| 1 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.a) In ground floor including roof.Pg.-10/It.-1.a |
| 2 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.b) Extra rate for each addl. Floor over the rate ofground floorPg.-10/It.-1.b |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mmPg.-1/It.-2.a |
| 4 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) Page- 2, Item- 4.A |
| 5 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)(a) With earth obtained from excavation of foundation.Pg.-1/It.-3.a |
| 6 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.Pg.-14/It.-1(Corri.P-1, Dt.-04.06.2018) |
| 7 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation.(a) 1:3:6 proportionPg.-23/It.-1.a (Attached Rate Analysis) |
| 8 | Supplying and laying Polythene Sheet (150gm / sq.m.) overdamp proof course or below flooring or roof terracing or infoundation or in foundation trenches. Page- 47, Item- 3 |
| 9 | Brick work with 1st class bricks in cement mortar (1:6)(a) In foundation and plinth It-8.a /Pg-15 (attached rate analysis) |
| 10 | Brick work with 1st class bricks in cement mortar (1:6)(b) In superstructure, ground floorPg.-15/It.-8.b(Attached Rate Analysis) |
| 11 | 125 mm. thick brick work with 1st class bricks in cementmortar (1:4) in ground floor. Page- 16, Item- 16 (Corri. Pg.- 03, Dt. - 04.06.18) |
| 12 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (b) 20 mm thick plasterPg.-189/It.-1.i.b (Attached Rate Analysis) |
| 13 | Neat cement punning about 1.5mm thick in wall, dado,windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. It-15/Pg-192 (attached rate analysis) |
| 14 | (a) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.Pg.-200/It.-1.b |
| 15 | (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :(iv) Two coats (with any shade except white)Pg.-200/It.-2.a.iv |
| 16 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erectionall complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increasedallow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof.I) For structural members of specified sections weighing less than 22.5 Kg./mIt.-1, Pg-99 |
| 17 | (b) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.Pg.-200/It.-1.a |
| 18 | (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc.including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :(iv) Two coats (with any shade except white)Pg.-200/It.-2.b.iv |
| 19 | M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete.The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete. Payment to be made on the basis of calculated weight of structural memebrs of MS Holow Section as specified in relevent IS code infinished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a hight of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof.i) For roof truss worksa) Span up to 12 MtrPg.-101/It.-2A.i.a (3rd Corri. Pg.-85) |
| 20 | Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work).i) In Roofa) With 0.5 mm thick sheetIt.-14, Pg.-82 |
| 21 | Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. |
| 22 | Labour for fitting and fixing 10 cm. to 13 cm. diameter Sal-bullah/Eucalyptus-bullah as ties and runners including necessary nails, bolts and nuts.(1.5+0.15+0.1+0.3+0.05+0.1+0.9+0.1+0.1)X{(20.00/2.5)+1} +(20.00X4)=109.70MPage- 328, Item- 18.41 |
| 23 | Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. (i) 100mm diameter |
| 24 | Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. (iii) 150mm diameter |
| 25 | Coal tarring on wooden surfaces including cost of materials supplying empty Cement bags in good condition. |
| 26 | Supplying empty Cement bags in good condition. |
| 27 | Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags.Page-336, It.-18.29 |
| 28 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) |
| 29 | GST @ 18% |
| 30 | Labour Welfare Cess @ 1% Please Enable Macros to View BoQ information |