| 1 | MATERIALS FOR PLINTH MOUNTED DSS (Part-A)9 Mtr. long 300 Kg. PSC Pole |
| 2 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 3 | EYE hook for XLPE Aeial bunched Cable |
| 4 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 5 | LT cable raising channel (GI) 75x40x4.8 mm GI channel (GI) (1000 mm long) (7.14 Kg/ Mtr, 6 No's) (Each 6x1x7.14= 42.84 Kg) |
| 6 | Fish Plate 50x6 mm., 2.36 Kg/Mtr., each 0.280 Mtr. length, 6 no's required = (6x2.36x0.280) |
| 7 | 50x6mm GI Flat for earthing, 2.36 Kg/Mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. for LA and 2.5 Mtr. for raising, 11 Mtr. for AB switch, 2.8 Mtr. for HG Fuse, 5x2 Mtr. for DTR Neutral, (1.3+4.5) Mtr. for DTR Body, 0.500 Mtr. for LTDB & AB Switch operating handle, 3 Mtr. for Fencing) (Each 65.6x2.36= 154.81 Kg) |
| 8 | 500 KVA, 11/0.4 KV (Cu) Transformer with Tap changer BIS Energy loss level II, Ammendment-4 |
| 9 | LT Distribution Box with MCCB, Aluminium Busbar for 4 Bay with kit kat fuse for 500 KVA S/S |
| 10 | 1 Cx400 mm² LT XLPE Cable(Un-Armoured) |
| 11 | LT Cable Supporting Channel(GI) 100 X 50 X 6 MM GI Channel(GI) (2000 mm long)(9.56 Kg./Mtr., 2 No's.) (Each 2x2x9.56= 28.56 Kg) |
| 12 | LT Cable Supproting Angle(GI), 50x50x6mm.GI 4.5Kg./mtr.,each Angle(GI) length 2 mtr., 4 nos Angle(GI) required =(4.5x4x2) |
| 13 | Supply of 1.1kV, 4Core, 150 sqmm, XLPE insulation armoured - Aluminium UG cable from LTDB to Pole |
| 14 | 40 mm Nominal bore Gl pipe (medium gauge) earthing device with 3 Mtr. long |
| 15 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 16 | Contingency @ 3% of A |
| 17 | Tools & Plants @ 2% of A (except Stay/Earthing/Cable) |
| 18 | Transportation @ 7.5% of A |
| 19 | Erection charges @ 5% on Trf/Breaker/WPB/H-Pole |
| 20 | Erection charges @ 10% of A (except Trf/Breaker/WPB/H-Pole/HT stay set/GI pole/PSC pole/GI Pipe earthing) |
| 21 | Erection charges @ 20% of PSC Pole |
| 22 | Civil and Services WorksConstruction Earthing chamber including installation of earthing pipe. Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including installation of 3Mtr. GI Pipe 40mm/50mm including welding of GI flat around pipe. |
| 23 | LTDB Plinth |
| 24 | Laying of 4 C x 150 mm² LT XLPE Cable |
| 25 | Laying of 1.1 Kv cable from 400 to 1000 sqmm |
| 26 | Supply of AL Lugs suitable for 400 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 27 | Supply of AL Lugs suitable for 150 sq mm cable/conductor,Crimping with cable and Fixing/connecting include supply anderection of PVC Tape as per voltage requirement. |
| 28 | Supply and erection of double Compression Flameproof TypeGlanding for armored Cable 1C 300-1000 sqmm includingmaking hole in Base plate and dressing of cable along withvermin proofing properly .Supply to be done as per TPCODLSpec and approved make dowells. |
| 29 | Supply and erection of double Compression Flameproof TyреGlanding for armored Cable 3.5/4C 120-185sqmm includingmaking hole in Base plate and dressing of cable along withvermin proofing properly .Supply to be done as per TPCODLSpec and approved make dowells. |
| 30 | Inspection Fee of Transformer (100 KVA to 1000 KVA) |
| 31 | Inspection Fee of LV cable |
| 32 | Inspection Fee of Drawing Checking and Approval |
| 33 | MATERIALS FOR PLINTH MOUNTED DSS (Part-B)WPB (GI) Pole 160X152 (11Mtr. Long, 30.44Kg/ Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner= 334.84 Kg+10.74 Kg=345.58 Kg) |
| 34 | 9 Mtr. long 300 Kg. PSC Pole |
