Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Shaft Insulator 1016 mm
2
Thermax Make ESP 2
Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Rapper Coil
3
Thermax Make ESP 3
Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Hypalon Boot
4
Thermax Make ESP 4
Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Worm Gear clamp (Big end)
5
Thermax Make ESP 5
Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Worn Gear clamp (Small end)
6
Thermax Make ESP 6
Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Row Cardbbvb
7
Thermax Make ESP 7
Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Column Card
8
Thermax Make ESP 8
Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. DC Thyristor unit
9
Thermax Make ESP 9
Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. Level Sensor
10
Thermax Make ESP 10
Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. TIC
11
Thermax Make ESP 11
Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. RTD
12
Thermax Make ESP 12
Supply of Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler. HMI
13
Thermax Make ESP SERVICE 13
Dismantling, Erection/Fitting, Commisning and testing of Field Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler and Macke the ESP Complete leak proof. field supervision, tools and tackle and free technical support/helth Checkup during the TWO Crusing Session (free off cost) will be in the scope off the contractor. The work includedDismantling, Erection/Fitting, Commisning, Testing and Trial of Field Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/Cm2 Capacity Boiler and Making the ESP Complete leak proof, field supervision, tools and tackle and free technical support/health checkup during the Two Cruising Sessions (free off cost) will be in the scope off the contractor. The work include 1. Replacement of all the internals of 3 fields. 2. Alignment of all three fields. 3. Repairing of side casing, Inlet/Outiet Nozzles, Hopper Vibrator, Doors etc.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.