| 1 | Supply and erection of follwing material |
| 2 | 11 KV fuse set |
| 3 | Alluminium Binding Wire |
| 4 | Danger Board with clamp |
| 5 | PG clamp |
| 6 | Barbet Wire |
| 7 | Bolt & nut for shackel |
| 8 | MS Guarding angle |
| 9 | G. I. wire 6 /8/10 Swg |
| 10 | Cross Bracing |
| 11 | Clamp with nut bolt |
| 12 | GI Pipe 6'' Dia |
| 13 | DB box three phase with clamp |
| 14 | Earth wire clamp with nut bolt |
| 15 | LT clamp with nut and bolt |
| 16 | Piercing Connector |
| 17 | Dead End Clamp |
| 18 | LT Fuse Set (upto 100KVA) |
| 19 | LT shackel insulator |
| 20 | Safe loading Carriage & unloading of following material from store centre to pit site/JE dump store approx 35 Km. |
| 21 | STP Pole 11 Mtr Long |
| 22 | PCC Pole 8.5 Mtr Long |
| 23 | PCC Pole 13 Mtr Long |
| 24 | 33 KV F bracket |
| 25 | 33 KV polymeric 'Disc fitting |
| 26 | 33 KV polymeric 'Disc Insulator |
| 27 | 33 KV Polymeric pin Insulater with nut |
| 28 | 33 KV V type X-arm MS Angle 65x65x6 mm |
| 29 | 33KV Dropper Channel |
| 30 | 33KV T-off Channel |
| 31 | 33KV Top Channel |
| 32 | 11 KV F bracket |
| 33 | 11 KV polymeric 'Disc fitting |
| 34 | 11 KV polymeric 'Disc Insulator |
| 35 | 11 KV Polymeric pin Insulator with nut |
| 36 | 11 KV V type X-arm MS Angle 65x65x6 mm with Clamp |
| 37 | 11kv Dropper Channel |
| 38 | 11kv T-off Channel |
| 39 | 11kv Top Channel |
| 40 | MS Earthing Complete 20mm |
| 41 | ACSR Dog Conductor |
| 42 | ACSR Rabbit Conductor |
| 43 | ACSR Waeasel |
| 44 | Stay Set Complete |
| 45 | Transformer 100 KVA |
| 46 | Transformer 25 KVA |
| 47 | Transformer 63 KVA |
| 48 | 1x240sqmm Lead for TF |
| 49 | 1x400sqmm Lead for TF |
| 50 | 33 KV XLPE cable 3x300 sqmm |
| 51 | O/D cable termination box 3x300 sqmm |
| 52 | O/D cable termination box 3x185 sqmm |
| 53 | 11 KV XLPE cable 3x185 sqmm |
| 54 | AB conductor 3x120 |
| 55 | AB conductor 3x95 |
| 56 | Erection & Stringing and Sagging of 11 KV & LT line |
| 57 | Erection of PCC 8.5 mtr long Single pole with all accessories(All neccessary item like clamp, Nut bolt, Top channel, Dropper channel, Base angle, etc. will be provided by the contractor at his own cost) |
| 58 | Erection of PCC 8.5 mtr long Double Pole with all accessories(All neccessary item like clamp, Nut bolt, Top channel, Dropper channel, Base angle, etc. will be provided by the contractor at his own cost) |
| 59 | Erection & painting of S.T. single pole 11 mtr. Long all necessary accessories ( All neccesary item like clamp, Nut bolt etc. will be provided by the contractor at his own cost). Painting of new erected ST pole with two coat of paint PO red paint at top of pole 2 mtr. & balance by two coats of best quality aluminum paint. |
| 60 | Erection of all accessories of pole (All neccessary item like pin insulator, disc insulator, fitting,cross arm, clamp, Nut bolt, Top channel, Dropper channel, Base angle, etc. ) |
| 61 | Mounting of 100 KV T/F form dump place to newly constructed Double pole/Plinth & its commissioning including jumepring with all system ((All the required material for above job shall be provided by contractor except T/F) |
| 62 | Mounting of 25 KV T/F form dump place to newly constructed Double pole & its commissioning including jumepring with all system ((All the required material for above job shall be provided by contractor except T/F) |
| 63 | Mounting of 63 KV T/F form dump place to newly constructed Double pole & its commissioning including jumepring with all system ((All the required material for above job shall be provided by contractor except T/F) |
| 64 | Dismentling and Mounting of Existing 25 KV T/F to newly constructed Double pole & its commissioning including jumepring with all system ((All the required material for above job shall be provided by contractor except T/F) |
| 65 | Dismentling and Mounting of Existing 63 KV T/F to newly constructed Double pole & its commissioning including jumepring with all system ((All the required material for above job shall be provided by contractor except T/F) |
| 66 | Dismentling and Mounting of Existing 100 KV T/F to newly constructed Double pole & its commissioning including jumepring with all system ((All the required material for above job shall be provided by contractor except T/F) |
| 67 | Placement of existing 11/0.4 KV T/Fs from site to newly constructed T/Fs plinth & installation commissioning of 250 KVA T/Fs plinth and including jumpering with the system (All the required material for above job shall be provided by contractor except T/Fs |