| 35 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 36 | EYE hook for XLPE Aeial bunched Cable |
| 37 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 38 | LT cable raising channel (GI) 75x40x4.8 mm GI channel (GI) (1000 mm long) (7.14 Kg/ Mtr, 6 No's) (Each 6x1x7.14= 42.84 Kg) |
| 39 | Top Channel Gl 100 X 50 X 6 mm. (3000 mm long) (9.56Kg/Mtr., 2 no's) (Each 2x3x9.56= 57.36 Kg) |
| 40 | Fish Plate 50x6 mm., 2.36 Kg/Mtr., each 0.280 Mtr. length, 6 no's required = (6x2.36x0.280) |
| 41 | AB Switch Mounting Channel (GI) 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 nơ's) (Each 2x3x7.14 = 42.84 Kg) |
| 42 | AB Switch Side Şupport Channel 100X50X6 mm, 9.56 Kg/Mtr., each channel length 0.35 Mtr., 2 no's channel (GI) required =9.56x2x0.35) |
| 43 | Channel (GI) Support for down Pipe 75X40X4.8mm., 7.14Kg/Mtr., each channel length 0.8 Mtr., 1 no's channel required = (7.14x0.8x1) |
| 44 | HG/DO Fuse Mounting Channel (GI) 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg/Mtr., 2 no's) (Each 2x3x7.14= 42.84 Kg) |
| 45 | Cantilever Support Channel (GI) 75x40x4.8 mm GI Channel (810 mm long, 2 no's) (7.14Kg./Mtr., 2 no's) (Each 2x0.810x7.14= 11.57Kg) |
| 46 | Cantilever Support Angle (GI) 50x50x6 mm GI (1282 mm long) (4.5Kg./Mtr., 2 no's) (Each 2x1.282x4.5= 11.54Kg) |
| 47 | Double pole belting channel 75x40x4.8 mm., 7.14 Kg/Mtr., each channel length 3 Mtr., 2 no's channel required = (7.14x3x2) |
| 48 | 50x50x6 mm GI bracing angle (GI) , 4.5 Kg/ Mtr., each angle (GI) length 3.512 Mtr., 2 no's angle required = (4.5x3.512x2) |
| 49 | 50x6mm GI Flat for earthing, 2.36 Kg/Mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. for LA and 2.5 Mtr. for raising, 11 Mtr. for AB switch, 2.8 Mtr. for HG Fuse, 5x2 Mtr. for DTR Neutral, (1.3+4.5) Mtr. for DTR Body, 0.500 Mtr. for LTDB & AB Switch operating handle, 3 Mtr. for Fencing) (Each 65.6x2.36= 154.81 Kg) |
| 50 | 55 mm² All Alloy Aluminium Conductor (AAAC) XLPE covered conductor |
| 51 | 1 Cx630 mm² LT XLPE Cable(Un-Armoured) |
| 52 | LT Cable Supporting Channel(GI) 100 X 50 X 6 MM GI Channel(GI) (2000 mm long)(9.56 Kg./Mtr., 2 No's.) (Each 2x2x9.56= 28.56 Kg) |
| 53 | LT Cable Supproting Angle(GI), 50x50x6mm.GI 4.5Kg./mtr.,each Angle(GI) length 2 mtr., 4 nos Angle(GI) required =(4.5x4x2) |
| 54 | Supply of 1.1kV, 4Core, 150 sqmm, XLPE insulation armoured - Aluminium UG cable from LTDB to Pole |
| 55 | AB Switch(11KV, 200A, 3pole, 50Hz) |
| 56 | DO Fuse( 11KV, 200A, 3Pole) |
| 57 | 20 AMP Fuse Link |
| 58 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 59 | POLYCARBONATE BIRD GUARD |
| 60 | Disc insulator (B&S)70 KN polymer |
| 61 | HW fiting (B&S)70KN(3 Bolted) |
| 62 | Lightning Arrester(12KV, 10KA) Station Class 2 |
| 63 | 11KV pin insulator polymer |
| 64 | HT Stay set complete |
| 65 | HT stay Clamp (1.9Kg/ Pair) |
| 66 | HT stay insulator TYPE-C |
| 67 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 68 | 40 mm Nominal bore Gl pipe (medium gauge) earthing device with 3 Mtr. long |
| 69 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 70 | GI Barbed wire/Anticlimbing device (3Kg/Pole) |
| 71 | Back Clamp for anticlimbing device 25x3 mm. flat (GI), 0.59Kg/ Mtr. Flat of 0.510 Mtr. length & 2 no's =(2x0.59x0.510) |
| 72 | Danger plate 11kv |
| 73 | Back Clamp for Danger plate 25x3 mm. flat, 0.59Kg/Mtr. Flat of 0.510 Mtr. length 2 no's=(2x0.59x0.510) |
| 74 | Name plate |
| 75 | Structure Numbering and Marking(i)Yellow Colour Paint for Backaround (GIS Numbering & Zebra Stripping) for Background |
