| 1 | BOQ FOR TEMPORARY WORK OF ERECTION AND DISMANTLING 11 KV, LT LINE, STREET LIGHT CONNECTION, INSTALLATION OF TRANSFORMER AND OTHER WORK IN KUMBH MELA-2027 IN MAIN KUMBH SECTORS- GAURISHANKAR, BAIRAGI CAMP, NEELDHARA, SATIDEEP, DAKSHDEEP ETC. UNDER EDC, UPCL, HARIDWARAGAINST E-TENDER NO- 16/SE/EDC/HDR/KM-2027/2026-27 Bidder's Name & Address S.N. Work Unit Qty. Rate Amount (In Rs.) A Decentrlized Material |
| 2 | 11 KV ACS AL-59,78 SQ MM Covered Conductor |
| 3 | 11 KV Mid span Jointing Kit |
| 4 | IPC With AL. BAIL for Earthing 11kv |
| 5 | 11 KV Sub. Ties/Cable Ties on pin Insulator |
| 6 | Disc fitting (B&S) type 70 KN for ACS |
| 7 | 11 KV tension clamp with bail &IPC |
| 8 | 11 KV IPC for Covered To Covered Connector |
| 9 | 11 KV IPC for Covered To Bare Connector |
| 10 | Stay Clamp for Sp-23 with Nut & bolt (size of flat = 50mm x 6mm & size of Nut & bolt = 16mm x 65mm) |
| 11 | Dead End Clamp with J hook |
| 12 | Suspension clamp with J hook |
| 13 | P.P with Holding clamp with Nut & Bolt (size of flat = 50mm x 6mm & size of Nut & bolt = 16mm x 100mm) |
| 14 | Bottom-Bracing clamp SP-55 with Nut & Bolt (Flat size 50mm x 6mm) |
| 15 | MCCB FOR 63 KVA T/F WITH EARTH RELAY |
| 16 | MCCB FOR 100 KVA T/F WITH EARTH RELAY |
| 17 | MS CLAMP BOOTOM FOR SP-55 FOR MCCB |
| 18 | stud Stay Clamp for Sp-23 with Nut & bolt (size of flat = 50mm x 6mm & size of Nut & bolt = 16mm x 65mm) (for pole stay) |
| 19 | Piercing connector for 120-50 sq mm |
| 20 | Piercing connector for 70-25 sq mm |
| 21 | Piercing connector for neutral size 95-50sq mm |
| 22 | Piercing connector for neutral size 50-25sq mm |
| 23 | LT distribution box 3ph,4wire |
| 24 | LT XLPE Cable 1x50sq mm |
| 25 | LT XLPE Cable 1x25sq mm |
| 26 | stone pad 300x300x75mm |
| 27 | Danger board &No.plate with clamp |
| 28 | earth wire clamp for st pole sp-23 with N&B |
| 29 | LT Armoured PowerCable 4x25sq mm |
| 30 | LT Armoured Power Cable 3.5x70sq mm |
| 31 | LT XLPE AB Cable 3x50+1x35+1x16 sq mm |
| 32 | Dead end Clamp for st pole sp-23 |
| 33 | Piercing connector for neutral size 25-25 sq mm |
| 34 | 150 watt HPSV Flood light fitting with all accessoies (for street light) i. 150 watt HPSV Flood lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 35 | PVC cable aluminium 2 x 10 Sq.mm |
| 36 | 415V, 32A Double Pole Iron Clad Main Switch |
| 37 | 70 watt HPSV light fitting with all accessoies (for street light) i. 70 watt HPSV lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 38 | 70 watt LED light fitting with all accessoies (for street light) i. 70 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 39 | 40 watt LED light fitting with all accessoies (for street light) i. 40 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 40 | Aluminium Dowel crimping lugs (for HT & LT side) |
| 41 | Lug 120 Sqmm |
| 42 | LT ACB for 50 KA for 250KVA/400 KVA S/S |
| 43 | Crimping type Lugs for 630 sq mm cable |
| 44 | Crimping type Lugs for 240 sq mm cable |
| 45 | Al Lug 240Sqmm |
| 46 | Al Lug 400 Sqmm |
| 47 | G.I. Pipe 6\\" dia, 3 mtr long |
| 48 | Holding clamp for holding xlpe cable(SP-23 top) |
| 49 | Holding clamp for holding xlpe cable(SP-23 middle) |
| 50 | Holding clamp for holding xlpe cable(SP-23 Bottom) |
| 51 | P.P & holding clamps for SP-55 with Nut & Bolt (Flat size 75mm x 10mm) |
| 52 | Earth-wire Clamp SP-55 with Nut & Bolt (Flat size 50mm x 6mm) |
| 53 | Bottom-Bracing clamp SP-55 with Nut & Bolt (Flat size 50mm x 6mm) |
| 54 | Top-Bracing clamp SP-55 with Nut & Bolt (Flat size 50mm x 6mm) |
| 55 | P.G. clamp for Rabbit conductor |
| 56 | Al binding wire |
| 57 | Danger board & No. plate with clamp |
| 58 | Anti climbing device |
| 59 | Barbed wire |
| 60 | Stone pad (300x300x75mm) |
| 61 | Sundires for Stay |
| 62 | Stay clamp with Nut & Bolt (Flat size 50mm x 6mm) for SP-10/SP-21/SP-23/SP-55 |
| 63 | Stay Insulator |
| 64 | Sundries for Double Pole |
