|
| 1 | Rewinding of 300 HP slipring motor jyoti make startor by replacement of H class copper wire, F claas insulation paper, epoxy wedge, mica sheet, glass tape, connection glass lead 95mm2, Dr. beck varnish, brazing red becktrol, copper brazing thimble etc. compelete in all respect i/c dismantling installed at bed no.7 side at water works sec-32, Chandigarh (Including less against old material). |
| 2 | Rewinding of 300HP motor hyoti make rotor by replacement of copper strip, F class insulation paper, epoxy wedge, glass tape, connection glass lead 95mm2, Dr. beck varnish , copper brazing, Rod, red becktrol, thimble complete in all respect at bed no.7 at water works sec-32, Chandigarh. |
| 3 | Dynamic balancing of rotor. |
| 4 | Replacement by providing and fixing of following bearing complete in all respect of make SKF/FAG |
| 5 | Roller bearing NU 321 ECJC3 driving side |
| 6 | Ball bearing 6321C3 |
| 7 | Providing and fixing of carbon brush holder complete set for the motor of 300 HP at water works sec-32, Chandigarh. |
| 8 | Providing and fixing of carbon brush complete in all respect for the motor of 300 HP at water works sec-32 Chandigarh. |
| 9 | Providing and fixing of slipring of 300 HP motor i/c cost of inner bore turning and key way cutting, locking system, nut bolt complete in all respect installed at bed no.7 pump house at water works sec-32 Chd. |
| 10 | Repairing of split casing horizontal centrifugal pump coupled with 300HP motor installed at bed no.7 in old pump house at water works sec-32, Chd. with replacement of following parts:- |
| 11 | Dsimantling of pump with the help of chain pulley coupled with existing motor complete in all respect. |
| 12 | Providing and fixing gun metal sleeve as per existing size with machining etc. |
| 13 | Providing and fixing of neck ring made of bronze complete in all respect |
| 14 | Providing and fixing of alignment bush |
| 15 | Providing & fixing of check nut complete in all respect. |
| 16 | Providing and fixing of bearing 6314 C3 Make SKF/FAG |
| 17 | Repairing of shaft i/c cost of welding and turning and grinding of bearing size both side complete in all respect. |
| 18 | Dynamic balancing of rotated assembly of 300 HP pump complete in all respect. |
| 19 | Carriage of pump from site to work shop & work shop of site. |
| 20 | Re-fixing of pump after repair complete i/c cost of packing sheet, nut bolt, PVC O ring complete. |
| 21 | Dismantling of 300 HP slipring motor installed at W/W sec-26, Chandigarh. |
| 22 | Rewinding of 215 HP motor stator by replacement copper enamelled copper wire F class insulation paper, epoxy wedge, glass tape, connection glass lead 95mm2 Dr. beck varnish, copper brazing rod, red becktrol, copper thimble i/c dynamic balancing of rotor etc. complete in all respect installed at bed no.2 at W/W sec-26, Chandigarh (less i/c against old material)/ |
| 23 | Rewinding of 215 HP motor rotor by replacement of copper strip F class insulation paper, epoxy wedge, Mica sheet, glass tape, connection glass lead 95mm2 Dr. beck varnish, copper brazing rod, red becktrol, copper thimble etc. i/c dynamic balancing of rotor etc. complete in all respect installed at bed no.2 at W/W sec-26, Chandigarh (less i/c against old material)/ |
| 24 | Dynamic balancing of rotor |
| 25 | Providing and fixing of bearing for 215 HP slipring motor at bed no.2 at water works sec-26, Chd. Make:- SKF |
| 26 | Roller bearing N 319 ECMC3 |
| 27 | Ball bearing 6318/2ZC3 |
| 28 | Providing and fixing of carbon brush complete in all respect in 215 HP slipring motor at bed no.2 at W/W sec-26, Chd. |
| 29 | Providing and fixing of carbon brush Holder complete in all respect in 215 HP slipring motor at bed no.2 at W/W sec-26, Chd. |
| 30 | Repair of regulator 215 HP motor with replacement of insulator complete with copper studs, half round contact, small copper strip, nut bolt, washer, tapping up on T-oil etc. complete in all respect installed at bed no.2 at W/S sec-26, Chd. |
| 31 | Repair of split casing horizontal single stage centrifugal pump coupled with 215 HP slipring motor installed in new pump house at water works sec-26 Chd. with replacement of following parts. |
| 32 | Dismantling of pump with the help of chain pulley coupled with existing motor complete in all respect. |
| 33 | Providing and fixing of gun metal sleeve as per existing size with machining etc. complete in all respects. |
| 34 | Providing and fixing of gun metal alignment bush complete in all respect. |
| 35 | Providing and fixing of bronze neck ring as per exisitng complete in all respect. |
| 36 | Providing and fixing of check nut as per existing size complete in all respect. |
| 37 | Providing and fixing of ball bearing 6314 complete in all respect Make:- SKF |
| 38 | Re-metalling of SS shaft for bearing seat driving and non driving side i/c cost of machnining, turning etc. complete in all respect. |
| 39 | Carriage of pump from site to work shop & work shop of site. |
| 40 | Re-fixing of pump after repair i/c the cost of gland dori, packing sheet complete. |
| 41 | Partial repair of rotor i/c cost of connection glass lead 120mm2-12 mtr, crimping, of thimble both side, cleaning , washing and varnishing red becktrol, backing etc. repairing of cooling air fan, welding, turning and fixing complete in all respect for 430 HP slipring motor at water works sec-26, Chd. |
| 42 | Less against old material Please Enable Macros to View BoQ information |