Name of Work:- Construction of Double span VRB at Drain Near Ganeshpura Village
Sl. No.
Item Description
1
Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required.
2
Earth work in Excavation including loading, unloading, disposal and dressing of excavated earth within intial lead of 50m and lift up to 1.5 m in dry or moist including dressing of excavated area dewatering wherever required complete in all respect (b)Hard / Dense soil
3
Providing and laying in position Cement concrete Nominal mix (1:3:6) M-10 including leads of all construction materials, curing , compaction and finshing with rendering in cement mortar 1:3 ( 1 Cement : 3 Coarse sand ) and making good the joints excluding the cost of centring, shuttering and reinforcement and finishing having well graded crushed broken stone aggregate of maximum size up to 20mm
4
Providing and laying in position Cement concrete Nominal mix (1:1.5:3) M-20 including leads of all construction materials, curing , compaction and finshing with rendering in cement mortar 1:3 ( 1 Cement : 3 Coarse sand ) and making good the joints excluding the cost of centring, shuttering and reinforcement and finishing having well graded crushed broken stone aggregate of maximum size up to 20mm
5
Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and removing
6
Side shuttering including proping etc. complete (to achieve finish f2 (a) for block joints of foundation, stilling basins, buckets, aprons etc. (non-suspended horizontally lain mass concrete) for Dowels.
7
Supplying of M.S. reinforcement including labour charges for bending, binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using toe or ribbed bar (IS:1786-1985)
8
Providing and Laying in position of Cement concrete Design mix M25 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; (For mix design Cement content considered 420 kg/ cum ofconcrete) Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.