| 65 | Sundries for Single Pole |
| 66 | Sundries for Toff |
| 67 | Sundries for Earthing Total (A) 0.0 B B |
| 68 | Safe Cartage of stock material form store at Roorkee/Rishikesh/Haridwar(SIDCUL) to work site by Pvt truck including loading, unloading & safe stacking (average distance 20KM) |
| 69 | (i) 63 KVA, 11/0.4 KV Transformer |
| 70 | (ii)100 KVA, 11/0.4 KV Transformer |
| 71 | (iii) 250 KVA, 11/0.4 KV Transformer |
| 72 | (iv) 400 KVA, 11/0.4 KV Transformer |
| 73 | ST Pole SP-55 |
| 74 | ST Pole SP-23 |
| 75 | small line material. |
| 76 | Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESSPO sehedule and local approved drawing. |
| 77 | Erection of Double pole SP-55 with complete fitting & grouting as per RESPO norms(incuding excavation, cost of grouting,muffing & fabrication of angle channel etc.) |
| 78 | Erection of single pole SP-55 with complete fitting & grouting as per RESPO norms(incuding excavation, cost of grouting & fabrication of angle channel etc.) and muffing |
| 79 | Mounting of 63 KVA 11/0.4 KV Transformer on D/P with making all connections of HT & L.T. side (complete work). |
| 80 | Mounting of 100 KVA 11/0.4 KV Transformer on D/P with making all connections of HT & L.T. side (complete work). |
| 81 | Installation / mounting of 250 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning. |
| 82 | Installation / mounting of 400 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning. |
| 83 | Mounting & fixing of G.O. Switch & Fuse set on double pole structure including making all connections (complete work). |
| 84 | Mounting and fixing of Lightning Arrestor (complete work). With GI Strip. (G.I. strip (35X6 sqmm) will be provided by the contractor) |
| 85 | Mounting and fixing of DTR Metering cubical with meters (complete work). |
| 86 | INSTALLATION FOR DIGITAL (MCCB) FOR 63 KVA S/S |
| 87 | INSTALLATION FOR DIGITAL (MCCB) FOR100 KVA S/S |
| 88 | Installation of LT ACB with complete work |
| 89 | Double pole of Substation with channel & angle |
| 90 | Laying & jointing of LT cable |
| 91 | CHEMICAL EARTHING FOR 63 KVA S/S |
| 92 | CHEMICAL EARTHING FOR 100 KVA S/S |
| 93 | CHEMICAL EARTHING FOR 250 KVA S/S |
| 94 | CHEMICAL EARTHING FOR 400 KVA S/S |
| 95 | Erection of Delta earthing as per RESPO norms( for eathing of T/F neutral, T/F body ) with GI Strip. (G.I. strip (35X6 sqmm) will be provided by the contractor) |
| 96 | Construction of T/F plinth by using Gatter (C- shape 152x75 mm) & Wire mash fencing height 3 Mtrs and 3x3x3 Mtr. |
| 97 | Erection of stay with comlete grouting, tigthing and nozzling as per RESPO norms |
| 98 | Fixing of Tee-off Channel with complete accessories |
| 99 | Fixing of IPC with AL BAIL for Earthing |
| 100 | Fixing of 11 KV tension clamp with BAIL & IPC |
| 101 | Fixing of 11KV MID SPAN Jointing Kit |
| 102 | Fixing of 11 KV Cable Ties |
| 103 | Chemical earthing |
| 104 | Laying Spreading, stringing, sagging of 11 KV ACS AL-59, 78 SQ MM Covered Conductor |
| 105 | ST Pole SP-55. |
| 106 | Cost of providing and fixing self-adhesive bitumen sheet membrane of 1.5 mm thickness on single steel tubular pole |
| 107 | Erection of ST Pole SP-23 with complete fitting & grouting as per RESPO norms (including excavation & cost of grouting) with muffing |
| 108 | Erection of ST Pole SP-23 with complete fitting & grouting as per RESPO norms (including excavation & cost of grouting) (for pole stay) |
| 109 | Laying ,Spreading,stringing, sagging LT XLPE AB Cable3x120+1x95+1x16 sq mm |
| 110 | Laying ,Spreading,stringing, sagging LT XLPE AB Cable 3x50+1x35+1x16 sq mm |
| 111 | Painting of following pole i. Above ground level upto 8 foot with one coat red oxide & 2 coat insulating paint (not less than 100 Micron and suitable for 5 KV insulation) (including cost of red oxide & insulating paint)ii. After 8 foot one coat red oxide & two coat enamel aluminium paint (including cost of red oxide & enamal paint) |
