| 1 | Dewatering/bailing out raw sewage and cleaning the open sewage collection tank of any sizes, with the help of pressure jet pump & other required equipments and removing any silt, sludge, raw material of sewage from the well with the help of any T & P as required and throwing it away 100 mtr from the STP and white wash to walls complete all as directed by Engineer-in-Charge. (All STPs). |
| 2 | Cleaning and removing sludge from walls /floor of one Nos Equilization tank off sizes, with the help of pressure jet pump & other required equipments and removing any silt, sludge, raw material of sewage from the well with the help of any T & P as required and throwing it away 100 mtr from the STP and white wash to walls complete all as directed by Engineer-in-Charge. (All STPs). |
| 3 | Cleaning and removing sludge from walls /floor of one Nos Treated water tank, with the help of pressure jet pump & other required equipments and removing any silt, sludge, raw material of sewage from the well with the help of any T & P as required and throwing it away 100 mtr from the STP and white wash to walls complete all as directed by Engineer-in-Charge. (All STPs). |
| 4 | Cleaning,removing and bailing out stagnated sewage or sludge from walls/floor and any light particle with the help of pressure jet pump & other required equipments from MBBR Reactor inner surface off sizes and taking out damaged and unbroken MBBR media without any damage and refilling it in each MBBR, cleaning of inner and outer surface of MS pipe placed in MBBR and removing any sludge particle from it and white wash to walls complete all as directed by Engineer-in-Charge. (All STPs).Note : New media for topping up will be paid and measured separately under respective item of BOQ. |
| 5 | Cleaning and removing of sludge from walls/floor of tube settler tank off sizes after taking out the tube settler media with the help of pressure jet pump & other required equipments and depositing where directed at a distance 100 mtr away from outer wall of STP including taking out old rusted wire mesh and cleaning fixing wire mesh of same size with the tube settler and fixed in original position in the tube settler tank and white wash to walls complete all as directed by Engineer-in-Charge. (All STPs).Note : New media for topping up will be paid and measured separately under respective item of BOQ. |
| 6 | Cleaning and removing of sludge from walls/floor of filter feed tank with the help of pressure jet pump & other required equipments and depositing where directed by Engineer - in - Charge at a distance 100 mtr away from outer and white wash to walls complete all as directed by Engineer-in-Charge. (All STPs). |
| 7 | Cleaning and removing of sludge from walls/floor of Raw Water Collection Tank located at various places with the help of pressure jet pump & other required equipments and depositing where directed at a distance 100 mtr away from outer wall of Raw Sewage Collection Tank including bailing out all material from inside the tank including complete all as directed. (Shivaji Pump house No 01, 02 & 03, Ranjit/Gobind Raw Sewage Tank, Jadunath Raw Sewage PH, Gurnam Enclave Raw sewage collection tank). |
| 8 | Taking out solid dry sewage waste from 06 x sludge beds (except shivaji STPs where only three beds) off sizes and removing to a distance not exc 50 mtr from outer edge of Sewage treatment plant for further disposal and white wash to walls complete all as directed by Engineer-in-Charge. (All STPs). |
| 9 | Cleaning & Desludging by removing semi solid sludge from the sump well and pump wells of any capacity at any depth at sewage pump house installation No 1 to 07 at south campous, Cleaning of all pipe line by opening both ends mechanically in foul condition including all necessary T&P required for removal of sludge and solid contents to any place out side the defence land without any extra cost etc complete all as specified and directed . |
| 10 | Cleaning of existing DMF by opening the lid 500 mm dia and removing manually, remove water strainer and refix the same after necessary modification, cleaning and topping up with new media as required quantity, Size of DMF 2.6 m dia and 1.9 m height (For Ranjit/Gobind, Jadhunath and Piru Singh STPs).Note: The new media required to top up shall be measured and paid separately as supply only under respective item. |
| 11 | M&L for following materials for Dual Media Filter (DMF) :-Pebbles - 1900 Kg, Gravel - 1900 Kg, Fine filterate - 3350 KgsAnthracite - 1570 Kgs (For Ranjit/Gobind, Jadhunath and Piru Singh STPs). |
| 12 | Cleaning of existing ACF by opening the lid 500 mm dia and complete manually, remove water strainer and refix the same after necessary modification, cleaning and topping up with new media as required quantity, size of ACF 2.6 m dia and 1.9 m height (For Ranjit/Gobind, Jadhunath and Piru Singh STPs).Note: The new media required to top up shall be measured and paid separately as supply only under respective item. |
