| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR CIL Hide Select GST Registered Bidder under regular scheme GST Registered Bidder under composition scheme GST Unregistered Bidder Not Applicable Tender Inviting Authority: Staff Officer (Civil), WCL, Majri Area. Name of the Work / Contract No: Providing protection wall and allied works for temporary hume pipe culvert at Dahiwal Nallah for Railway Siding access road at Yekona-I and II OCM under Amalgamated Yekona Sub Area of Majri Area / ma9511cive003-26-27/070 Dated 11.05.2026 / Sr. No.03. . Category of services (To be selected by department) Category of bidder (To be selected by bidder) To be entered by department Service Tax Category ( To Be Selected by Bidder) ITC Available Works Contract Bidder's status (mandatory) Rate of GST (in %) Total GST(in Rs.) GST to be paid by bidder (in Rs.) GST to be paid by WCL (in Rs.) Name of the Bidder/ Bidding Firm / Company : Select 18.0 0.0 0.0 0.0 PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the bidder name and values only.) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category Total amount inRs. P TOTAL AMOUNT With Taxes Total amount in words |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soils |
| 3 | Boulder and moorum filling in plinth including cost of all materials & labour complete as per instruction of Engineerincharge(100cft boulder &40cft moorum for 100cft finished work) including watering ,ramming and consolidation complete |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources). |
| 5 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form forWalls (any thickness) including attached pilasters, butteresses, plinth and string courses etc |
| 10 | Supplying and placing at position empty cement bags filled with OB/loose earth stitching the bag with thread and placing in position as directed complete as per instruction of engg-in-charge. |
| 11 | Deployment of excavator machine ( JCB of equivalent) including cost of opertator deisel , mobil oil etc. for levelling / road sides excavation and stacking within a lead of 50 meter etc. all complete job as per instructions of E.I.C |
| 12 | Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 5.0 to 9.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary) |
| 13 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification.By Plant Mix Method For Grading-I Material |
| 14 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of specification. By Manual Means Grading- I (63 to 45mm) Using Screening Type-A (13.2mm Agg.) |
| 15 | Dry Lean cement concrete Sub-base construction of dry lean cement concrete Sub-base over a prepared Sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strengh not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect. |
| 16 | Cement Concrete Pavement Construction of unreinforced, dowel jointed, plain cement concrete pavement M-40 grade concrete over a prepared sub base with cement, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction,expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc. he quantities for cement, coarse aggregate and fine aggregates are for estimating only .The exact quantities will be as per mix design. minimum cement content as 360kg/cum for estimattion excess cement will be paid separetely |
| 17 | Total impact of GST for the purpose of CTC Total in Figures 3189533.378 3189533.378 INR Thirty One Lakh Eighty Nine Thousand Five Hundred & Thirty Three and Paise Thirty Eight Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |