| 1 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 |
| 2 | Earthwork in excavation in foundation including lift 1.5m and lead 30m including all labour material T & P etc. all cost complete (Sl. No. 251) |
| 3 | Supply of R.C.C. Hume pipe NP3 Class with coller (incluiding cartage upto site ) S.I. No. 5 (iv) 350mm Dia/300mm Dia |
| 4 | Laying & Fixing of RCC hume pipe NP-3 class (Labour only) S.I.No. 5(a)(iv) 350mm Dia/300mm Dia |
| 5 | Concrete with 4cm gauge Brick Ballast, Fine sand and cement in propration 12:6:1 in foundation including supply of all material, labour and T&P etc. requried for proper completion of the work (Sl. No. 273) |
| 6 | Frist class brick work in 1 : 4 cement and coarse sand mortar in foundation including supply of all material, labour and T&P etc. requried for proper completion of the work (Sl. No. 305) |
| 7 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with moter grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density. Complete as per Technical Specification Clause 401. |
| 8 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 4.7-405(3) |
| 9 | Providing and laying of factory made 80mm thick interlocking cement concrete tiles (30mpa) including 25 mm thick compacted bed of fine sand compacting and proper embedding/laying of the interlocking tiles leveling and dressing of surface to required level and slope, filling joints with fine sand including all complete (S.I.No. New I.No. 1) |
| 10 | Cement concrete with 2cm gauge approved stone ballast, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. requried for proper completion of the work (Sl. No. 279(I)) |
| 11 | 12 mm thick plaster with cement and coarse sand morta in 1 : 5 ratio including supply of all material, labour and T&P etc. requried for proper completion of the work Sl. No. 584(I) |
| 12 | R.C.C work with cement approved coarse sand and 2cm gauge approved stone ballast in the proportion of 1:1.5:3 including supply of all materials, labour and T&P etc. requried for proper completion of the work, excluding supply of reinforce cement (Sl. No. 283a) |
| 13 | Mild steel or iron work in planeor R.C.C. work including cutting bending and fixing position including all completion of the work (S.I. No. 504) |
| 14 | Lean concrete 1:4:8 with cement fine sand and 40 mm gause Brick Ballast including all As per SI.No 275 |
| 15 | Supply of R.C.C. Hume pipe NP3 Class (incluiding cartage up to site ) 900 MM Dia RCC HUME PIPE including coller S.I. No. 5 (ii) |
| 16 | Laying & Fixing of 900MM Ø NP-3 Hume Pipe including all labour T&P etc complete s.i 5(a)(ii) |
| 17 | Struck pointing 1:2 with cement and fine sand mortar including all labour T&P incl.etc complete (As per S.I.No.574) |
| 18 | Supply and fixing of Informatory Sign Board including all complete. |
| 19 | Supply and fixing of Innaugration Sign Board including all complete. Please Enable Macros to View BoQ information |