| 13 | M&L for materials for for Active Carbon Filter (ACF) :-Pebbles - 1900 Kg, Gravel - 1900 Kg, Fine filterate - 1700 KgsActivated Carbon granule - 1100 Kgs (For Ranjit/Gobind, Jadhunath and Piru Singh STPs). |
| 14 | Cleaning of existing DMF by opening the lid 500 mm dia and removing manually, remove water strainer and refix the same after necessary modification, cleaning and topping up with new media as required quantity, Size of DMF 1.8 m dia and 1.6 m height (For Abdulhamid STPs).Note: The new media required to top up shall be measured and paid separately as supply only under respective item. |
| 15 | M&L for materials for Dual Media Filter (DMF) :-Pebbles - 780 Kg, Gravel - 780 Kg, Fine filterate - 1350 KgsAnthracite - 635 Kgs(For Abdulhamid STPs). |
| 16 | Cleaning of existing ACF by opening the lid 500 mm dia and complete manually, remove water strainer and refix the same after necessary modification, cleaning and topping up with new media as required quantity, size of ACF 1.8 m dia and 1.6 m height (For Abdulhamid STPs).Note: The new media required to top up shall be measured and paid separately as supply only under respective item. |
| 17 | M&L for materials for for Active Carbon Filter (ACF) :-Pebbles - 780 Kg, Gravel - 780 Kg, Fine filterate - 700 KgsActivated Carbon granule - 450 Kgs (For Abdulhamid STPs). |
| 18 | Cleaning of existing DMF by opening the lid 500 mm dia and removing manually, remove water strainer and refix the same after necessary modification, cleaning and topping up with new media as required quantity, Size of DMF 1.2 m dia and 1.6 m height (For Albert Ekka STPs).Note: The new media required to top up shall be measured and paid separately as supply only under respective item. |
| 19 | M&L for materials for Dual Media Filter (DMF) :-Pebbles - 350 Kg, Gravel - 350 Kg, Fine filterate - 600 KgsAnthracite - 280 Kgs(For Albert Ekka STPs). |
| 20 | Cleaning of existing ACF by opening the lid 500 mm dia and complete manually, remove water strainer and refix the same after necessary modification, cleaning and topping up with new media as required quantity, size of ACF 1.2 m dia and 1.6 m height (For Albert Ekka STPs).Note: The new media required to top up shall be measured and paid separately as supply only under respective item. |
| 21 | M&L for materials for for Active Carbon Filter (ACF) :-Pebbles - 350 Kg, Gravel - 350 Kg, Fine filterate - 300 KgsActivated Carbon granule - 200 Kgs(For Albert Ekka STPs). |
| 22 | M&L for MBBR media to treat water in all STPs located at different places complete all as directed and specified by Engineer-in-Charge. |
| 23 | M & L for replacement of tube settler media is a typically made of PVC consisting of inclined channels and height of media is 100cm complete all as specified and directed by Engineer-in-Charge. |
| 24 | Supply and fixing in repair PVC water tank of capacity 500 ltrs complete all as specified and directed by Engineer-in-Charge. |
| 25 | Cleaning and removing sludge from walls /floor of Treated water tank (located at 11 different locations for arboriculture) with the help of pressure jet pump & other required equipments and depositing where directed by Engineer-in-Charge at a distance 100 mtr away from outer and white wash to walls complete all as directed by Engineer-in-Charge. |
| 26 | M&L for area cleaning under pumphouse premises as cutting/scraping of grass, unwanted trees, plant, levelling of earth surfaces, filling of digs etc complete all as directed. |
| 27 | M & L for preparation of old steel and iron surfaces of any description over 10 cm in width or girth and applying one coat of synthetic enemal paint of any tint complete all as specified and directed by Engineer-in-Charge. |
| 28 | Frame work as in doors or gates of angle or other section with gusset plates, rails, braces etc complete, drilled for fixing of steel sheeting or other covering. doors, etc to be prepared for hanging or sliding with and including either hooks and hinges or steel hanging door fittings (exclusive of steel sheeting or other covering, running rails and guides) and hanging; also fastening and fixing complete conforming to Fe.290.Gde-E-165 complete all as specified and dirtected by Engineer-in-Charge. Please Enable Macros to View BoQ information |
| 29 | Frame work as in doors or gates of angle or other section with gusset plates, rails, braces etc complete, drilled for fixing of steel sheeting or other covering. doors, etc to be prepared for hanging or sliding with and including either hooks and hinges or steel hanging door fittings (exclusive of steel sheeting or other covering, running rails and guides) and hanging; also fastening and fixing complete conforming to Fe.290.Gde-E-165 complete all as specified and dirtected by Engineer-in-Charge. Please Enable Macros to View BoQ information |