|
| 1 | Supplying and erecting 20mm dia. corrugated flexible polypropylene conduit |
| 2 | Supplying and erecting PVC trunking (PVC casing-n-capping) of size 25 mm with accessories on wall/ceiling as per specification No: WG-MA/CON |
| 3 | upplying and erecting mains with 2x1.5 sq.mm FRLSH copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places as per specification No: WG-MA/BW |
| 4 | Supplying and erecting mains with 1x1.5 sq.mm FRLSH copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places as per specification No: WG-MA/BW |
| 5 | Supplying and erecting Ceiling rose / Batten holder /Slanting holder / hanging cord switch / hanging bell push /pendant holder bakelite base 6A. erected on filled polypropylene board or polished double wooden block/PVC junction box. |
| 6 | Supplying and erecting modular type switch 6A / 10A duly erected on provided plate and box with wiring connections complete. |
| 7 | Supplying and erecting modular type 3 pin 6A multi socket with safety shutter, duly erected on provided plate and box with wiring connections complete. |
| 8 | Supplying and erecting modular type (two module) electronic step regulator for fan, duly erected on provided plate and box with wiring connections complete. |
| 9 | Supplying and erecting PVC Surface modular switch box with double mounting plate for 4 module duly erected |
| 10 | Wiring for plug on board with Switch socket surface/concealed type, copper wiring and earthing and with modular accessories as per specification No: WG-PW/CW |
| 11 | Point wiring for light/bell/exhaust fan in PVC trunking (casing-capping) with 1.5 sq.mm (2+1E) FRLSH grade copper wire, modular type switch, earthing and required accessories as per specification No: WG-PW/SW |
| 12 | Point wiring for ceiling fan in PVC trunking (casing-capping) with 1.5 sq.mm (2+1E) FRLSH grade copper wire, modular type switch, earthing and required accessories as per specification No: WG-PW/SW Supplying and erecting CRCA powder coated |
| 13 | Supplying and erecting CRCA powder coated corridor/passage light LED fitting (4 feet) Max. 17W with high transitivity diffuser with system lumens output of Min. 2000 lumens, min. efficacy of 120 lumen/W, CRI>80, CCT upto 6500K, Beam Angle of 120 deg., Ripple<5%, THD<10%, p.f. >0.95, operating range of 120-270V, surge protection of 4 kV, Life class of 50,000 Hrs. at L70B50, including driver, with end caps on provided PVC Block / wooden board with 3 years warranty. |
| 14 | Supplying and erecting bulk head LED fitting max. 10W with high transitivity diffuser with system lumens output of min. 1100 lumens, min. efficacy of 110 lumen/W, CRI>80, CCT upto 6500K, Beam Angle of 120 deg., THD<10%, p.f. >0.95, operating range of 140-260V, in built surge protection of 2.5 kV, Life class of 50,000 Hrs. at L70B50, including driver, IP66, IK09 rated on provided PVC Block / wooden board with 3 years warranty. |
| 15 | Supplying and erecting fresh air cum exhaust fan of light duty 250 V A.C. 50 cycles 225mm. 1400 RPM rust proof body & blades, wire mesh, duly erected, complete. |
| 16 | Supplying and erecting Energy Saving BLDC Ceiling fan 230 V A.C. 50 cycles 1200 mm, max. energy consumption of 28W having service ratio (CMM/W) of Min. 8, PF>0.9, THD<10% with IR remote control/compatible speed regulator, Temperature Rise of Max. 40 deg. C, having external mounted control PCBcompletely erected in position as per specification no. FG-FN/CF |
| 17 | Supplying, erecting & marking SPMCB 6A to 32A, B-series with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB |
| 18 | Supplying, erecting & marking DPMCB 6 A to 32 A, B-series with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB |
| 19 | Supplying, erecting & marking TPMCB 40A to 63A, with -rated short-circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB |
| 20 | Supplying, erecting and marking four pole isolators only switch version of miniature circuit breakers of 40A in provided distribution board. |
| 21 | Supplying and erecting single pole and neutral distribution board (SPNDB), with 2 ways for incoming and 2 ways (2 poles) for outgoing SP MCBs, with door, 1.2mm thickness surface / flush mounted, IP 43Protection on iron / Gl frame as per specification no. SW-SWR/MCBDB |
| 22 | Supplying & erecting CRCA sheet metal one way enclosures of 1.2mm thickness suitable for DP MCB /ТР MCB/FP MCB/RCCB/RCBO complete erected on angleiron/Gl frame. |
| 23 | Providing, erecting & commissioning 4 pole RCCB 40A, with added immunity to avoid DC pulse tripping with 30/100/300 mA sensitivity complete as per specification no. SW-RCCB/RCCB |