| 76 | (ii)Black Colour Paint for numbering (GIS Numbering & Zebra Stripping) for Background |
| 77 | Contingency @ 3% of A |
| 78 | Tools & Plants @ 2% of A (except Stay/Earthing/Cable) |
| 79 | Transportation @ 7.5% of A |
| 80 | Erection charges @ 5% on Trf/Breaker/WPB/H-Pole |
| 81 | Erection charges @ 10% of A (except Trf/Breaker/WPB/H-Pole/HT stay set/PSC pole/ GI Pipe earthing) |
| 82 | Erection charges @ 20% of PSC Pole |
| 83 | Civil and Services WorksConcreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX1800mm) = 0.450Cum. (Per Pole) (For WPB Pole) |
| 84 | Couping ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX450mm) = 0.113 Cum. (Per Pole) |
| 85 | PCC ration 1:3:6 (M-10 Grade) For DSS Area (3.5x2.5x0.1)= 0.875 Cum |
| 86 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6 (M-10 Grade) size (900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set, stay wire, stay nsulator. |
| 87 | Construction Earthing chamber including installation of earthing pipe. Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including installation of 3Mtr. GI Pipe 40mm/50mm including welding of GI flat around pipe. |
| 88 | LTDB Plinth |
| 89 | DTR Plinth |
| 90 | Laying of 4 C x 150 mm² LT XLPE Cable |
| 91 | Laying of 1.1 Kv cable from 400 to 1000 sqmm |
| 92 | SITC and Erection of GI Fencing with Gate |
| 93 | Concreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX1500mm) = 0.375Cum. (Per Pole) (For PSC Pole) |
| 94 | Supply of AL Lugs suitable for 400 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 95 | Supply of AL Lugs suitable for 150 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 96 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 1C 300-1000 sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 97 | Supply and erection of double Compression Flameproof Tyре Glanding for armored Cable 3.5/4C 120-185sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells. |
| 98 | Inspection Fee of Transformer (100 KVA to 1000 KVA) |
| 99 | Inspection Fee of LV cable |
| 100 | No. of DP Mounted DSS (Part-C)WPB (GI) Pole 160X152 (11Mtr. Long, 30.44Kg/ Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner= 334.84 Kg+10.74 Kg=345.58 Kg) |
| 101 | 9 Mtr. long 300 Kg. PSC Pole |
| 102 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 103 | EYE hook for XLPE Aeial bunched Cable |
| 104 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 105 | LT cable raising channel (GI) 75x40x4.8 mm GI channel (GI) (1000 mm long) (7.14 Kg/ Mtr, 3 No's) (Each 3x1x7.14= 21.42 Kg) |
| 106 | Top Channel Gl 100 X 50 X 6 mm. (3000 mm long) (9.56Kg/Mtr., 2 no's) (Each 2x3x9.56= 57.36 Kg) |
| 107 | Fish Plate 50x6 mm., 2.36 Kg/Mtr., each 0.280 Mtr. length, 6 no's required = (6x2.36x0.280) |
| 108 | AB Switch Mounting Channel (GI) 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg./Mtr., 2 nơ's) (Each 2x3x7.14 = 42.84 Kg) |
| 109 | AB Switch Side Şupport Channel 100X50X6 mm, 9.56 Kg/Mtr., each channel length 0.35 Mtr., 2 no's channel (GI) required =9.56x2x0.35) |
| 110 | Channel (GI) Support for down Pipe 75X40X4.8mm., 7.14Kg/Mtr., each channel length 0.8 Mtr., 1 no's channel required = (7.14x0.8x1) |
| 111 | HG/DO Fuse Mounting Channel (GI) 75x40x4.8 mm GI Channel (3000 mm long)(7.14Kg/Mtr., 2 no's) (Each 2x3x7.14= 42.84 Kg) |
| 112 | Cantilever Support Channel (GI) 75x40x4.8 mm GI Channel (810 mm long, 2 no's) (7.14Kg./Mtr., 2 no's) (Each 2x0.810x7.14= 11.57Kg) |
