| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 2 | Providing and laying in position Cement concrete of specified grade excluding the cost of centering and shuttering – all work upto plinth level.1:5:10(1 cement : 5 coarse sand : 10 graded crushed stone aggregate 40 mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering –All work upto plinth level 1:3:6 using 20% plum of nallah split stone ( 1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20mm nominal size ) crushed |
| 4 | Stone filling hand packed in horizontal level including the cost of the stone |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone |
| 6 | Centering and Shuttering including strutting, propping etc and removal of form work for mass concrete |
| 7 | Foundations, footings, bases for columns |
| 8 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 9 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge |
| 10 | Providing and applying tack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On W.B.M. @ 0.75 Kg/sqm. |
| 11 | 2.5 cm premix carpet surfacing with 2.25cum and 1.12 cum of stone chippings of 13.2 mm and 11.2mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). |
| 12 | Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete. |
| 13 | Carriage of material from source to site of work by mechanical transport including loading /unloading and stacking complete. |
| 14 | Sand for an average distance of 130 kms by M.T |
| 15 | Stone aggregate below 40 mm nominal size for an average distance 20 km by M.T |
| 16 | Stone for an average distance of 5 Km by M.T Please Enable Macros to View BoQ information |