| 1 | working charges |
| 2 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. |
| 3 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 4 | OD172667/2025-2026:Interconnection from 75/90/110mm pvc to 75 mm pvc line using PVC saddle , 20mm FTA, coupling elbow etc. including excavation and refilling, cost of specials, labour charges, etc. complete. |
| 5 | OD172666/2025-2026:Shifting the water connection house / tap connection from the existing line to the newly laid line by supplying and fitting suitable saddle clamp, bend, union, elbow, coupling, reducer, barrel piece, PVC Ball valve, including earthwork excavation & refilling, cost of pipe & specials, labour charges, hire for tools, etc. complete. |
| 6 | 100.9.7:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 75 mm nominal outside diameter pipes. |
| 7 | 100.98.212:Supply of PVC Pipe, 6kg/cm2, 75mm Dia. |
| 8 | 50.18.9.21.4:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 75 mm dia Bend |
| 9 | 50.18.9.21.8:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement -75 mm dia End cap |
| 10 | OD173110/2025-2026:Providing interconnection from the 300mm CI pipeline below precast huge drainage beside to national highway by removing the paving tiles on foot path and 15mm thick baby metal above the slab of footpath, taking out the covering slab, excavation for exposing pipe including refilling and to relay the cover slab, footpath paving tiles etc. as before. Please Enable Macros to View BoQ information |