| 113 | Cantilever Support Angle (GI) 50x50x6 mm GI (1282 mm long) (4.5Kg./Mtr., 2 no's) (Each 2x1.282x4.5= 11.54Kg) |
| 114 | Transformer Base GI Channel (GI) 100X50X6 mm (3000 mm long)(9.56 Kg/Mtr, 2 nos (Each 2X3X9.56=57.36 Kg) |
| 115 | Transformer Base Support GI Channel (GI) 100X50X6 mm (515 mm long) (9.56 Kg/Mtr, 2 nos (Each 2X0.515X9.56=9.85 Kg) |
| 116 | Transformer Belting Angle (GI) 50X50X6 mm GI (3000 mm long) (4.56 Kg/Mtr, 2 nos (Each 2X3X4.5 Kg) |
| 117 | Transformer Belting Support Angle (GI) 50X50X6 mm GI (580 mm long) (4.56 Kg/Mtr, 2 nos (Each 2X0.580X4.5 Kg) |
| 118 | LTDB Mounting Angle (GI) 50X50X6 MM GI (1000 mm long) (4.5 Kg/Mtr, 2 nos) (Each 2X1X4.5 Kg) |
| 119 | 50x6mm GI Flat for earthing, 2.36 Kg/Mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. for LA and 2.5 Mtr. for raising, 11 Mtr. for AB switch, 2.8 Mtr. for HG Fuse, 5x2 Mtr. for DTR Neutral, (1.3+4.5) Mtr. for DTR Body, 0.500 Mtr. for LTDB & AB Switch operating handle, 3 Mtr. for Fencing) (Each 65.6x2.36= 154.81 Kg) |
| 120 | LT Distribution Box with MCCB, Aluminium Busbar for 3 Bay with kit kat fuse for 63 KVA S/S |
| 121 | 55 mm² All Alloy Aluminium Conductor (AAAC) XLPE covered conductor |
| 122 | 4Cx95 mm² LT XLPE Cable(Armoured) - For 63 KVA Trf |
| 123 | 4Cx95 mm² LT XLPE Cable(Armoured) - From LTDB to Pole |
| 124 | AB Switch(11KV, 200A, 3pole, 50Hz) |
| 125 | DO Fuse( 11KV, 200A, 3Pole) |
| 126 | 5 AMP Fuse Link |
| 127 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 128 | POLYCARBONATE BIRD GUARD |
| 129 | Disc insulator (B&S)70 KN polymer |
| 130 | HW fiting (B&S)70KN(3 Bolted) |
| 131 | Lightning Arrester(12KV, 10KA) Station Class 2 |
| 132 | 11KV pin insulator polymer |
| 133 | HT Stay set complete |
| 134 | HT stay Clamp (1.9Kg/ Pair) |
| 135 | HT stay insulator TYPE-C |
| 136 | 7/10 SWG GI stay wire, Grade -2 (15Kg./ Set) |
| 137 | 40 mm Nominal bore Gl pipe (medium gauge) earthing device with 3 Mtr. long |
| 138 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 139 | GI Barbed wire/Anticlimbing device (3Kg/Pole) |
| 140 | Back Clamp for anticlimbing device 25x3 mm. flat (GI), 0.59Kg/ Mtr. Flat of 0.510 Mtr. length 8 no's =(8x0.59x0.510) |
| 141 | Danger plate 11kv |
| 142 | Back Clamp for Danger plate 25x3 mm. flat, 0.59Kg/Mtr. Flat of 0.510 Mtr. length 2 no's=(2x0.59x0.510) |
| 143 | Name plate |
| 144 | Structure Numbering and Marking(i)Yellow Colour Paint for Backaround (GIS Numbering & Zebra Stripping) for Background |
| 145 | (ii)Black Colour Paint for numbering (GIS Numbering & Zebra Stripping) for Background |
| 146 | Contingency @ 3% of A |
| 147 | Tools & Plants @ 2% of A (except Stay/Earthing/Cable) |
| 148 | Transportation @ 7.5% of A |
| 149 | Erection charges @ 5% on Trf/Breaker/WPB/H-Pole |
| 150 | Erection charges @ 10% of A (except Trf/Breaker/WPB/H-Pole/HT stay set/PSC pole/ GI Pipe earthing) |
| 151 | Erection charges @ 20% of PSC Pole |
| 152 | Civil and Services WorksConcreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX1800mm) = 0.450Cum. (Per Pole) (For WPB Pole) |
| 153 | Couping ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX450mm) = 0.113 Cum. (Per Pole) |
| 154 | PCC ration 1:3:6 (M-10 Grade) For DSS Area (5x3x0.1)= 1.5 Cum |
| 155 | Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6 (M-10 Grade) size (900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set, stay wire, stay nsulator. |
