| 1 | boat jetty |
| 2 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. |
| 3 | 15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge. |
| 4 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. |
| 5 | OD19024/2025-2026:Pluck out the R C C square pile , and removing the same and disposing it far away from the site at contractors own dumping yard at contractors own risk including all hire charges for the plant and equipment etc all as directed by the engineer in charge. |
| 6 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts |
| 7 | 5.33.1.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cementAll work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum |
| 8 | OD19021/2025-2026:Conveying, lifting, handiling, hoisting, aligning and fixing R.C.C 300 mm square, 6-12 m in length from the place of casting to placing site driving plant up to a distance of 150 m including hire charges for planks, wooden scantiling, coire rope,crow bars, etc. complete |
| 9 | OD19016/2025-2026: Driving down RCC piles of 300mm square in size to the required depth in line and levels and shifting the casted piles to the driving spot without damaging the pile with necessary lifting equipments placing in correct position to line and driving down to required depth with the help of driving equipment including hire charges for driving equipment, machinery,planks, fuels, labour charges etc complete as per the direction of the departmental officers at site |
| 10 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers |
| 11 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform |
| 12 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 13 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 14 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 15 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 16 | 10.28:Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) |
| 17 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 18 | 12.26.1:Providing and fixing plain multipurpose cement board(Hight pressure steam cured) with suitable screws for cement particle board in ceiling etc. complete (frame work to be paid seperatately).6 mm thick cement fiber board as per IS: 14862 |
| 19 | OD19020/2025-2026:Providing Colour coated Asphalt roofing Shingles including sufficient length of ridge pieces as roof covering for boat jetty roof neatly laid and water proofing the roof full as per the direction ofdepartmental officers at site |
| 20 | 13.65.1:Painting with black anti- corrosive bitumastic paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 21 | OD40504/2025-2026:Providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from M.S. sheets and galvanized with zinc coating of 120 gms/ sqm (both side inclusive) as per IS : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37 mm, at 1200 mm centre to centre, one flange fixed to the ceiling support , other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 300 mm centre to centre, shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 300 mm centre, with 25 mm long dry wall screws @ 230 mm interval, including fixing of panels to ceiling section and perimeter channel with the help of dry wall screws , including jointing and finishing to a flush finish of tapered and square edges of the panel , all as per manufacturer's specification and also including the cost of making openings for light fittings, grills, diffusers, cutouts made with frame of perimeter channels suitably fixed, all complete as per drawings, specification and direction of the Engineer in Charge with: UPVC Louvered Ceiling panel wooden finish of Good Quality with 20 years warranty and approved by the Engineer in charge |
| 22 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) |
| 23 | 13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm |
| 24 | OD40512/2025-2026:Supplying and paving 50 mm thick trolley cut flamed granite slab for paving in floor laid over 20 mm thick cement mortar 1:4 with cement slurry laid and neatly finished as per the direction of the Engineer in charge. |
| 25 | 8.2.2.2:Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.Area of slab over 0.50 sqm |
| 26 | 11.46.2:Providing and laying Vitrified tiles indifferent sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, in skirting, riser of steps, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand), including grouting the joint with white cement & matching pigments etc. complete.Size of Tile 600x600 mm |
| 27 | 60.64.1:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. |
| 28 | OD19026/2025-2026:Coconut Pile - Driving down coconut pile to lines and levels through <,br> soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. details for the one post of 6m long 15 numbers per day 6x15=90m |
| 29 | 60.64.6:Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m |
| 30 | 60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site. |
| 31 | 60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site. |
| 32 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site |
| 33 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site |
| 34 | OD19017/2025-2026:Random rubble masonry with hard stone in foundation and plinth up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 35 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 36 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 37 | OD19019/2025-2026:Supplying and fixing old tyre on the fender post to resist the impact of stopping boat |