| 68 | Placement of existing 11/0.4 KV T/Fs from site to newly constructed T/Fs plinth & installation commissioning of 400 KVA T/Fs plinth and including jumpering with the system (All the required material for above job shall be provided by contractor except T/Fs |
| 69 | Construction of T/F plinth of size 2x2x1.5 m on a padding 0.25M deep in ground 1:5:10 cement sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr height & 0.35 mtr wall will be constructed. Rest wall should be 0.23 mtr thick. Brick work in ratio 1:4 cement & cores Sand in the hollow portion the sand should be filled from the ground level up to 15 centimetres below from the top of wall, Cement, sand & brick Ballasts should be filled up to 15 centimetre. Two no. of channel 100x50 in length 1500mm will be grouded.0.35 CM.RCC will be done with cores sand, cement and stone ballast in the ratio of 1:2:4.The T/Fs plinth should be plastered on all sides 12mm thick in ratio 1:6 by cement and cores sand.(All the material to be arranged by the contractor). |
| 70 | Construction of retaining wall, fabrication and erection of wire mesh fencing of size 3+3 and 2.0 mtr height around T/F and distribution pillar box with retaining wall and 01 no. gate with locking arrangement made of MS angle iron of size 50x50x6 mm jointed with the nuts and bolt. The panel must be supported with MS flat of size 50x6 mm wire mesh of size 10 SWG rectangle type. |
| 71 | Stringing & Sagging LT XLPE allumunium cable of size 1X400 sq.mm |
| 72 | Stringing & Sagging LT XLPE allumunium cable of size 1x240 sq.mm |
| 73 | ACSR Dog Conductor stringing sagging binding and jumpering of with all accessories |
| 74 | ACSR Rabbit Conductor stringing sagging binding and jumpering of ABC with all accessories |
| 75 | ACSR Waeasel stringing sagging binding and jumpering of ABC with all accessories |
| 76 | Hoisting of 11 kv XLPE (3x120/3x 185 )sq.mm with the provision of G.I. Pipe of size 150 mm dia. |
| 77 | Hoisting of 33 kv XLPE (3x120/3x 185 )sq.mm with the provision of G.I. Pipe of size 150 mm dia. |
| 78 | Supply and erection of Tailless Unit with all Accessories |
| 79 | Grouting of Pole in deep 1/6 the length of Pole in ratio 1:4:6 in cement sand & bla ST |
| 80 | Erection & painting of S.T. Double pole 11 mtr. Long all necessary accessories ( All neccesary item like clamp, Nut bolt etc. will be provided by the contractor at his own cost). Painting of new erected ST pole with two coat of paint PO red paint at top of pole 2 mtr. & balance by two coats of best quality aluminum paint. |
| 81 | Grouting and Nozzling of 11 KV / 33 kv stayset complete including fixing of necessary clamps. Accessories required including its grouting by civil material (sand, brick blast & cement). All material except stay wire shall be supplied by the contractor. |
| 82 | Ordinary earthing by 11 KV MS earth Rod 2500 mm long as per RESPO schedule. All material except earthing rod shall be supplied by the contractor. |
| 83 | Earthling by way of Boring and lowering the \\"B\\" class GI pipe (Gindal ) of 50mm dia from ground upto water level not less than 20mtr as per standard practice |
| 84 | Laying of 11KV XLPE single cable 3x185 sq mm in HDPE pipe by drill method. (All material including HDPE pipe 150 mm dia PN- 6PE-100 shall be provided by the contractor. Only cable will be provided by the department.) |
| 85 | Laying of 33KV XLPE single cable 3x300 sq mm in HDPE pipe by drill method. (All material including HDPE pipe 150 mm dia PN- 6PE-100 shall be provided by the contractor. Only cable will be provided by the department.) |
| 86 | Installation of 33 kv O/D cable box (3x300). All material shall be supplied by the Department. |
| 87 | Installation of 33 kv O/D cable box (3x185). All material shall be supplied by the Department. |
| 88 | Stringing & Sagging ABC (3X95+1X35+1X16)Sqmm |
| 89 | Stringing & Sagging ABC (3X120+1X95+1X16 Sqmm) |
| 90 | Disconnection of consumer's electricals connection (If service cable required it shall be supplied by the contractor). |
| 91 | Reconnection of consumer's electricals connection (If service cable required it shall be supplied by the contractor). |
| 92 | Dismantling of old & used (Existing) material and loading, Carriage & unloading from site to JE Dump store/store centre, Hardoi. |
| 93 | Dismentling of line as per Site Please Enable Macros to View BoQ information |