| 112 | fixing of Piercing connector for neutral |
| 113 | fixing of LT distribution box with clamp |
| 114 | fixing of Suspension clamp with Jhook |
| 115 | fixing of Dead end Clamp for st pole sp-23 |
| 116 | chemical earthing for st pole |
| 117 | Installation of 1 ph. Meter |
| 118 | Installation of 3ph. Meter |
| 119 | Installation of LT PRMC |
| 120 | Laying Spreading,stringing, sagging of LT XLPE Cable AB Cable of size 3Cx25+25 sq mm |
| 121 | fixing of Piercing connector |
| 122 | fixing of Piercing connector for neutral s |
| 123 | fixing of Dead end Clamp for st pole sp-21 |
| 124 | Cartage of following material form store to work site including loading, unloading & safe stacking (average distance - 1 to 30 Km) |
| 125 | 150 watt HPSV Flood light fitting with all accessoies (for street light) i. 150 watt HPSV Flood lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 126 | 70 watt HPSV light fitting with all accessoies (for street light) i. 70 watt HPSV lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 127 | 70 watt LED light fitting with all accessoies (for street light) i. 70 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 128 | 40 watt LED light fitting with all accessoies (for street light) i. 40 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 129 | Mounting of following street light material on pole |
| 130 | 150 watt HPSV Flood light fitting with all accessoies (for street light), including making connection to street light wire and showing glow i. 150 watt HPSV Flood lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 131 | 70 watt HPSV light fitting with all accessoies (for street light), including making connection to street light wire and showing glow i. 70 watt HPSV lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 132 | 70 watt LED light fitting with all accessoies (for street light), including making connection to street light wire and showing glow i. 70 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 133 | 40 watt LED light fitting with all accessoies (for street light), including making connection to street light wire and showing glow i. 40 watt LED - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 134 | Laying of 11 KV XLPE Cable underground by excavation work as per RESPO, climbing of cable on D/P through G.I. Pipe, making connection both side complete work |
| 135 | Fixing of 11 KV Cable Jointing kit |
| 136 | Erection of earthing of pole by earth-rod Complete as per RESPO norms |
| 137 | Total (B) C Dismantling work |
| 138 | Dismantling of 11 KV ACS AL-59,78 SQ MM Covered Conductor |
| 139 | Dismantling of 11KV Tee-off with complete accessories |
| 140 | Dismantling of 11 KV Double pole(on SP-55) with complete accessories(including opening of stay-wire) |
| 141 | Dismantling of 11 KV Single pole(on SP-55) with complete accessories(including opening of stay-wire) |
| 142 | Dismantaling of 63 KVA Transformer from the double pole with opening of connection of HT side & LT side, fuse set, G.O.Switch,L.A,Capacitor, DTR meter along with LT cable & DTR LT distribution boxes |
| 143 | Dismantaling of 100 KVA Transformer from the double pole with opening of connection of HT side & LT side, fuse set, G.O.Switch,L.A,Capacitor, DTR meter along with LT cable & DTR LT distribution boxes |
| 144 | Dismantaling of 250 KVA Transformer from plinth with opening connection of HT side & LT side, opening of fuse set, G.O.Switch,L.A,Capacitor, DTR meter,along with LT cable, DTR LT distribution boxes & fancing |
| 145 | Dismantaling of 400 KVA Transformer from plinth with opening connection of HT side & LT side, opening of fuse set, G.O.Switch,L.A,Capacitor, DTR meter,along with LT cable, DTR LT distribution boxes & fancing |
| 146 | Dismantling of LT XLPE AB Cable3x120+1x95+1x16 sq mm |
| 147 | Dismantling of ST pole SP-23 complete (including opening of stay-wire) |
