| 1 | Dismantling of brick work including staking at distance of 100 m with all cost of labour, T&P etc.as per direction of engineer in charge |
| 2 | Dismantling of CC (1:4:8) including staking at distance of 100 m with all cost of labour, T&P etc.as per direction of engineer in charge |
| 3 | Dismantling of RCC including staking at distance of 100 m with all cost of labour, T&P etc.as per direction of engineer in charge |
| 4 | Earth work in making Road Diversion for V.R.B. Construction including all lead , lift, labour and T&P etc.as per direction of engineer in charge |
| 5 | Earth work in excavation for foundation including back filling with all lead & lift labour and T&P etc for completion of work as direction of Engineer-in-Charge |
| 6 | Centering & shutering for C.C. block including cost of all material , labour and T&P etc |
| 7 | Centering & shutering for R.C.C. works including all cost of materials, labour and T&P etc. required for proper completion of the work.as per direction of engineer in charge |
| 8 | Cutting, bending, binding of reinforcement(Fe500) and placing in proper position including all cost of material with steel, labour and T&P etc. required for porper completion of the work as per drawing in direction of engineer-in-charge |
| 9 | Laying of cement concrete ( 1:2:4) with all material, labour, T&P etc. required for proper completion of work with coarse sand F.M. not less than 2.00 with Aggregate size (20mm to 40mm) |
| 10 | Laying of concrete mixed of grade (M-25) ncluding all cost of materials, labour and T&P etc. as per direction of engineer-in-charge |
| 11 | S/F Drainage pipe in slab of 75 mm dia PVC including all cost of material, labour and T&P etc. required for proper completion of the work. |
| 12 | E/W for making ramp including all lead, lift ,chharri ,bajari with proper compaction and dressing upto profile as per direction of engineer in charge |
| 13 | S/F joint filler board including all labour ,material t&p etc. |
| 14 | Boring and lowering of caging pipe for dewatering as per site including all cost of material, labour, T&P etc. as per direction of engineer-in-charge |
| 15 | Dewatering with 5.0 H.P. diesel pump , including operator & P.O.L. etc. required for completion of works.as per direction of engineer-in-charge |
| 16 | Filling local sand below bricks soling including cost of all material labourt T&P etc. |
| 17 | Brick on edge soling on ramp including cost of all labour, maerial, T&P etc. |
| 18 | Painting two coat of synthetic enemel paint on concrete surface with approved quality including cost of all material, labour T&P required for proper completion of work .as per direction of engineer-in-charge |
| 19 | Earth work for removing of ramp including all Lead & lift cost of all labor T&P etc.as per direction of engineer-in-charge |
| 20 | Writing of letter printing over painting upto 50 mm size, Including cost of all material labour T&P etc. |
| 21 | P/F of Sign board as per engineer incharge. |
| 22 | Earth work for correcting internal section of canal in u/s and d/s VRB including all cost of material labour T&P etc. as per profile in direction of engineer in charge Please Enable Macros to View BoQ information |