| 24 | Supplying, fixing and commissioning 2 pole, RCBO 6/10/16/20/25A, with overcurrent, rated short-circuitbreaking capacity (10 kA) and earth leakage protection, with 30/100/300 mA sensitivity and short circuit and earth leakage trip indication as per specification no SW-RCCB/RCBO |
| 25 | Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 2 core 2.5 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB-LT/CU |
| 26 | Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 10 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB- |
| 27 | Providng earthing with galvanized iron earth plate size 60 x 60 x 0.6 cm complete with all materials, testing & Recording the result as per the specifications no EA EPrecording the results as per specification no. EA-EP Supplying and erecting Gl strip of high purity required size used for earthing on wall and/or any other purpose with necessary Gl clamps fixed on wall painted with bituminous paint with joints required. As per specification no EA-EP. |
| 28 | Supplying and erecting Gl strip of high purity required size used for earthing on wall and/or any other purpose with necessary Gl clamps fixed on wall painted with bituminous paint with joints required. As per specification no EA-EP. |
| 29 | SITC of Electric Traction Passenger Lift with 16Rated capacity:- Passenger/kgFloors: G+3 floor (4) Stops/4Landings)Travel: 16 to 18 mtrsLocation of Lift Machine:- MR/MRL14Rated speed:- 1.0mps VS2000 mm high Car/Landing door clear opening of 900 mm wide xClear Car size of 1300mm wide x110mm deep xmm high1100mm80Lift shaft available having clear size of 1900.mm wide x 1900mm deep, 1500mm Pit depth, 4200mmDoors type:- COPO/TOPO Doors with framemade from SS 304 grade solid (non-cladded) sheet of 1.5mm thick in hairline finish for car and all landing doors with SS door architraves/frames The lift doors shall have minimum 1 hour fire rating (with submission of necessary valid test certificate issued by NABL accredited or Independent test laboratory).Lift car enclosure made from SS 304 grade solid (non-cladded) sheet of 1.5mm, thick with hairline finish with frame made from MS girders, bracing of adequate size with minimum safety factor of 5, with Toe Guard Apron, with necessary false ceiling with adequate LED lights, blower/fan for ventilation & SS chequered plate flooring, handrails, mirror, emergency light etc. The lift car interior design shall be done as per the directions ofCOP with SS face plate having metallic push buttons with Braille code & luminous indicator around button with FPI, scrolling UP/DN LED indicator & with /without attendant key switch, OWD with audio-visual alarm, VAS in Marathi, Hindi & English with intercom system with telephone instrument in Lift car, LMR & FCC/ground floor.[2:11 PM, 5/12/2026] RBK: LOP with SS face plate having recess/surface push button box for all landings with scrolling UP/DN LED indicator having metallic push buttons with Braille code & luminous indicator around button with CPI, Lift car arrival & next travel direction audio-visual indication at all landings.Lift controller based on microprocessor/ PLC with VWVF Drive having closed loop control system, with IBMS compatible having necessary port. The controller shall have necessary protections such as overcurrent, overvoltage, over speed, overheat for all devices including lift motor and travel direction protection, protection for phase loss at input or output etc. various operation modes such as maintenance, change direction by attendant, full load bypass, VIP call operation, self levelling operation, call cancel facility, auto return to home landing, fireman evacuation operation, earthquake operation, door open/close operation from COP etc. The system can record information for minimum 30 latest faults, with real-time clock management and handheld keypad with LCD screen for view and setting of parameters. The control panel duly wired with proper size & strength, copper wire for power & control circuit, with provision for addition of floor/control card & allied accessories control panel having enclosure of 1.5mm CRCA sheet with powder coating with IP54 Protection class.ARD complete with necessary SMF VRLA batteries.Fireman controller having fireman switch at fire Landing.CCTV surveillance system comprises of 2 nos minimum 2.0MP FHD IP based vandal proof Dome camera in lift car & in LMR/inside lift shaft top aimed on Lift machinery & controller with NVR kept in LMR/FCC with HDR data backup for min. 90 days with min. 18\\" FHD TV monitor, to be kept in FCC/LMR as directed by Engineer In Charge.Lift Machine of Gearless PMSM of suitable kW with duty cycle of minimum 120 starts/hr (with submission of necessary valid test certificate issued by NABL accredited or Independent test laboratory), with Traction