| 38 | OD40513/2025-2026:Supply installation testing commissioning of Octogaonal Pole made of hot dip galvanised GI sheet 70mm top diameter, 130mm bottom diameter thickness 3mm base plate dimensions of 200x200x12mm suitable for wind speed as per IS 875 Part III single arm bracket 0.5mt including connector foundation bolt 4 nos fixed in existing RCC foundation and junctions box etc.complete 5 Meters (item 90.15.3.1 of DAR electrical) |
| 39 | OD40514/2025-2026: Solar powered Lights installation in false ceiling Including all Components and Integration of Unit. - Supply, installation and integration of Solar powered Lights with Solar panel 590 watts, Charge controller for solar power and solar battery 100 amps with 5 years replacement warranty, including earthing for pole with 10 swg copper & earthing rode, sufficient Cables for power delivery in conduits as per the approved design, battery power controller, with 6 watts spotlight (7Nos) & 8 watts Spotlight (2 Nos) as specified by the engineer in charge as per the approved design of good make (Crompton, Philips,etc...), Structure Fabrication with Materials , Charge Controller – 10 amps rated and DC to AC converter 200 W, Dual Pole Isolator for Battery Power 1 nos, Solar Battery – 100 Ah (solar tubular battery) , including all charges and lights integration complete. The rate shall be inclusive of Solar Panels, Battery, Charge Controller and Other commodities related for the work, Shipping and other costs for the Solar Power Components, Base structure fabrication and Pole Erection, Earthing for Solar Pole and lights Integration and Demo etc complete. The warranty details shall be :- Solar Panels - 25 years including 10 years on against manufacturing defects and 15 years on against performance. |
| 40 | OD40515/2025-2026:Supply, conveyance, installation, testing and commissioning of 30W (or higher) Integated Solar LED light fitting with all accessories. Each unit should include 18V,60Wp Inbuilt Monocrystalline panel with Grade A solar cells, 18Ah, 12.8V LiFePO4 type battery, Luminaire housing component to be Aluminium alloy with powder paint, IP65, LED chip shall be Philips/Wipro, THD <10%, efficiency greater than 85%,3800-4500 lumens ,etc. as required with 5years warranty . Luminaire shall be suitable for mounting at a height of 5-6m , should have 24hrs autonomy, PIR sensor for better efficient lighting. (Certifications:MNRE/IEC/BIS/LM80/ROHS/IP65). The unit shall be of good quality and brand of make (Philips/Wipro) and to be approved by the engineer in charge. |
| 41 | OD19027/2025-2026:Designing and installing and fixing in position Curtain Wall for Place identification board with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building and letters in 3D with acrylic sheet as per the approved drawing , for all heights and all levels etc. including checking of all the structural and functional design. b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in wooden finish colour of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Alumini um sheets (each0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500based PVDF / Lumiflon based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc. c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing The item includes cost of all material & labour component, the cost of all mock ups at site, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium items. The Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete , as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places. |
| 42 | temporary jetty |
| 43 | 60.64.1:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. |
| 44 | OD19015/2025-2026:Coconut Pile - Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. |
| 45 | 60.64.6:Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m |
| 46 | 10.25.1:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases, including use of chequered plate wherever required, all complete |
| 47 | 10.26.1:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.M.S. tube |
| 48 | Conveyance charges |
| 49 | OD19012/2025-2026:Conveyance charge for water transporting rubble, aggregates and sand items, Cement, bituminous material etc.using single screw barge which includes transportation, handling and all hire charges of barge , labour etc. unforeseen if any as per suitability of site etc. complete |
| 50 | OD19013/2025-2026:Conveyance charge for water transporting steel items using single screw barge which includes transportation, handling and all hire charges of barge , labour etc. unforeseen if any as per suitability of site etc. complete |
| 51 | OD19011/2025-2026:Conveyance charge of water transporting all materials like coconut post for piling, shuttering materials, formwork, roofing materials, paint , machineries, bearings etc. other than steel, concrete, sand, rubble and bituminous materials which includes transportation, handling and all hire charges of barge , labour etc. unforeseen if any as per suitability of site etc. transporting cost for each trip complete |
| 52 | OD19014/2025-2026:Daily Hire of fibre boat with OBM of size 3m to 6m with 2 boatmen as and when directed by the Engineer- in-charge for inspection/ survey of canal Please Enable Macros to View BoQ information |