| 156 | Construction Earthing chamber including installation of earthing pipe. Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including installation of 3Mtr. GI Pipe 40mm/50mm including welding of GI flat around pipe. |
| 157 | Laying of 4 C x 95 mm² LT XLPE Cable |
| 158 | SITC and Erection of GI Fencing with Gate |
| 159 | Concreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX1500mm) = 0.375Cum. (Per Pole) (For PSC Pole) |
| 160 | Supply of AL Lugs suitable for 95 sq mm cable/ conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 161 | Supply and erection of double Compression Flameproof Tyре Glanding for armored Cable 3.5/4C 50-95sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly. Supply to be done as per TPCODL Spec and approved make dowells. |
| 162 | MATERIALS FOR PLINTH MOUNTED DSS (Part-D)WPB (GI) Pole 160X152 (13Mtr. Long, 30.44Kg/ Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner= 395.72 Kg+10.74 Kg=406.46 Kg) |
| 163 | Top Channel Gl 100 X 50 X 6 mm. 9.56 Kg/Mtr each channel (GI) length 3 mtr., 2 no's channel (GI) required = 2x9.56x3) |
| 164 | Fish Plate 50x6 mm., 2.36 Kg/Mtr., each 0.280 Mtr. length, 6 no's required = (6x2.36x0.280) |
| 165 | AB Switch Mounting Channel (GI) 75x40x4.8 mm 7.14Kg./Mtr., each channel (GI) length 3 Mtr 2 nos channel (GI) required =(7.14x3x2) |
| 166 | AB Switch Side Şupport Channel (GI) 100X50X6 mm, 9.56 Kg/Mtr., each channel length 0.35 Mtr., 2 no's channel (GI) required |
| 167 | Channel (GI) Support for down Pipe 75X40X4.8mm., 7.14Kg/Mtr., each channel length 0.8 Mtr., 1 no's channel required = (7.14x0.8x1) |
| 168 | Double pole belting channel (GI) 75x40x4.8 mm., 7.14 Kg/Mtr., each channel length 3 Mtr., 2 no's channel (GI) required = (7.14x3x4) |
| 169 | 50x50x6 mm GI Bracing Angle (GI) , 4.5 Kg/ Mtr., each angle (GI) length 3.512 Mtr., 4 no's Angle required = (4.5x3.512x4) |
| 170 | Danger plate 11kv |
| 171 | Back Clamp for Danger plate 25x3 mm. flat, 0.59Kg/Mtr. Flat of 0.510 Mtr. length 2 no's=(2x0.59x0.510) |
| 172 | HT stay clamp, 50x8 mm Flat (GI), 3.14 Kg/Mtr, 0.551 Mtr Length, 2 nos qty. required (1 Pair) |
| 173 | HT Stay set complete |
| 174 | HT stay insulator TYPE-C |
| 175 | 7/10 SWG GI stay wire (15Kg./ stay) |
| 176 | GI Pipe Earthing 40mm 3 Mtr Long |
| 177 | 50x6mm GI Flat for earthing, 2.36 Kg/Mtr., (12.5 Mtr for L.A, 3 Mtr for AB switch Body, 2.5 Mtr for mesh formation and 2.5 mtr for Raising= 20.5x2.36 |
| 178 | GI Barbed wire anticlimbing device 3Kg per support, 2 nos qty required- 2x3 KG |
| 179 | Back Clamp for anticlimbing device 25x3 mm. flat (GI), 0.59Kg/ Mtr. Flat of 0.510 Mtr. length & 8 no's =(8x0.59x0.510) |
| 180 | Lightning Arrester(12KV, 10KA) Station Class 2 |
| 181 | AB Switch(11KV, 400A, 3pole, 50Hz) |
| 182 | 11KV pin insulator polymer |
| 183 | HW fiting (B&S)70KN(3 Bolted) |
| 184 | Disc insulator (B&S)70 KN polymer |
| 185 | NON Metallic Ties-11KV 100SQMM CVRD AAAC |
| 186 | IPC for 100 sqmm AAA conductor (For covered conductor)-11 KV |
| 187 | GI Nuts, Bolts & Washer of different sizes (13.718 Kg each DP with AB switch) |
| 188 | Black Colour Paint (GIS Numbering & Zebra Stripping) |
| 189 | Yellow Colour Paint (GIS Numbering & Zebra Stripping) for Background |
| 190 | Contingency @ 3% of A |
| 191 | Tools & Plants @ 2% of A (except HT Stay Set/GI Pipe Earthing) |
| 192 | Transportation @ 7.5% of A |
| 193 | Erection charges @ 5% on Trf/Breaker/WPB/H-Pole |
| 194 | Erection charges @ 10% of A (except Trf/Breaker/WPB/H-Pole/HT stay set/PSC pole/ GI Pipe/ PSC Pole/ GI Pipe Earthing) |
