| 1 | 33 KV Pin point WPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)(Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg. |
| 2 | 33 KV V cross Arm (GI) 22Kg each |
| 3 | Top bracket 100 x 50 x 6mm GI Channel (GI) (2kg each) |
| 4 | Danger Plate 1No. for each pole |
| 5 | Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510) |
| 6 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 7 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 8 | 33 KV Pin insulator Polymer. |
| 9 | Earthing of support (Coil type) |
| 10 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 11 | G.I. nuts, Bolts & washer of different size (1.45Kg/ Pin Point) |
| 12 | PoLYCARBONATE BIRD GUARD |
| 13 | Black paint (GIS Numbering and & Zebra Sripping) |
| 14 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 15 | Civil & ServiceConcreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr. |
| 16 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 17 | Part-B- (i) Construction of approximately 0.08 Ckm new 11KV live with 55 sqmm AAAC, followed by dismantling of approximately 0.08 Ckm of existing OH 11KV line, (ii) 11KV Guarding (Single Pole) for road crossing 35Mtr. (iii) 11KV Guarding (Double Pole) for road crossing 40 Mtr. 11KV Cut Point with 180 Degree AngleWPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)(Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg. |
| 18 | Straight Cross Arm 100 x 50 x 6 mm 9.56 KG per Mtr. each Channel (GI) length 1.2 Mtr. 4 Nos. Chanel required = (4x9.56 x 1.2) |
| 19 | Fish Plate 50 x 6mm, 2.36kg/Mtr. each 0.280 Mtr. length 16Nos. required = (16x2.36 x 0.280) |
| 20 | Straight Cross Arm 100 x 50 x 6 mm 9.56 KG per Mtr. each Channel (GI) length 0.306 Mtr. 4 Nos. Chanel required = (4x9.56 x 0.306) |
| 21 | Danger Plate 1Nos. |
| 22 | Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510) |
| 23 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 24 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 25 | 11 KV Pin insulator Polymer. |
| 26 | H.W. Fittings (B&S) 70KN 3 bolt |
| 27 | Disc insulator (B&S) 70 KN Polymer |
| 28 | Earthing of support (Coil type) |
| 29 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 30 | WEDGE CONNECTOR FOR 80 SQMM CONDUCTOR |
| 31 | PoLYCARBONATE BIRD GUARD |
| 32 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 33 | Black paint (GIS Numbering and & Zebra Sripping) |
| 34 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 35 | Civil & ServicesConcreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr. |
| 36 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 37 | 1. Cut point with 90 degree angle.WPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)(Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg. |
| 38 | Straight Cross Arm 100 x 50 x 6 mm 9.56 KG per Mtr. each Channel (GI) length 1.2 Mtr. 4 Nos. Chanel required = (4x9.56 x 1.2) |
| 39 | Fish Plate 50 x 6mm, 2.36kg/Mtr. each 0.280 Mtr. length 16Nos. required = (16x2.36 x 0.280) |
| 40 | Straight Cross Arm 100 x 50 x 6 mm 9.56 KG per Mtr. each Channel (GI) length 0.306 Mtr. 4 Nos. Chanel required = (4x9.56 x 0.306) |
| 41 | Danger Plate 1Nos. |
| 42 | Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510) |
| 43 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 44 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 45 | 11 KV Pin insulator Polymer. |
| 46 | H.W. Fittings (B&S) 70KN 3 bolt |
| 47 | Disc insulator (B&S) 70 KN Polymer |
| 48 | Earthing of support (Coil type) |
| 49 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 50 | WEDGE CONNECTOR FOR 80 SQMM CONDUCTOR |
| 51 | PoLYCARBONATE BIRD GUARD |
| 52 | HT Stay Clamp 50x8mm flat, 3.14kg / Mtr., 0.551 Mtr. Length, 2Nos. qty required (1pair) |
| 53 | HT Stay set complete |
| 54 | HT Stay Insulator-Type C |
| 55 | 7/10 (SWG) Stay wire 15kg/Stay |
| 56 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 57 | Black paint (GIS Numbering and & Zebra Sripping) |