| 148 | Dismantling of ST pole SP-23 (for pole stay) |
| 149 | Dismantling of 1 ph. Meter |
| 150 | Dismantling of 3ph. Meter |
| 151 | Dismantling of LT PRMC |
| 152 | Dismantling of LT XLPE AB Cable3x50+1x35+1x16 sq mm |
| 153 | Dismantling of of LT XLPE Cable AB Cable of size 3cx25+25 sq mm |
| 154 | Dismantling of ST pole SP-23 ( for pole stay) |
| 155 | Dismantling of following street light materials from poles |
| 156 | 150 watt HPSV Flood light fitting with all accessoies (for street light) i. 150 watt HPSV Flood lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 157 | 70 watt HPSV light fitting with all accessoies (for street light) i. 70 watt HPSV lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 158 | 70 watt LED light fitting with all accessoies (for street light) i. 70 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 159 | 40 watt LED light fitting with all accessoies (for street light) i. 40 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 160 | Safe Back cartage of Stock material from work site to store at Roorkee/Reshikesh/Haridwar (SIDCUL) (after rolling back of cable on drum) by Pvt truck including loading & unloading (average distance 40KM) |
| 161 | LT XLPE AB Cable3x120+1x95+1x16 sq mm |
| 162 | LT XLPE AB Cable3x50+1x35+1x16 sq mm |
| 163 | LT XLPE Cable AB Cable of size 3Cx25+25 sq mm |
| 164 | 11 KV ACS AL-59,78 SQ MM Covered Conductor |
| 165 | 63 KVA, 11/0.4 KV Transformer. |
| 166 | 100 KVA, 11/0.4 KV Transformer. |
| 167 | 250 KVA, 11/0.4 KV Transformer. |
| 168 | 400 KVA, 11/0.4 KV Transformer. |
| 169 | ST Pole SP-55.. |
| 170 | ST Pole SP-23 |
| 171 | small line material.. |
| 172 | Back Cartage of following material form work site to store including loading, unloading & safe stacking (average distance - 1 to 30Km) |
| 173 | 150 watt HPSV Flood light fitting with all accessoies (for street light) i. 150 watt HPSV Flood lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 174 | 70 watt HPSV light fitting with all accessoies (for street light), including making connection to street light wire and showing glow i. 70 watt HPSV lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 175 | 70 watt LED light fitting with all accessoies (for street light) i. 70 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 176 | 40 watt LED light fitting with all accessoies (for street light) i. 40 watt LED lumanary - 1 No.ii. G.I pipe bracket (for street ligth) - 1 No.iii. Clamp with Nut & Bolt (Suitable for G.I pipe bracket and ST pole SP-21/SP-10) - 2 No.iv. PVC copper cable single core 2.5 Sq.mm - 6 Meter |
| 177 | Dismantling of 11 kv XLPE Cable & M.S. Channel safely with opening connection from both sides |
| 178 | TRANSFORMER TROLLY |
| 179 | TRANSFORMER TROLLY CARTAGE AND MOUNTING WORK |
| 180 | Safe Cartage of stock material form store at Roorkee/Rishikesh/ Haridwar(SIDCUL) to work site by Pvt truck including loading, unloading & safe stacking (average distance 40KM) |
| 181 | 400 KVA, 11/0.4 KV Transformer |
| 182 | Small line material |
| 183 | Mounting of 400 KVA Transformer on trolly with making connection of HT side & LT side |
| 184 | Termination of Cable Al 3x70 Sq.mm. XLPE 11 Kv by Heat Shrinkable Jointing Kit for Size 3x70 Sq.mm outdoor Type |
| 185 | Laying & jointing of LT/ HT cable |
| 186 | Trolly movement chagres |
| 187 | TRANSFORMER TROLLY DISMANTLING WORK & BACK CARTAGE TO STORE |
| 188 | Dismantling of 400 KVA Transformer from trolly with opening of connection of HT side & LT side(if have) |
| 189 | Safe Back cartage of Stock material from work site to store at Roorkee/Reshikesh/Haridwar (SIDCUL) by Pvt truck including loading & unloading (average distance 40KM) |
| 190 | 400 KVA, 11/0.4 KV Transformer. |
| 191 | Small line material. |
| 192 | Four tyre trolly size 2m x 4m with handle Total (C) 0.0 Total (A+B+C) 0.0 Note :- GST will be paid extra as actuals. Company/Firm Name Name Designation Date |