| 195 | Civil and Services WorksFixing of complete 11KV line Complete stay set includes1) Turn Buckle Assembły2) Stay Rod & Stay plate3) Stay Insulator4) Stay Wire5) Stay clamps with Nuts & bolts BA will do the excavation including excavation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmX 500mmX 800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 196 | Concreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX2200mm) =0.55Cum. (Per Pole) |
| 197 | Couping ratio 1:1.5:3 (M-20 Grade)with dimension ( 500X500X450)= 0.1125 Cum.(Per Pole) |
| 198 | Provide necessary civil material for construction of Earthing chamber, excavation & installation of incuding earthing pipe dia up to 100mm dia for length of 3Mtr. Scope also includes necessary nutbolt, 25 Kg Bentonide Powder, connection & welding with incoming earth Flat(GI). The work to be executed as per TPCODL drawing & design |
| 199 | Materials for 11 KV Cut Point with 180 Degree Angle (Part-E)WPB (GI) Pole 160X152 (11Mtr. Long, 30.44Kg/ Mtr.) (Total Pole Weight with Base Plate & Stiffner= 334.84 Kg+10.74 Kg=345.58 Kg) |
| 200 | Straight cross arm 100X50X6 mm, 9.56Kg/Mtr., each channel (GI) length 1.2 Mtr., 2 no's. channel (GI)required= (2X9.56X1.2) |
| 201 | Fish plate (GI) 50X6 mm, 2.36 Kg/ Mtr., each 0.280 Mtr. length, 8 no's required= (8X2.36X0.280) |
| 202 | Straight cross arm 100x50x6 mm, 9.56Kg/Mtr., each channel (GI) length 0.306 Mtr., 2 no's. channel (GI) required= (2X9.56X0.306) |
| 203 | Danger Plate, 1 no's |
| 204 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 205 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 206 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4no's = (4x0.59x0.510) |
| 207 | 11 KV pin insulator polymer |
| 208 | H W fitting (B&S) 70 KN, 3 Bolt |
| 209 | Disc insulator (B&S) 70 KN polymer |
| 210 | Earthig of support (Coil type) |
| 211 | No-8 GI wire (Dia 4.6 mm) 0.131 KG/ Mtr.-2 Mtr. For connecting pole with coil earthing |
| 212 | NON METALLIC TIES-11KV 100SQMM CVRD AAAC |
| 213 | IPC for 100 sq.mm AAA conductor (For covered conductor)-11 KV |
| 214 | GI Nut, Bolt & Washer of different sizes (3.55 Kg each Cut pole) |
| 215 | Black Paint(GIS Numbering & Zebra Stripping) |
| 216 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 217 | Contingency @ 3% of A |
| 218 | Tools & Plants @ 2% of A |
| 219 | Transportation @ 7.5% of A |
| 220 | Erection charges @ 5% on Trf/Breaker/WPB/H-Pole |
| 221 | Erection charges @ 10% of A (except Trf/Breaker/WPB/H-Pole/HT stay set/PSC pole/ GI Pipe earthing) |
| 222 | Civil and Services WorksConcreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX1800mm) =0.45Cum. (Per Pole) |
| 223 | Couping ratio 1:1.5:3 (M-20 Grade)with dimension ( 500X500X450)= 0.1125 Cum.(Per Pole) |
| 224 | Materials for 11 KV Cut Point with 90 Degree Angle (Part-F)WPB (GI) Pole 160X152 (11Mtr. Long, 30.44Kg/ Mtr.) (Total Pole Weight with Base Plate & Stiffner= 334.84 Kg+10.74 Kg=345.58 Kg) |
| 225 | Straight cross arm 100X50X6 mm, 9.56Kg/Mtr., each channel (GI) length 1.2 Mtr., 4 no's. channel (GI)required= (4X9.56X1.2) |
| 226 | Fish plate (GI) 50X6 mm, 2.36 Kg/ Mtr., each 0.280 Mtr. length, 16 no's required= (16X2.36X0.280) |
| 227 | Straight cross arm 100x50x6 mm, 9.56Kg/Mtr., each channel (GI) length 0.306 Mtr., 4 no's. channel (GI) required= (4X9.56X0.306) |
| 228 | Danger Plate, 1 no's |
| 229 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 230 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 231 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4no's = (4x0.59x0.510) |
