| 1 | EARTH WORK:- Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 2 | Filling and levelling available excavated earth (excluding rock) in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m |
| 3 | CONCRETE WORK:- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) |
| 4 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work: 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. |
| 7 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete Thermo - Mechanically Treated bars of grade Fe-500D or more |
| 8 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer and two coat of epoxy paint, all complete, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes |
| 9 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer and two coat of epoxy paint, all complete. |
| 10 | Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete |
| 11 | 20 mm cement plaster of mix:1:4 (1 cement : 4 fine sand) |
| 12 | Finishing with Deluxe Multi surface paint system for exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm |
| 13 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil |
| 14 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar |
| 15 | Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge |
| 16 | Refixing precoated galvanised iron profile sheets and structural supports. The sheet shall be fixed using self drilling/self tapping screws ofsize (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical orcurved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required |
| 17 | Dismantling existing G.I sheets including Structural steel supports and stacking the material within 50 metres lead of :G.S. Sheet Please Enable Macros to View BoQ information |