pulley, OSG, electromagnetic brakes, entire assembly mounted on adequate size girders duly fixed on LMR floor/ shaft walls complete with main/diverter traction sheaves, suspension wire ropes/belts of adequate size & strength.Other mechanical parts such as 'T' section adequate size guide rails for car & counter weight with brackets fasteners, counter weight frame with necessary blocks, buffers with necessary support arrangement, MS pit ladder etc, erected with necessary steel work.LOP with SS face plate having recess/surface push button box for all landings with scrolling UP/DN LED indicator having metallic push buttons with Braille code & luminous indicator around button with CPI, Lift car arrival & next travel direction audio-visual indication at all landings.Lift controller based on microprocessor/ PLC with VWVF Drive having closed loop control system, with IBMS compatible having necessary port. The controller shall have necessary protections such as overcurrent, overvoltage, over speed, overheat for all devices including lift motor and travel direction protection, protection for phase loss at input or output etc. various operation modes such as maintenance, change direction by attendant, full load bypass, VIP call operation, self levelling operation, call cancel facility, auto return to home landing, fireman evacuation operation, earthquake operation, door open/close operation from COP etc. The system can record information for minimum 30 latest faults, with real-time clock management and handheld keypad with LCD screen for view and setting of parameters. The control panel duly wired with proper size & strength, copper wire for power & control circuit, with provision for addition of floor/control card & allied accessories control panel having enclosure of 1.5mm CRCA sheet with powder coating with IP54 Protection class.ARD complete with necessary SMF VRLA batteries.Fireman controller having fireman switch at fire Landing.CCTV surveillance system comprises of 2 nos minimum 2.0MP FHD IP based vandal proof Dome camera in lift car & in LMR/inside lift shaft top aimed on Lift machinery & controller with NVR kept in LMR/FCC with HDR data backup for min. 90 days with min. 18\\" FHD TV monitor, to be kept in FCC/LMR as directed by Engineer In Charge.Lift Machine of Gearless PMSM of suitable kW with duty cycle of minimum 120 starts/hr (with submission of necessary valid test certificate issued by NABL accredited or Independent test laboratory), with Traction pulley, OSG, electromagnetic brakes, entire assembly mounted on adequate size girders duly fixed on LMR floor/ shaft walls complete with main/diverter traction sheaves, suspension wire ropes/belts of adequate size & strength.Other mechanical parts such as 'T' section adequate size guide rails for car & counter weight with brackets fasteners, counter weight frame with necessary blocks, buffers with necessary support arrangement, MS pit ladder etc, erected with necessary steel work.LOP with SS face plate having recess/surface push button box for all landings with scrolling UP/DN LED indicator having metallic push buttons with Braille code & luminous indicator around button with CPI, Lift car arrival & next travel direction audio-visual indication at all landings.Lift controller based on microprocessor/ PLC with VWVF Drive having closed loop control system, with IBMS compatible having necessary port. The controller shall have necessary protections such as overcurrent, overvoltage, over speed, overheat for all devices including lift motor and travel direction protection, protection for phase loss at input or output etc. various operation modes such as maintenance, change direction by attendant, full load bypass, VIP call operation, self levelling operation, call cancel facility, auto return to home landing, fireman evacuation operation, earthquake operation, door open/close operation from COP etc. The system can record information for minimum 30 latest faults, with real-time clock management and handheld keypad with LCD screen for view and setting of parameters. The control panel duly wired with proper size & strength, copper wire for power & control circuit, with provision for addition of floor/control card & allied accessories control panel having enclosure of 1.5mm CRCA sheet with powder coating with IP54 Protection class.ARD complete with necessary SMF VRLA batteries.Fireman controller having fireman switch at fire Landing.CCTV surveillance system comprises of 2 nos minimum 2.0MP FHD IP based vandal proof Dome camera in lift car & in LMR/inside lift shaft top aimed on Lift machinery & controller with NVR kept in LMR/FCC with HDR data backup for min. 90 days with min. 18\\" FHD TV monitor, to be