| 232 | 11 KV pin insulator polymer |
| 233 | H W fitting (B&S) 70 KN, 3 Bolt |
| 234 | Disc insulator (B&S) 70 KN polymer |
| 235 | Earthig of support (Coil type) |
| 236 | No-8 GI wire (Dia 4.6 mm) 0.131 KG/ Mtr.-2 Mtr. For connecting pole with coil earthing |
| 237 | NON METALLIC TIES-11KV 100SQMM CVRD AAAC |
| 238 | IPC for 100 sq.mm AAA conductor (For covered conductor)-11 KV |
| 239 | HT Stay clamp, 50X8 mm. flat 3.14Kg/ Mtr, 0.551 Mtr length 2 no's qty required (1 Pair) |
| 240 | HT Stay Set (Complete) |
| 241 | HT Stay Insulator Type-C |
| 242 | 7/10 SWG Stay Wire 15kg/ stay |
| 243 | GI Nut, Bolt & Washer of different sizes (7.433 Kg each Cut pole) |
| 244 | Black Paint(GIS Numbering & Zebra Stripping) |
| 245 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 246 | Contingency @ 3% of A |
| 247 | Tools & Plants @ 2% of A (Except HT Stay Set) |
| 248 | Transportation @ 7.5% of A |
| 249 | Erection charges @ 5% on Trf/Breaker/WPB/H-Pole |
| 250 | Erection charges @ 10% of A (except Trf/Breaker/WPB/H-Pole/HT stay set/PSC pole/ GI Pipe earthing) |
| 251 | Civil & ServicesFixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembły 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5) Stay clamps with Nuts & bolts BA will do the excavation including excavation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmX 500mmX 800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 252 | Concreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX1800mm) =0.45Cum. (Per Pole) |
| 253 | Couping ratio 1:1.5:3 (M-20 Grade)with dimension ( 500X500X450)= 0.1125 Cum.(Per Pole) |
| 254 | MATERIALS FOR 11 KV Pin Points With WPB (Part-G)WPB (GI) Pole 160X152 (13Mtr. Long, 30.44Kg/ Mtr.)-DP (Total Pole Weight with Base Plate & Stiffner= 395.72 Kg+10.74 Kg=406.46 Kg) |
| 255 | 11 KV V Cross Arm (GI) (10.2 Kg each) |
| 256 | Top Bracket 100x50x6 mm GI channel (GI) (2Kg each) |
| 257 | Danger Plate, 1 no's |
| 258 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 259 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 260 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4no's = (4x0.59x0.510) |
| 261 | 11 KV pin insulator polymer |
| 262 | Earthig of support (Coil type) |
| 263 | No-8 GI wire (Dia 4.6 mm) 0.131 KG/ Mtr.-2 Mtr. For connecting pole with coil earthing |
| 264 | GI Nut, Bolt & Washer of different sizes (7.433 Kg each Cut pole) |
| 265 | 100 SQ.MM. AAAC XLPE Covered Conductor-1 kV |
| 266 | Black Paint(GIS Numbering & Zebra Stripping) |
| 267 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 268 | NON METALLIC TIES-11KV 100SQMM CVRD AAAC |
| 269 | Contingency @ 3% of A |
| 270 | Tools & Plants @ 2% of A |
| 271 | Transportation @ 7.5% of A |
| 272 | Erection charges @ 5% on Trf/Breaker/WPB/H-Pole |
| 273 | Erection charges @ 10% of A (except Trf/Breaker/WPB/H-Pole/HT stay set/PSC pole/ GI Pipe earthing) |
| 274 | Civil & ServicesConcreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX1800mm) =0.45Cum. (Per Pole) |
| 275 | Couping ratio 1:1.5:3 (M-20 Grade)with dimension ( 500X500X450)= 0.1125 Cum.(Per Pole) |
| 276 | MATERIALS FOR LT AB Cable Line (Part-H)9 Mtr. long 300 Kg. PSC Pole |
| 277 | LT Stay set Complete |
| 278 | 7/12 SWG GI stay wire, Grade -2 |
| 279 | LT stay Clamp ( 1.40Kg/ pair) |
| 280 | LT Stay insulator |
| 281 | LT Accessories with Eye hook and Clamp(i)Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 282 | (ii)EYE hook for XLPE Aerial bunched Cable. |
