Name of Work:- Mohalla Meeranpur Me Madrasa Mahbubul Islam Se Ehsan Ali Ke Ghar Tak Covered Nali Nirman Karya.
Sl. No.
Item Description
1
Diverson of water during work in progress as per direction of E/I
2
E/w excavation in foundaton in ordinary soil etc. as per S.I. No-251-120 Sl. No. 258A, 254
3
Disposal of Excavated Earth up to 5.0 km Away from the Site Quantity Same As item no 2 after deduction qty in item no 9
4
Sand Filling in plinth excluding supply of necessary quantity of sand from a distance not exceeding 8 km from the site of workand including watering, ramming, dressing etc. Rate to include cost of all matterials, labour and T&P etc. required for proper completion of the work
5
Providing and Laying of Cement Concrete in 1:3:6 (1 Cement : 3 Coarse Sand : 6 graded stone ballast 40 mm nominal size) including supply of all matterial, Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation and floors. As per SOR Chp-5 Item S.I.No 280
6
Reinforced cement concrete work with cement approved coarse sand and 2 cm gauge approved stone ballast in the proportion of 1:1.5:3 in Drain for Base & Cover Slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. GI binding Wire and including necessary centering and shuttering etc. and also including supply of all matterials, labours and T&P etc. required for proper completion the work. Binding wire cost being included in the item. Drain Base Slab Drain Cover Slab @ 50%
7
Reinforced cement concrete work with cement approved coarse sand and 2 cm gauge approved stone ballast in the proportion of 1:1.5:3 in Drain for Walls/ Column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. GI binding Wire and including necessary centering and shuttering etc. and also including supply of all matterials, labours and T&P etc. required for proper completion the work. Binding wire cost being included in the item. Drain Wall
8
Mild steel or Iron work in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shapes asnecessary including bending for proper completion of thework and including supply of all steel and wastages and over laping and hooks. 1.0% of R.C.C. work Quantity as in Item No 6 & 7
9
Earth filling in plinth with carted earth 0.3 km away from the site of work and including watering, ramming, dressing etc. Rate to include cost of all matterials, labour and T&P etc. required for proper completion of the work. Drain Wall
10
S/F Inaguration board. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.