| 1 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities notexceeding 15 cm depth and disposal of the rubbish.within a lead upto 75 m as directed. |
| 2 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared) |
| 3 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed. within a lead of 75 m.a) In ground floor including roof. |
| 4 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m.In ground floor including roof.(a) upto 150 mm. thick. |
| 5 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof. |
| 6 | Stripping off worn out plaster and raking outjoints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. |
| 7 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone)including removing,spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches,levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 8 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work).(a) With earth obtained from excavation of foundation. |
| 9 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity). |
| 10 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 11 | Hire charges of earth mover/excavator cum loader for 8 hours including one no. operator ,one no helper,fule etc. The rate is inclusive of all expenses complete. |
| 12 | Supplying air compressor machine including labour, operator, fuel, permit etc. for 8 hours at desired location all complete. |
| 13 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof) 25 mm to 30 mm shuttering without staging in foundation. |
| 14 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering.In ground floor and foundation.(a) 1:3:6 proportion |
| 15 | Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. - Pakur variety. |
| 16 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. |
| 17 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders, etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation, basement and upto roof of ground floor/upto 4 m.JSW / JSPL / SHYAM / SRMB / BMASL / ELECROSTEEL / SSL |
| 18 | Brick work with 2nd class bricks in cement mortar (1:6).(a) In foundation & plinth. |
| 19 | Brick work with 2nd class bricks in cement mortar (1:6) (a) In Superstructure, ground floor. |
| 20 | 125 mm thick brick work with 2nd class bricks in cement mortar (1:4) in ground floor. |
| 21 | Plaster (to wall, floor, ceiling, etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface]. With 1:6 cement mortar – 20 mm thick plaster |
| 22 | 15 mm thick plaster in 1:6 mortar . In Ground floor. |
| 23 | 10 mm thick plaster in 1:4 mortar. (a) In Ground floor. |
| 24 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. Note :- Cement 0.152 cum per 100 sqm. |
| 25 | Flush pointing to brick work in cement mortar (1:4) including raking out joints. |
| 26 | Rule pointing to brick work in cement mortar (1:4) including raking out joints & top finishing |
| 27 | Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification.In ground floor (a) Two Coats. |
| 28 | M.S structural works in columns, beams, etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS:226, IS:808 & SP (6)-1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer in Charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816-1956 &IS: 1995 using electrodes of approved make and brand conforming to IS:814-1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hires charge of all tools and plants and labour required for the work including all incidental charges such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be made by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5Kg./m or 15% of weight for finished structural members weighing less than 22.5 Kg./m may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no separate payment being made for these items, as per direction of Engineer in Charge. The rates are considered for a height of erection 8m/2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m beyond initial 8m or part thereof.For structural works in Roof Trusses, etc. using joists, channels and angles of specified section weighing less than 22.5 Kg/m. |
| 29 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 30 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary:(a) On steel or other metal surface:With super gloss (high-gloss)-Two coats (with any shade except white) |
| 31 | Strong bamboo posts, posts plates, rafters, ties etc. fitted and fixed complete with coir rope or nails as directed. Embedded portion of posts shall also be paid for against this item. Cost of digging hole and repacking being paid for seperately.100 mm dia Bamboo . |
| 32 | Fixing of bamboo posts by digging hole in all sorts of soil and subsequent thorough repacking the same with spoils including the cost of one coat of coal-tarring the embedded portion of the bamboo :Depth 600 mm. |
| 33 | Supplying, fitting galvanised 2 ply 12 gauge / 2 points line of barbed wire in fencing (holes already made in the body of the post) or fixed by staples tightening and fixing the wires in taut condition with straining bolts including the cost of cutting and of lapping joints in the wire as necessary but excluding the cost of galvanised staples,straining bolt and binding wire as necessary 2 ply 12 gauge 2Points. (Payment to be made on the length of individual lines of wire.). |
| 34 | Supplying galvanised straining bolts (with eye at one end with double nuts and washers) fitted and fixed complete.(i) 10 mm. dia. 150mm. |
| 35 | Supplying galvanised staples fitted and fixed complete (a) 19 mm. to 25 mm. size. |
| 36 | Fixing S.H 90 lbs Rails (To be supplied Departmentally)1.50 m in length after cutting, carrying (within 5 km) and fixing in line and level as per the direction of Engineer- in -charge.( The rate is inclusive of the cost of carrying , loading ,unloading ,cutting the rails and fixing the same but excluding the cost of excavating foundation , concreting and painting.) Rail will be supplied by SMPA. |
| 37 | Galvanised corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J orL hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugation minimum side lap.(Payment to be made on area of finished work). (GCI sheet to be supplied by contractor). For Wall 0.63 mm thick sheet. |
| 38 | Painting block letters or digits in Black Japan or any approved paint as per direction. (a) Size above 5 cm. and upto 7.5 cm. |
| 39 | (b) Size above 10 cm. and upto 12.5 cm. |
| 40 | (c) Size above 12.5 cm. and upto 15 cm. |
| 41 | Providing and supplying at site RCC(1:1.5:3) demarcation/Fencing Pillars 1800mm longx150 mmx150mm section having 4 Nos 10mm dia vertical M.S. reinforcement and 8 mm dia ring@150 mm centres ,embossed with mark “S.M.P.A” finished smooth ,& 4 nos holes of 12 mm dia. to be kept on the upper G.L 1200 mm length including shuttering, reinforcement, curing and painted with two coats decorative cement based paint including primer of approved quality, all complete. |
| 42 | Carriage of Boundary Pillars, R.C. Guard posts, Km Posts etc. from godown or stackyard to work site as per direction. (for various KM in and around and various outstation).Any distance up to 5 km |
| 43 | Welding in M.S. structural work gas or electric: Tack weld |
| 44 | Continuous weld. |
| 45 | Supplying, fitting, fixing bolts with nuts, washer:(i) 10 to 16 mm dia: Length above 75 mm and upto 150 mm. |
| 46 | Preparation and consolidation of sub-grade with power road roller of 8 – 12 tonne capacity after cutting exiting road upto required depth, dressing to camber and consolidation with road roller including making good the undulation etc and rerolling the sub-grade and disposal of surplus earth with lead upto 50 meters. |
| 47 | Cutting to requisite length or shape departmental R.S. joists, channels, angles, tees, plates etc.(payment to be made on area of cut surface) |
| 48 | Fitting and fixing old pieces of asbestos, G.C.I. or C.I. sheets or plain sheets including closing old holes with washers and sheet-bolts and nuts, etc. and including fixing the same to supporting frame with necessary hook-bolts, washers, putty etc. (excluding cost of sheets). (Payment to be made on area of finished work.)(ii) With all new fittings including the cost thereof.(b) In wall |
| 49 | Supply of un-skilled labour as and when requried for miscellaneous building and other construction /Repair/Maintenance works (non measurable) at different location as directed by Engineer in charge. Total duty time 8.00 Hours with one hour recess. |
| 50 | Urgent cleaning of dumped rubbish, refuse, unserviceable materials like plant bush cutting etc. from inside and outside of SMP kolkata premises by Dumper (Hyva) incuding loading , tranporting within a distance of 5 km and unloading beyond the compound, in conformity with the Municipal/ Corporation Rule for such disposal all completed as directed, rate including hire charge , driver, helper, fule loading and unloading and all statutory charges but excluding GST. |
| 51 | Hire charges of TATA ACE including driver,fuel and other tools & tackels but excluding the labour cost of loading and unloading for shifting job at various place of SMP, Kolkata. for the period of 8 hr.As directed by EIC. Please Enable Macros to View BoQ information |