| 1 | Earth work in making Road Diversion for V.R.B. Construction including all lead , lift ,proper disposal and labour and T&P etc.complete work as directed by Engineer-in-Charge |
| 2 | Dismentaling Brick work or stone work and cement concrete in lime or cement mortar and including stacking of material with in a distance of 60M as directed by Engineer-in-Charge |
| 3 | Dismentaling Reinforcement cement concrete including stacking of dismantled material with in 60M distance. as directed by Engineer-in-Charge |
| 4 | Earth work in excavation for foundation including back filling with all lead & lift labour and T&P etc for completion of work as direction of Engineer-in-Charge. |
| 5 | Centering and shuttering for C.C. work including cost of all materials, labour and T&P etc for proper completion of work as directed by Engineer-in-Charge |
| 6 | Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc for proper completion of work as directed by Engineer-in-Charge |
| 7 | Plain cement concrete in 1:3:6 in foundation with Coarse Sand having F.M. Not less than 2, crushed Stone aggregate of nominal size of 20 mm to 40 mm, mechanicaly mixed, placed in foundation and properly compacted including cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-Charge |
| 8 | Providing & Laying C.C. (1 : 2 : 4) with coarse sand and crushed aggregate including all cost of material, labour and T&P etc.with all leads and lift for proper completion of work as directed by Engineer-in-Charge |
| 9 | Providing & laying First Class Brick Work 1:4 CM and coarse sand including with cost of material, T&P etc. as directed by Engineer-in-Charge |
| 10 | Struck Deep Cement Pointing 1:2 C.M. with coarse sand including with all cost of material, labour & T&P etc. as directed by Engineer-in-Charge |
| 11 | Providing & Laying C.C. (1 : 1.5 : 3) with coarse sand and crushed aggregate with all cost of material, labour & T&P etc. as directed by Engineer-in-Charge |
| 12 | Reinforced cement concrete in (1:1.5:3) in all R.C.C. work with Coarse sand having F.M. Not less than 2, Crushed Stone Aggregate of nominal size 12.5 mm to 20 mm, Mechanically mixed and properly compacted by Vibrator including cost of all materials but excluding cost of steel, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge |
| 13 | Providing and laying TMT Reinforcement Steel bar of grade Fe 500 including cost of steel shaping, cutting, bending, placing in position and binding with steel binding wire etc. with cost of all materials, labour and T&P with all leads and lift for proper completion of work as directed by Engineer-in-Charge as per drawing |
| 14 | Painting of wall with two coat water proofing cement paint of approved quality including preparation of surface on Structure including with all materials,labour and T&P etc. as directed by Engineer-in-Charge as per I.D. specification. |
| 15 | Supply & Fixing of stone Wheel Guard of size (0.200 x 0.200 x 0.750 m ) with earth cutting & filling with PCC 1:1.5:3 including with all materials,labour and T&P etc. complete as directed by Engineer-in-Charge Please Enable Macros to View BoQ information |