|
| 1 | RPM Road Stud shall be moulded from ASA (Acrylic Styrene Acrylonitrite) or HIPS (High-Impact Polystyrene) or Acrylonitrite Butadien Styrene (ABS) or Any other suitable material approved by the Engineer. The Marker shall support a load of 13,635 g tested in accordance with ASTM D4280.The Reflective panels shall consist of number of lenses contatning single or dual prismatic cubes capable of providing total internal reflection of the light entring the lens face. Lenses shall be mouled of methyl methecrylate conforming to ASTM D788 of equivalent. The slop or retro-reflecting surface shall preferably be 35+/-5 degree to base and the area of each retro- reflecting surface shall not be less than 13.00 sq.cm. the marker height shall not be less than 10 mm and shall not exceed 20 mm & Width shall not exceed 130 mm. The base of the marker shall be flat within 1.3 mm all road studs shall be legibly marked with the name trade or other means of identification of the manufacture, epoxy installations, excess adhesive around the edge of the marker, excess adhesive on the pavement and adhesive on the exposed surfaces of the markers shall be immediately removed. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. In addition, a two year warranty for satisfactory infield performance of the finished road marker shall also be given by the contractor who carries out the work of fixing of reflective road markers. In case the markers are displaced, damaged, get worn out or lose their reflectivity compared to stipulated standards, the contractor would be required to replace all such markers within 15 days of the intimation from the Engineer, at his own cost. The rate shall include all materials, labour, T&P, transportation, installation and incidentals all complete. UPPWD SOR 2022/22.18 |
| 2 | Reflective raised pavement markers (Road studs/Cat eye) Solar Power road marker (Solar Studs) The solar studs shall be made of Aluminium alloy and poly carbonate material which shall be absolutely weather resistant and strong enough to support a load of 13,635 kg tested in accordance with ASTM D4280. Its colour may be white, red, yellow, green or blue or combination as directed by the Engineer. Its water resistance shall meet the requirements of IP 65 in accordance with IS: 12063:1987 category 2 for protection against waler ingress. The dimensions of solar studs shall not be less than 100 mm X 100 mm X 10 mm. It shall have super bright LEDs so as to provide fong visibility from a distance of more than 800 m. Its flashing rate shall not be less than 1 Hz. Its should be able to give the prescribed performance in the temperrature range of -400C to +550C. Its life shall be not less than 3 Years. The rate shall include all materials, labour, equipments, fabrication, transportation, erection, installation and incidentals all complete as per direction of the Engineer-in-charge |
| 3 | Retro Reflectorised Signs (Stainless steel Framo and Post with one side sings) Supply & fixing of reflective sign board (Single side) of size 1.50x1.20 m retro reflective sheeting of HIP grade type-IV, the board shall be fixed on 50mm SS 304 grade pipe and reflective sheet on 4 mm thick, ACM sheet of standard make as per MORTH specificaton. The Board shall be fixed using 2 man post 45x45x60 cm cement concrete foundation. The stainless steel joint welding of SS pipe work shall be band and grinder property including bufting so an to give uniform shining at weded joints. The Retro reflective sheeting shall be tested for a certificate of having the sheeting tested for coefficient of retro reflection, daytime colour and luminance, shrinkage, flexibility, liner removal, adhesion, impact resistance, specular gloss and fungus resistance, 3 years outdoor weathering and its having passed these tests shall be obtained from International/Government Laboratory/ Institute by the manufacturer of the sheeting and in case the certificate is obtained from international condition, it should also be obtained from Indian condition within 3 years of launching of product by the manufacture in abroad. Alternatively, a certificate conforming to ASTM Specification (D 4956-09) on artificial accelerated weathering requirements from a reputed laboratory in India can be accepted provisionally. In such a situation, the Employer/Client, if so desires, could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years outdoor weathering of the sheeting as per IRC 67:2012. Legends, letters, numerals and borders etc should be as per MoRTH specification No-801.3.7. Proof of the same in form of government report shall be uploaded while quoting tender |
| 4 | Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth ad directed by the Engineer in charge up to a distance of 30m. from the foundation trenches including all T&P phowarah and basket etc. complete (Where Machine not reached/Move) UPPWD SOR |
| 5 | Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in proportions of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. UPPWD SOR |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete.Based on UPPWD SOR 2020/DAR-18/5.9.1 |
| 7 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. UPPWD SOR/5.9.2 |
| 8 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering,shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.(Note :- Cement content considered in this item is @ 330 kg/cum.Excess/less cement used as per design mix is payable/recoverable. All work up to plint level. UPPWD SOR/5.33.1 |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Cold twisted bars. UPPWD SOR/5.22.6 |
| 10 | Providing Wall Putty on new Surface with approved quality material of Berger/J.K/Birla or similar make 2 coats. UPPWD SOR/15.22/662 |
| 11 | Painting with synthetic enamel paint of approved brand andmanufacture of required colour to give an even shade Please Enable Macros to View BoQ information |