| 1 | Routine & Preventive Maintenance of Raw Coal Feeder and Seal Air Fans. | Routine & Preventive Maintenance of Raw Coal Feeder and Seal Air Fans. |
| 2 | Routine & Preventive Maintenance of Ball Mills and their Lubricating system. | Routine & Preventive Maintenance of Ball Mills and their Lubricating system. |
| 3 | Unloading of steel ball at site from the trucks and charging in the ball mills through the system. | Unloading of steel ball at site from the trucks and charging in the ball mills through the system. |
| 4 | Unloading of steel balls at site from the trucks and charging in the ball mills through man hole/ trunion tube. | Unloading of steel balls at site from the trucks and charging in the ball mills through man hole/ trunion tube. |
| 5 | Collecting scrap material and drums from BMD-II, BTPS site scrap yard, picking/stacking it category wise e.g. M.S., S.S., C.I., Alloy steel, mixed steel and empty steel ball drum, old & used S.Tak 40, Off size grinding media steel ball drum etc. then transportation from site scrap yard to central scrap yard by tractor trolley/truck, Hydra for loading/ unloading of heavy scrap material. Tractor trolley/ truck, Hydra shall be provided for the transportation purpose by the Nigam free of cost. | Collecting scrap material and drums from BMD-II, BTPS site scrap yard, picking/stacking it category wise e.g. M.S., S.S., C.I., Alloy steel, mixed steel and empty steel ball drum, old & used S.Tak 40, Off size grinding media steel ball drum etc. then transportation from site scrap yard to central scrap yard by tractor trolley/truck, Hydra for loading/ unloading of heavy scrap material. Tractor trolley/ truck, Hydra shall be provided for the transportation purpose by the Nigam free of cost. |
| 6 | Attending fault of COC including Rectification/ Joining of the COC (Clean out conveyor )chain. | Attending fault of COC including Rectification/ Joining of the COC (Clean out conveyor )chain. |
| 7 | Removal of foreign material e.g. bunker grating, steel plate, stare cases, impregnated rubber pads etc by cutting pulling from R C feeder body/Centre pipe of ball mill | Removal of foreign material e.g. bunker grating, steel plate, stare cases, impregnated rubber pads etc by cutting pulling from R C feeder body/Centre pipe of ball mill |
| 8 | Cleaning of various grills, Platform, Stairs and hand railing of Boiler from ‘O’ meter to ‘15’meter (Thrice a week UNIT4#156, UNIT5#156) | Cleaning of various grills, Platform, Stairs and hand railing of Boiler from ‘O’ meter to ‘15’meter (Thrice a week UNIT4#156, UNIT5#156) |
| 9 | Cleaning of various grills, Platform, Stairs and hand railing of Boiler from ‘15’meter to ‘22’meter (Thrice a week UNIT4#156, UNIT5#156) | Cleaning of various grills, Platform, Stairs and hand railing of Boiler from ‘15’meter to ‘22’meter (Thrice a week UNIT4#156, UNIT5#156) |
| 10 | Cleaning of various grills, Platform, Stairs and hand railing of Boiler from ‘22’meter to ‘35’meter (Thrice a week UNIT4#156, UNIT5#156) | Cleaning of various grills, Platform, Stairs and hand railing of Boiler from ‘22’meter to ‘35’meter (Thrice a week UNIT4#156, UNIT5#156) |
| 11 | Cleaning of various grills, Platform, Stairs and hand railing of Boiler from ‘35’meter to ‘49’meter (Thrice a week UNIT4#156, UNIT5#156) | Cleaning of various grills, Platform, Stairs and hand railing of Boiler from ‘35’meter to ‘49’meter (Thrice a week UNIT4#156, UNIT5#156) |
