| 1 | Providing, laying, jointing, testing and commissioning of \\"Additional work of construction of MWPS & laying of rising main in Hindaun city\\" along with Design, construction, supply, installation, testing and commissioning (Civil, Mechanical, electrical, instrumentation & other necessary works) of Sewage Pumping Station/MWP and rising main including 1-year defect liability and with 10 years O&M of Hindaun City under package AMRUT 2.0/RAJ/SEW/47 |
| 2 | Design, Supply, installation, testing and commissioning of sewer manhole with pumping arrangement (MWP) to avoid deep sewers of required capacity with 100% standby,coarse screen, electric panel,DG Set/invertor of required capacity with all required associated civil, electrical, mechanical and instrumentation work with online monitoring for following capacities at nodes shown in sewer network drawing. As per detailed scope of work and employer's requirment as per tender document. |
| 3 | MWP 1 |
| 4 | Fix Provision for O&M of all facilities created under this contract including but not limited to Sewer Line System , STP and sewerage network etc. for Ten Years as per Tender Document (yearwise payment amount is given in tender document) for Hindaun city townBidder should fill amount Rs. 3750000.00Bidder should fill this amount In case any other amount is filled then it will be consider as 3750000.00 Only. |
| 5 | Provision of Provisional Sum to be used as per Tender Document (FIXED) for Hindaun city townBidder should fill amount Rs. 1000000.00Bidder should fill this amount In case any other amount is filled then it will be consider as 1000000.00 Only. |
| 6 | Providing, laying, jointing, testing and commissioning of \\"Additional work of construction of MWPS & laying of rising main in Hindaun city\\" along with Design, construction, supply, installation, testing and commissioning (Civil, Mechanical, electrical, instrumentation & other necessary works) of Sewage Pumping Station/MWP and rising main including 1-year defect liability and with 10 years O&M of Hindaun City under package AMRUT 2.0/RAJ/SEW/47 |
| 7 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::EarthLead up to 3 Km |
| 8 | Stone, boulders, gravelly material |
| 9 | Dismantling of flexible pavements for sewer line and manholes and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. |
| 10 | Bituminous courses |
| 11 | Granular courses |
| 12 | Dismantling of cement concrete pavement for sewer line and manholes by mechanical means using pneumatic tools, cutting the peripheral edge by CC cutter, breaking to pieces not exceeding 0.02cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), re- handling of material/earth to complete the task. |
| 13 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m |
| 14 | Providing and laying un-reinforced, plain cement concrete mix in pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant, transported to site, laid spread, compacted and finished in a continuous operation including provision of contraction, expansion, admixtures as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion for road restoration under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task.cement concrete 1:3:6 |
| 15 | Providing and laying in position cement concrete of specified grade over a prepared base course complete including finishing, curing all material, labour, machinery, lighting, guarding for road restoration under sewer line and manhole work using RMC (ready mix concrete plant) and Transit mixer including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. including Providing/ mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e.125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar.PCC/ RCC Grade M -25 |
| 16 | Providing, laying, spreading and compacting of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion.Grading - I Material |
| 17 | Providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (WMM) base course comprising of graded stone aggregate and granular material conforming to MORT&H specifications (Table 400-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per MoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 18 | Providing and applying primer coat over prepared surface of granular base with bitumen emulsion as per IS : 8887 and approved quality @ 0.6 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface including removing of binding material and other foreign matter with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 19 | Providing and applying tack coat on the prepared surface with bitumen emulsion as per IS: 8887 and approved quality @ 0.2kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 20 | Providing laying and consolidation Semi Dense Bituminous Concrete, as per Design Mix (approved by Engineer), on prepared surface with specified graded crushed aggregates as per table 500- 15 for wearing coarse including loading of material with F.E. loader, hot mixing of stone aggregate, filler and bitumen (including Cost of anti-stripping compound Minimum 1% in Lime/Cement as per design wherever required) heating and mixing in in computerised hot mix plant, transporting the mixed material by tippers to paver and laying with paver finisher fitted with electronic sensor control to the required level and grade, compacting by power rollers and vibratory rollers or 150 to 250 KN pneumatic tyred roller with TP = 0.7 Mpa, to achieve the desired density (approximately 2.3 tonne/cum) complete as per clause 508 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion but excluding primer/tack coat.35-40 mm compacted thickness (Grade-1) using Bitumen VG-grade 30 @ 4.5% (percent by weight of total mix) |
| 21 | Providing and laying bituminous macadam in 50/75 mm compacted thickness on prepared surface with specified graded crushed stone aggregates as per Table 500-4, Grading-II for base/ binding course, loading of aggregate with F.E. loader, heating and mixing of stone aggregate and bitumen in computerised hot mix plant, transported to site by tippers to paver, laid over a previously prepared surface with paver finisher fitted with electronic sensing device to the required grade, level and alignment and rolling with power roller and vibratory compactor as per clauses 501.6 and 501.7 to achieve the desired compaction complete as per clause 504 of MoRT&H specification and including all material, labour, machinery, lighting, guarding and maintenance of diversion but excluding cost of primer/ tack coat.With Bitumen VG-grade 30 @ 3.3% (percentage by weight of total mix) |
