| 1 | Excavation in foundation in ordinary soil(Loam,Clay or Sand) upto 30m and including lifts upto 1.50 M and lead upto 30 m and including filling, watering, ramming of excavated earth into trench or into the spaces betweeen the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Enginer-in-charge upto a distance of 30 m from the foundation trenches as per SI no 251(a)Including all type of taxes, octroi, toll taxes,labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST. |
| 2 | Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work,in foundation and floors.Including all type of taxes,octroi,toll taxes,labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST. (PWD SI NO.281) |
| 3 | Class M-150 brick work in 1:4 cement coarse sand (of 2.25 fineness modulus) mortar in Foundation & Plinth including supply of all materials, labour, tools and plants etc. required for proper completion of the work.Including all type of taxes,octroi,toll taxes,labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST (PWD SI NO.305 a) |
| 4 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under,including cutting the patch in proper shape, raking out joints & preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.With cement mortar 1:4 (1 cement : 4 Coarse sand)including supply of all materials, labour, T&P etc. required for proper completion of the work. Including Supply of all materials, Labour ,T&P etc & Also Including All taxes,labour cess, Royalty Etc But Excluding GST |
| 5 | Cement Concrete with 2 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. SI NO 279(a) But excluding GST. |
| 6 | White Washing two Coats including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. SI NO 672 But excluding GST. |
| 7 | Repainting letters upto 2.5cm size including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. But size above 2.5cm upto 8.0 Cm.SI NO 821 But excluding GST. Please Enable Macros to View BoQ information |