| 12 | Cleaning of various grills, Platform, Stairs and hand railing of Boiler from ‘49’meter to ‘57’meter (Thrice a week UNIT4#156, UNIT5#156) | Cleaning of various grills, Platform, Stairs and hand railing of Boiler from ‘49’meter to ‘57’meter (Thrice a week UNIT4#156, UNIT5#156) |
| 13 | Cleaning of various grills, Platform, Stairs and hand railing of Boiler from ‘57’meter to ‘75’meter (Thrice a week UNIT4#156, UNIT5#156) | Cleaning of various grills, Platform, Stairs and hand railing of Boiler from ‘57’meter to ‘75’meter (Thrice a week UNIT4#156, UNIT5#156) |
| 14 | Cleaning of entire coal pipe from outlet of mills to Boiler (Thrice a week UNIT4#156, UNIT5#156) | Cleaning of entire coal pipe from outlet of mills to Boiler (Thrice a week UNIT4#156, UNIT5#156) |
| 15 | Cleaning of Dust Bin of Boiler are (Thrice a week UNIT4#104, UNIT5#104) | Cleaning of Dust Bin of Boiler are (Thrice a week UNIT4#104, UNIT5#104) |
| 16 | Cleaning and water washing of area ‘O’ meter from H row to wall along ESP hopper area (North side) (DAILY UNIT4#365, UNIT5#365) | Cleaning and water washing of area ‘O’ meter from H row to wall along ESP hopper area (North side) (DAILY UNIT4#365, UNIT5#365) |
| 17 | Cleaning and water washing of Boiler area from drain along ESP hopper (North Side) to facing beyond Chimney. (DAILY UNIT4#365, UNIT5#365) | Cleaning and water washing of Boiler area from drain along ESP hopper (North Side) to facing beyond Chimney. (DAILY UNIT4#365, UNIT5#365) |
| 18 | Cleaning and water washing of floor around the scrapper conveyor (H to K row) (DAILY UNIT4#365, UNIT5#365) | Cleaning and water washing of floor around the scrapper conveyor (H to K row) (DAILY UNIT4#365, UNIT5#365) |
| 19 | Cleaning of complete 15 meter area RC Feeder floor. (DAILY UNIT4#365, UNIT5#365) | Cleaning of complete 15 meter area RC Feeder floor. (DAILY UNIT4#365, UNIT5#365) |
| 20 | Cleaning of ball mill platform and ‘O’ meter floor including the removal of oil grease etc. (DAILY UNIT4#365, UNIT5#365) | Cleaning of ball mill platform and ‘O’ meter floor including the removal of oil grease etc. (DAILY UNIT4#365, UNIT5#365) |
| 21 | Cleaning and water washing of Boiler area beyond unit no.#5 Mill and SSC area up to fencing including material/Scrap yard up to F.O.P.around chimney. (DAILY UNIT4#0, UNIT5#365) | Cleaning and water washing of Boiler area beyond unit no.#5 Mill and SSC area up to fencing including material/Scrap yard up to F.O.P.around chimney. (DAILY UNIT4#0, UNIT5#365) |
| 22 | Cleaning and water washing of Boiler area between Unit No. 4&5 including row from CPP building up to around chimney. (DAILY UNIT4#365, UNIT5#0) | Cleaning and water washing of Boiler area between Unit No. 4&5 including row from CPP building up to around chimney. (DAILY UNIT4#365, UNIT5#0) |
| 23 | Cleaning and water washing of Boiler area (West Side) from column 3 to the area up to the conveyor 05A/B from H row to the ash slurry pump house (only cemented floor. (DAILY UNIT4#365, UNIT5#0) | Cleaning and water washing of Boiler area (West Side) from column 3 to the area up to the conveyor 05A/B from H row to the ash slurry pump house (only cemented floor. (DAILY UNIT4#365, UNIT5#0) |
| 24 | Cleaning of all cable tray Hot & Cold Air duct and related structure at ‘O’ meter level to R.C. Feeder floor of mill site (From A to H mill) | Cleaning of all cable tray Hot & Cold Air duct and related structure at ‘O’ meter level to R.C. Feeder floor of mill site (From A to H mill) |