| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mmPg.-1/It.-2.a |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)(a) With earth obtained from excavation of foundation.Pg.-1/It.-3.a |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.Pg.-14/It.-1(Corri.P-1, Dt.-04.06.2018) |
| 4 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation.(a) 1:3:6 proportionPg.-23/It.-1.a (Attached Rate Analysis) |
| 5 | Brick work with 1st class bricks in cement mortar (1:6)(a) In foundation and plinthPg.-15/It.-8.A(Attached Rate Analysis) |
| 6 | 25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer basedpaint to be paid separately).( Chequering not required over concrete or painted surface).Pg.-47/It.-1(Attached Rate Analysis) |
| 7 | Brick work with 1st class bricks in cement mortar (1:6)(b) In superstructure, ground floorPg.-15/It.-8.b(Attached Rate Analysis) |
| 8 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floorPg.-16/It.-16 (Attached Rate Analysis) |
| 9 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)Pg.-42/It.-36.a (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. |
| 10 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Variety Pg.-26/It.-10.a (Attached Rate Analysis) |
| 11 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation, basement and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.II. Other than SAIL/TATA/RINLPg.-43/It.-40.a.i.II (Attached Rate Analysis) |
| 12 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar(b) 20 mm thick plasterPg.-189/It.-1.i.b (Attached Rate Analysis) |
| 13 | (a) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.Pg.-200/It.-1.b |
| 14 | (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :(iv) Two coats (with any shade except white)Pg.-200/It.-2.a.iv |
| 15 | GST @ 18% |
| 16 | Labour Welfare Cess @ 1% Please Enable Macros to View BoQ information |