| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge in cement mortar. |
| 2 | Demolishing brick work manually! by mechanical means including stacking ofsteel bars and disposal of unserviceable material eith 50 meters lead as per direction of Engineer-in charge |
| 3 | Dismentling of old damage bitumenues road including disposal of refuse etc. all complete. |
| 4 | E/W excavation in soil mixd with Moorum, shingle, Kankar etc. Requining the use of special T & P lift 1.50 mtr. & lead 30 mtr. etc all complet.(177.50x0.78995=140.22) |
| 5 | Earth work in excavation for pies cables etc. in ordinary rock exceeding 1.5m in depth but not exceeding 3m etc. all complete. |
| 6 | P/ C.C. In 1:4:8 cement, c. sand & stone aggrigate 40 mm nominal size etc.all complete.(6812 0x0.78995)=5381.13 |
| 7 | R.C.C. work in 1:2:4 in cement, C sand and 20 mm. stone aggregate etc. all complete Precast Slab (8583.40x0.78995)-6780.46 |
| 8 | Centering and Shuttening including Strutting propping etc and removal of form work(927.25x0 78995=732.48) For slab |
| 9 | R.C.C. work in 1:1.5:3 in cement C sand and 20 mm. stone aggregate etc. all complete(10852.95x0.78995)=8573.28 |
| 10 | M S. or iron work such reinforcement etc, all complete |
| 11 | M.S, or Iron work such as fabrication as frames, railing etc all complete |
| 12 | Barricating arround the tranch etc. all complete |
| 13 | Making of Bandha etc. all complete |
| 14 | Dewatering of Drain by Diesel Pump etc. all complete. |
| 15 | M-150 class of B/W in 1.4 in cement, C sand, morter etc. all complete |
| 16 | 12 mm thick plaster in 1:6 in cement, C.sand morter etc. all complete |
| 17 | S/F 110 mm dia waste and vent pipe ect. All complete |
| 18 | Disposal of Shurplus earth up to 4 km. from site etc. al complete 80% of Item No.-(3) |
| 19 | S/F of Name Board etc all complete |
| 20 | Deduction cost of old material such as brick bats etc. all complete. Bricks (30% of Item No. 2) |
| 21 | Deduction cost of old material such as brick bats etc. all complete.Bricks Bats (70% of Item No. 2) Please Enable Macros to View BoQ information |