|
| 1 | Construction of Open Gym |
| 2 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil |
| 3 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 4 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 5 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 6 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 7 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 8 | OD243459/2025-2026:Walker Single- Providing and fixing Walker single- FNF 004 using, Minimum 100 NB GI Cclass Pipe- for Main Frame, minimum 32 NB GI B-CLASS Pipe- for Leg Frame, Minimum 25 NB GI B-Class Pipe for Handle Frame, Nylon 66 Injection Moulded casing clamps, LLDP Root molded seat with inbuilt bolts 3/8" X 1.5" foot rest, Nylon 66 injection Molded bearing cap & PIPE CAP, fully Done by first coat of Primer ? jotun Brand 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80micron thickness Powder coat |
| 9 | OD243460/2025-2026:SKI Trainer- Providing and fixing Ski trainer - FNF 014 using, Minimum 100 NB G.I. C class pipes for Main Frame, Minimum 40 NB G.I. pipe for Foot Rest Pipe, Minimum 40NB & 25 NB G.I. pipe for Handle, Minimum 25 NB & 40 NB GI B-Class Pipe for Connecting Pipe, LLDP Roto moulded seat with inbuilt bolts 3/8" X 1.5" for Foot rest, Nylon 66 injection moulded Bearing Cap & Pipe cap, fully Done by first coat of Primer – jotun Brand 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80micron thickness Powder Coat |
| 10 | OD243461/2025-2026:Chest Press Cum Shoulder Press- Providing and fixing Chest press cum shoulder press - FNF016 using, Minimum 100 NB GI C- lass Pipe for Center frame, Minimum 40 NB & 32 NB GI B-Class Pipe for Main Frame, Minimum 32 NB & 25 NB GI B-CLASS Pipe for Handle frame, Minimum 32 NB & 25 NB & 40 NB GI B-Class Pipe for Connection pipe, LLDP Roto moulded seat with inbuilt bolts 3/8\\" X 1.5\\" for Seat & Back Rest, Nylon 66 injection Molded Bearing Cap & Pipe Cap, fully Done by first coat of Primer ? jotun Brand 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80micron thickness and Top Coat of pure polyester powder with 70- 80micron thickness Powder coat |
| 11 | OD243462/2025-2026:ABB Trainer- Providing and fixing ABB Trainer - FPSPCL187 using, Minimum 80 NB GI Bclass Pipe for Main Frame, Minimum 32 NB GI B-class Pipe for Side Frame, Minimum 25 NB G.I. Pipe for Intermediate Pipe, Nylon 66 injection moulded Bearing cap & Pipe Cap, fully Done by first coat of Primer – jotun Brand 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness Powder Coat |
| 12 | OD243463/2025-2026:CYCLE- Providing and fixing Cycle - FPSPCL208 using, 25 NB & 40 NB GI B-class Pipe for Main frame, 32 NB GI B-Class Pipe for Seat Frame, 25 NB GI B-Class Pipe for Handle frame, Nylon 66 injection moulded Bearing Cap & Pipe Cap, fully Done by first coat of Primer – jotun Brand 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80 micron thickness Powder coat complete as per the instruction of Engineer in-charge |
| 13 | OD243464/2025-2026:One Seating cum 2 Standing Twister-Providing and fixing One Seating cum 2 Standing Twister- FPSPCL215 using, Minimum 100 NB GI C- class Pipe for Main frame, Minimum 25 NB GI B- Class Pipe for Handle pipe, LLDP Rotomoulded seat with inbuilt bolts 3/8" X 1.5" for Twister Disc, Minimum 25 NB & 20 NB GI B-class Pipe for Seating Frame, Minimum 80 NB GI B-class Pipe for Seating Frame Stand, Minimum 80 NB GI B-Class Pipe for Twister Stand, Minimum 25 NB GI B-Class Pipe for Twister Handle Frame, LLDP Plastic- Twister Disc, Nylon 66 injection moulded Bearing Cap & Pipe Cap, fully Done by first coat of Primer – jotun Brand 40-50 Micron thickness and Top Coat of pure polyester powder with 70- 80micron thickness Powder Coat complete as per the instruction of Engineer in-charge |
| 14 | 8.2.2.2:Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.Area of slab over 0.50 sqm Please Enable Macros to View BoQ information |