of I.R.C.21-2000 & IS-456-2000 of approved quality including centering, shuttering & form works for providing smooth & water tight surface, hoisting, lowering & laying concrete in layers not exceeding 30 cm. compacted thickness, compacting with mechanical vibrators true to lines, grades as per drawing & technical specifications, watering & curing for 28 days including basic cost, conveyance, royalties of all materials with all leads & lift, cost of all labour T&P, including labour cess but excluding GST & equipment required for mixing, transporting & placing in position vibrating, compacting, finishing & curing including all incidental expenses complete in all respect as per direction of the E.I.C. but excluding the cost of M.S. rods or Tor steel and binding wire & labour charges for bending binding & tying the grills Base Slab |
| 6 | Wall (Both side) |
| 7 | Precast Cover slab |
| 8 | Footing |
| 9 | Supplying, cutting, straightening the bent up M.S. Rods or Tor steel, using SAIL / TATA / RINL / JINDAL STEEL / SHYAM STEEL (grade Fe 5OOD} etc. including bending, binding, welding jointing if necessary and tying the grills and placing in position as required for R.C.C. works and for providing required no of fan hooks hoisting, lowering, laying including basic cost, conveyance of all M.S. Tor steel and binding wires of 18· to 20 gauge as required for the work bending, binding and tying the grills in all floors (Payment will be made on weight of M.S. Tor steel only and no separate payment will be made towards the weight of binding wires) etc. including labour cess but excluding GST complete as per specification & direction of Engineer-in-Charge |
| 10 | 6mm thick cement plaster (1:4) over R.C.C. surface finished smooth with proper slope after chipping, chiselling and cleaning the roof including hoisting, watering, curing, basic cost, conveyance, royalities of all materials and cost of all labour, T&P. required for the work etc. including labour cess but excluding GST complete |
| 11 | Providing and erection of over head signage as per clause 802-7 and 802-3 over adesign support system of M.S squre pipe. Etc complete as per specification & direction of Engineer-in-Charge |
| 12 | Providing, fitting & fixing of 3mm thick corrosion resistant A.C.P with high intensity retro-reflective sheeting over head signage body including basic cost of all materials, labour, T&P. & etc. including labour cess but excluding GST complete as per the direction of Engineer-in-charge. |
| 13 | Providing m fitting and fixing of HIP reto reflective signage over ACP as per approved design including cost of all materials and labour etc complete as per the direction of Engineer-in-charge. |
| 14 | Painting two coats with enamel paints of approved shade in all floors to wood and iron works including sand papering, polishing the surface, basic cost, conveyance, of all materials, all labour and T&P. required for the work including labour cess but excluding GST including the cost of paint and primer as per the direction of the Engineer-in-charge |
| 15 | Providing and fixing of prismatic reflective sign board with 18 gauge thick Gl sheet of 100x100mm size and fixing to the road side trees with nail facing towards the traffic of reflection at night including cost of all materials, labour and T&P eta all complete as per the direction of Engineer In ChargeSpeed Limit (600mm circular) |
| 16 | Juncttion T sign boars (80x60 cm Rectangular) |
| 17 | Righ Chevron Sign Board (60x50cm Equilateral Triangle) |
| 18 | Left Chevron Sign Board (60x50 cm Equilateral Triangle) |
| 19 | Information Sign Board (80x60 cm Rectangular) |
| 20 | School Area Sign Board (90cm Octagon) |
| 21 | Hazard Sign Board |
| 22 | Provding and laying of hot applied thermoplastic compound for marking of central lines and other lines of Road by hot thermoplastic road marking materials 2.5mm thick incluidng reflectorising glass beads @250gm/sqm area as per clause No.803.6.4 of MoRTH, the finished surface being uniform level and free from streaks & holes etc. including the basic cost of all materials, labour, T&P. heating, marking & traffic control measures etc. including labour cess but excluding GST complete as per the direction of the Engineer-in-charge. N.B: Warranty period minimum 2 years |
| 23 | Providing and fixing of bi-directional retro reflective raised pavement markers of approved colour, quality & make conforming to ASTM D-4280 made from injection moulded high impact polymer including cleaning, preparation of surface and fixing at position with approved quality adhesives including cost of all materials, labour, transportation, taxes, duties, sundries, T&P etc. complete. |
| 24 | Supplying, fitting, fixing of RCC pre-cast K.M. stone of prop. M-15 for O.D.R. road as per IRC specification and design including basic cost of all materials, labour, royalty, transportation charges of KM stone, T&P and reinforcement required for the work including cutting the earth and filling 150mm thick sand and making the pedestal of C.C. (1:3:6) of size 900mmx900mm bottom and 750mmx750mm top including providing C.C. (1:2:4) to a thickness of 75mm top over the pedestal including plastering the surfaces with 12mm thick (1:4) etc. including labour cess but excluding GST complete as per direction of the Engineer-in-charge.110 cm long ordinary K.M stone |
| 25 | 95 cm long ordinary K.M stone - hectometer Please Enable Macros to View BoQ information |