kept in FCC/LMR as directed by Engineer In Charge.Lift Machine of Gearless PMSM of suitable kW with duty cycle of minimum 120 starts/hr (with submission of necessary valid test certificate issued by NABL accredited or Independent test laboratory), with Traction pulley, OSG, electromagnetic brakes, entire assembly mounted on adequate size girders duly fixed on LMR floor/ shaft walls complete with main/diverter traction sheaves, suspension wire ropes/belts of adequate size & strength.Other mechanical parts such as 'T' section adequate size guide rails for car & counter weight with brackets fasteners, counter weight frame with necessary blocks, buffers with necessary support arrangement, MS pit ladder etc, erected with necessary steel work.LOP with SS face plate having recess/surface push button box for all landings with scrolling UP/DN LED indicator having metallic push buttons with Braille code & luminous indicator around button with CPI, Lift car arrival & next travel direction audio-visual indication at all landings.Lift controller based on microprocessor/ PLC with VWVF Drive having closed loop control system, with IBMS compatible having necessary port. The controller shall have necessary protections such as overcurrent, overvoltage, over speed, overheat for all devices including lift motor and travel direction protection, protection for phase loss at input or output etc. various operation modes such as maintenance, change direction by attendant, full load bypass, VIP call operation, self levelling operation, call cancel facility, auto return to home landing, fireman evacuation operation, earthquake operation, door open/close operation from COP etc. The system can record information for minimum 30 latest faults, with real-time clock management and handheld keypad with LCD screen for view and setting of parameters. The control panel duly wired with proper size & strength, copper wire for power & control circuit, with provision for addition of floor/control card & allied accessories control panel having enclosure of 1.5mm CRCA sheet with powder coating with IP54 Protection class.ARD complete with necessary SMF VRLA batteries.Fireman controller having fireman switch at fire Landing.CCTV surveillance system comprises of 2 nos minimum 2.0MP FHD IP based vandal proof Dome camera in lift car & in LMR/inside lift shaft top aimed on Lift machinery & controller with NVR kept in LMR/FCC with HDR data backup for min. 90 days with min. 18\\" FHD TV monitor, to be kept in FCC/LMR as directed by Engineer In Charge.Lift Machine of Gearless PMSM of suitable kW with duty cycle of minimum 120 starts/hr (with submission of necessary valid test certificate issued by NABL accredited or Independent test laboratory), with Traction pulley, OSG, electromagnetic brakes, entire assembly mounted on adequate size girders duly fixed on LMR floor/ shaft walls complete with main/diverter traction sheaves, suspension wire ropes/belts of adequate size & strength.Other mechanical parts such as 'T' section adequate size guide rails for car & counter weight with brackets fasteners, counter weight frame with necessary blocks, buffers with necessary support arrangement, MS pit ladder etc, erected with necessary steel work.Minor civil work such as alteration work if any necessary for erection of landing door frames and it's accessories e.g. sill, header, hole pass etc complete with plaster finish, civil work for erection buffers, erection of lift machinery, adequate size core cuts if required & scaffolding for erecting guide rails, providing and fixing steel girders/RCC work having adequate strength for mounting and hoisting lift machine etc. complete as per specification no. LFT.General: Job includes entire procedure of obtaining all necessary erection permissions & \\"License to Work the Lift\\" from Electrical Inspector(Lifts) with submission to the Engineer In Charge.The above rate includes Fully Comprehensive AMC for one year from the date of commissioning.2 Floor1-2-00For Lift having 800mm wide x 2000mm high clear entrance in 1.5mm thick SS 304 grade solid(non-cladded) landing door [Two panel], this includes all necessary accessories like LOP's with UP/DN buttons-arrows-indicators, extension of guide rails, shaft wiring with trunking, travelling cables, main hoisting ropes/belts, & OSG rope landing doors with all accessories etc. necessary for the normal safe functioning of lift installation complete.For Full Collective control system, add as below.Each1-1-00For Lift travelling above First floor & up to Four floor For additional 2MP Camera along with necessary accessories at Home Landing, add as given |
| 30 | ADD 18% GST Please Enable Macros to View BoQ information |