| 1 | Cleaning drain , loose soil under liquid mud & taking out garbage by mechanical/manual means lift upto 1.5 m |
| 2 | cleaning of ash garbage & loose soil , taking out garbage from dustbin by manual means lift upto 1.5 m & disposal of surplus excavated soils as directed etc. |
| 3 | Carriage of material by mechanical means including loading , unloadig and dumping upto 2KM for rubbish or waste material etc. |
| 4 | Clearing jungle Excluding uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m |
| 5 | 2.27 Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 6 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in Foundation and Plinth in : CM 1:6 (1 cement : 6 |
| 7 | 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 8 | 11.3.1 Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate |
| 9 | 13.7.2 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand) |
| 10 | 5.12 Providing, hcisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but, excluding cost of reinforcement, with 1:1.5:3 (1 cement 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 11 | 5.22A.4 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Hot rolled deformed bars |
| 12 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 13 | 4.3.2 Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 14 | cleaning of septic tank and removal of rubbish upto 2km lead |
| 15 | 15.7.4 Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar |
| 16 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |