| 1 | Dismantling the existing RCC concrete surfaces of RCC fencing posts in transformer yards and removal the debris away from the site as directed by the Engineer in charge including all labour charges, all materials, leads & lifts, transporting etc., complete. |
| 2 | Earth work excavation in soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting with an initial lead of 10m and lift of 2m without damaging the nearby structure and dumping the excavated earth in the nearby area as directed by the Engineer at site including cost of all materials, all lead & lift, T&P's etc., complete., |
| 3 | Providing PCC 1:4:8 mix using 40 mm HBG stone for foundation base concrete as directed by the department Engineer at site, including cost of all materials, all lead and lift, curing etc., complete. |
| 4 | Providing RCC 1:2:4 for footing & pedestal concrete using 12 to 20mm downgraded HBG metal as directed by the Engineer incharge including cost of form work, centering and shuttering, cost of all materials, labour charges, curing, all T&P, lead, lift, etc., complete but excluding cost of steel reinforcement. |
| 5 | Supplying and providing MS angle of size 65x65x6mm for fencing posts and 25x3mm flat as fence posts to support chain link fencing including cutting, welding, placing inposition of MS angle all including cost of materials, transporting charges, lead, lift, etc., complete as directed by the Engineer at site. |
| 6 | Painting one coat in the existing main gate (excluding priming coat) on previously painted steel with Enamel paint including cleaning the surface of all dirt, dust and foreign matter as directed by the Engineer at site including cost of all materials, labour charges, safety appliances, lead, lift, etc., complete. |
| 7 | Painting the new iron work with two coats of enamel paint of approved quality and color over one coat of primer as directed by the Engineer in-charge at site including cost of all materials, labour charges, safety appliances, lead, lift, etc., complete. |
| 8 | Painting two coats over of existing chain link fencing with aluminium paint including cleaning the surface of all dirt, dust and other foreign matter as directed by the Engineer in-charge at site including cost of all materials, labour charges, lead, lift, etc., complete. |
| 9 | Supplying and fixing galvanised steel barbed wire weighing 93.8kg per 100m straining and fixing to any type standard rails, straining bolts, including securing with and all provision of galvanised mild steel wire, strapples or steel pins including cost of materials, labour charges, cleaning the surfaces, scaffolding charges, lead, lift, etc., complete as directed by the department engineer at site. |
| 10 | Stretching the existing chain-link fencing of transformer yards safely as directed by the Engineer at site including cost of materials, all labour charges, lead, lift, etc., complete. |
| 11 | Supplying and positioning the Chain Link - 2\\" x 2\\" using 10 Gauge Galvanised Iron Wire (of all sizes) for the allround fencing for safety purpose as directed by the Engineer at site including cost of all materials, transporting charges, labour charges, welding, cutting, lead, lift, etc., complete. Please Enable Macros to View BoQ information |