| 22 | Providing, lowering, laying in trenches, aligning, fixing in position andjointing Ductile Iron (DI) ISI marked K-7 grade S&S pipes as per IS:8329-2000 (amended up to date), with internal High Alumina Cement (HAC) mortar lining for gravity sewer network with rubber ring (EPDM) joints as per IS: 5382-1985 (excluding special accessories) complete including all material,labour, hydraulic testing and commissioning as per technical specifications and as per direction of Engineer.Note : E/w to be measured and paid separately. |
| 23 | 350mm Dia |
| 24 | Supply and Pushing of MS casing pipe of specified thickness by trenchless method adopting micro-tunnelling or any suitable mechanical technology or technology approved by Railway below ground at all depth under running traffic condition as per railway standard including carrying out survey work at the job site for determining underground cable trenches like telephone, cable, water & sanitary lines and resistivity test for finding the soil strata using necessary equipment’s for completion of works, mobilizing of machineries and specialized crew at the job site complete in allrespect, including excavation of driven pit and exit pit (upto 3 metre depth) with proper protection at three sites with shoring sheets and ISMB's. Providing MS cutting edges for front shield and Constructing thrust bed at designated level. Necessary de-watering and providing concrete foundation at the base of the driven pit, PVC/Rubber saddle as per the requirement of Railway Authority, crane for handing of pipe and any other machinery, tools, and tackles required, construction of temporary works as per requirement and as per approved by railway authorities, specification and the direction of the Engineer. (Protective coating/ lining if done that will be paid extra) Note- 1. Manual Pipe jacking is not permitted for workmen safety reasons. 2. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.In all types of soil600 mm dia 12 mm thick casing pipe |
| 25 | Providing, jointing, laying, testing and commissioning of HDPE PE- 100/PN-6 (suitable for pulling method for jointing) pipes for sewer line as per IS-14333 (amended upto date) with compliance for maintaining slope as per design by trenchless adopting HDD method (Horizontal Directional Drilling) below ground at all depth including carriage etc. complete in all respect, construction of thrust pit and receiving pit of required size upto 3 metre depth and soil investigation, making suitable arrangement for barricading of pits, traffic diversion, lights, traffic permission from relevant authority (though department will assist in getting the permission), refilling of pits in compacted layers of 150 mm including disposal of surplus material with all lift and lead upto 50 metre as per specification and the direction of the Engineer. Note-1 Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers, Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. Note- 2. Manual Pipe jacking is not permitted for workmen safety reasons.In all types of soil including mixed strata400 mm Outer Dia |
| 26 | Extra for excavation of driven pit/ exit pit / intermediate pit beyond 3 metre depth, required for pushing/ pulling of MS/HDPE/RCC pipe in trenchless technology, with proper protection at three sides with shoring sheets/ wooden planks and ISMB's, maintaining during pushing/ puling of pipe, back filling, necessary de-watering including all machinery, tools, and tackles required as per specification and the direction of the EngineerIn all types of soil |
| 27 | Providing, fixing and constructing of pre-cast RCC M-40 grade circular manholes with internal dia 1.5m and up to specified depth having pre-cast RCC M-40 grade circular manhole cover frame (ID 0.56m, OD 0.92m), conical piece (top ID 0.56m, bottom ID 1.5m, vertical height 1.305m, wall thickness 125mm), and circular rings of required heights (ID 1.5m, height 150/225/300/600/900/1200 mm, wall thickness 125mm) below conical piece as per required depth of manhole and having steel reinforcement in conical piece @ not less than 80 kg per cum of concrete, including cast-in-situ PCC M-10 grade (1:3:6) foundation of 2.125m dia and 150mm thickness, PCC M15 grade circular wall ID 1.425 m, wall thickness 200mm, height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm (to flush the manhole frame with road top, height of wall can be increased but not more than 100mm), PCC M15 grade benching and channel portion and up to top level of sewer pipe etc complete with curing compaction and form work, supplying and fixing heavy duty SFRC manhole cover as per IS 12592 (Part I and II), supplying and fixing plastic encapsulated CI/MS footsteps /SFRC footsteps, including cost of shuttering, steel reinforcement, testing for water tightness etc complete in all respect as per drawing, as per specification and the direction of the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. |
| 28 | Pre-cast RCC M-40 grade circular manhole conical piece with inbuilt cover and frame (height 1.305), cast-in-situ PCC M-10 grade foundation, PCC M15 grade circular wall ID 1.425m, wall thickness 200mm, wall height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item = height of Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe + increased height of wall (if any) + 50mm) |
| 29 | Providing and fixing pre-cast RCC M-40 grade circular ring of ID 1.5m, wall thickness 125mm, height 150/225/300/600/900/ 1200mm for constructing extra depth of manhole beyond depth mentioned in item no-17.61.1 as per drawing. |
| 30 | Providing,lowering,laying in trenches,aligning,fixing in position and jointing at all level/ depths DI K-12 standard, Ductile Iron Double Chambered Restrained Joint sends of 90°, 45°,22.5° and 11.25° with rubber ring (EPDM) joints as per IS:5382-1985,locking rings and locking bars within trenches in DI Restrained Joint pipe line complete including all material,labour,testing and commissioning along with pipe line and as per technical specifications and as per direction of Engineer.Specials Double Chambered Restrained joint DI K-12Upto 600 mm dia |
| 31 | Providing,lowering,laying, aligning, fixing in position in pipe line, manually operated DI D/F Sluice valves of approved make PN 1.0 class of following dia complete (including jointing and jointing material) including all material, labour, testing and commissioning along with pipe line as per Technical Specifications and as per direction of Engineer. |
| 32 | 350mm Dia |
| 33 | Providing,lowering,laying,aligning,fixing in position and jointing in pipe line DI Kinetic Double Air Valves of following dia(including jointing and jointing material), including all material,labour,testing and commissioning as per Technical Specifications and as per direction of Engineer.100mm Dia Please Enable Macros to View BoQ information |