| 283 | (iii)Dead End Clamp suitable for messenger XLPE Aerial bunched Cable. |
| 284 | (iv)Suspension Clamp with EYE hook for ABC |
| 285 | 4Cx95 mm² (P)+1Cx70+1x95 mm²(M)+1Cx16 mm² (Street Light) (LT AB cable) |
| 286 | 4 WAY SERVICE Distb. Box with kit kat fuse and Aluminium bus bar. |
| 287 | Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm. |
| 288 | GI Pipe Earthing (each 5th pole to earth) |
| 289 | Coil Earthing |
| 290 | No-8 GI wire (Dia 4.6mm) 0.131 Kg/Mtr-2 Mtr. For connecting pole with Coil earthing |
| 291 | Danger plate (LT) |
| 292 | Back Clamp for danger Plate 25x3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 293 | GI barbed wire anticlimbing device 3 Kg. per support |
| 294 | Back Clamp for anticlimbing devíce 25x3 mm. flat, 0.59Kg/Mtr. flat of 0.510Mtr. length 4 no's = (4x0.59x0.510) |
| 295 | GI Nut. Bolt & Washer of different sizes (0.5 Kg/ Pole) |
| 296 | Black Paint (GIS Numbering & Zebra Stripping) |
| 297 | Yellow Colour Paint (GIS Numbering & Zebra Stripping) for Background |
| 298 | Contingency @ 3% of A |
| 299 | Tools & Plants @ 2% of A (Except LT Stay set/ GI Pipe earthing) |
| 300 | Transportation @ 7.5% of A |
| 301 | Erection charges @ 10% of A (except Trf/Breaker/WPB/H-Pole/HT stay set/PSC pole/ GI Pipe earthing) |
| 302 | Erection charges @ 20% of PSC Pole-Not to be used for 33 KV |
| 303 | Civil & ServicesFixing of LT complete stay set includes 1) Turn Buckle Assembły 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5) Stay clamps with Nuts & bolts BA will do the excavation including excavation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmX 500mmX 800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500) mm |
| 304 | Concreting ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX1500mm) =0.375Cum. (Per Pole) |
| 305 | Construction Earthing chamber including installation of earthing pipe. Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe |
| 306 | Inspection Fee of Over Head Line (LV) Rs. 375 upto 1 Km |
| 307 | Inspection Fee of Over Head Line (LV) Rs. 225/ Additional Km |
| 308 | Dismantling of 11/13 Mtr. Joist/WPB Pole 150X150 mm/ 160X160 mm |
| 309 | Dismantling of 9/8 Mtr. PCC/Jolst Pole |
| 310 | Dismantling / Removal of V Cross arm from pole |
| 311 | Dismantling of 11kV Pin Insulator with Pin |
| 312 | Dismantling of 11kV Disc Insulator with Hardware |
| 313 | Dismantling / Removal of MS Channel. from Double Pole Structure/pole |
| 314 | Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 25KVA including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 315 | Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 63KVA including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 316 | Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer below 100KVA including removal of HT/LT leads, earth connections and unioading by crane if required. |
| 317 | Dismantling of existing 11/0,4kV, 33/0.4KV, 250kVA Three Phase Distribution Transformer including removal of HT/LT leads, earth Jconnections and unloading by crane if required. |
| 318 | Dismantling of ACSR/AAAC 80/100 mm2 from overhead line |
| 319 | Dismantling of varous size of LT AB Cable |
| 320 | Dismantling of Stay set complete |
| 321 | Dismantling of Stay insulator(Guy Insulator) |
| 322 | Dismantling of Danger Board |
| 323 | Dismantling of Lighten ing Arrester(LA Please Enable Macros to View BoQ information |