| 58 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 59 | Civil & ServicesFixing of complete 11KV line complete Stay set includes, 1. turn buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay insulator, 4. Stay Wire, 5. Stay clamps with Nuts and bolts BA will do the excvation including excavation, suppy of 0.5 Cum Cement concrete foundaton 1:2:4 size (500mm x500mm x 800mm) using 20mm BHG metal with all labour and material as per TPCODL drawing & Standard |
| 60 | Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr. |
| 61 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 62 | 2. 11 KV Pin Points With WPBWPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)(Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg. |
| 63 | 11KV V Cross Arm GI (10.2 Kg Each) |
| 64 | Top bracket 100 x 50 x 6mm GI Channel (GI) (2kg each) |
| 65 | Danger Plate 1No. for each pole |
| 66 | Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510) |
| 67 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 68 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 69 | 11 KV Pin insulator Polymer. |
| 70 | Earthing of support (Coil type) |
| 71 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 72 | G.I. nuts, Bolts & washer of different size (1.45Kg/ Pin Point) |
| 73 | 55 mmsq AAAC |
| 74 | Black paint (GIS Numbering and & Zebra Sripping) |
| 75 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 76 | PoLYCARBONATE BIRD GUARD |
| 77 | Civil & ServiceConcreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr. |
| 78 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 79 | (ii) 11 KV Line Protecting GuardingGuarding Channel (GI) 75x40x4.8 mm, 7.14 KG/Mtr., each channel length 2.2 mtr., 4 no's channel (GI) required =( 4x7.14x2.2) ( For Single Pole) |
| 80 | No-6 GI wire (0.192 kg/mtr.) for Main String |
| 81 | No-8 GI wire (0.131 kg/mtr.) for lacing |
| 82 | Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.) |
| 83 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 84 | 50x6mm GI Flat for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36 |
| 85 | Civil & ServiceConstruction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe . |
| 86 | (iii) 11 KV Line Protecting GuardingGuarding Channel (GI) 75x40x4.8 mm, 7.14 KG/Mtr., each channel length 2.2 mtr., 4 no's channel (GI) required =( 4x7.14x2.2) ( For Double Pole) |
| 87 | No-6 GI wire (0.192 kg/mtr.) for Main String |
| 88 | No-8 GI wire (0.131 kg/mtr.) for lacing |
| 89 | Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.) |
| 90 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 91 | 50x6mm GI Flat for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36 |
| 92 | Civil & Service Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe . |
| 93 | (PART-C) Shifting of approximately 0.9Ckm of new 1.1KV OH line with 4x50 + 1x50 sqmm ABC .LT AB Cable line9Mtr. long PSC Pole 300 Kg. |
| 94 | LT Stay set complete |
| 95 | 7/12 (SWG) G.I. Stay wire-Grade-2 |
| 96 | LT Stay Clamp (1.4 kg / pair) |
| 97 | LT Stay Insulator |
| 98 | Pole clamp for Eye hook for (XLPE erial bunched cable) |
| 99 | Eye hook for (XLPE erial bunched cable 25-70mmsq) |
| 100 | Dead end clamp for suitable for messenger XLPE Aerial bunched cable (25-70mmsq) |
| 101 | Suspension clamp with EYE hook for ABC (25-70mmsq) |
| 102 | 4C x50mmsq + 1C x50mmsq LT AB Cable |
| 103 | Insulated piercing connector, Type A main 50 to 150mmsq and Tap 50 to 150sqmm. |
| 104 | Earthing of support (Coil type) |
| 105 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 106 | Danger Plate LT |
| 107 | Black Clamp for danger board plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No's. = (1x 0.59 x 0.510) |
| 108 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 109 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 110 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 111 | Black paint (GIS Numbering and & Zebra Sripping) |
| 112 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 113 | Civil & ServiceFixing of LT complete stay set includes, 1. turn buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay insulator, 4. Stay Wire, 5. Stay clamps with Nuts and bolts BA will do the excvation including excavation, suppy of 0.5 Cum Cement concrete foundaton 1:2:4 size (500mm x500mm x 800mm) using 20mm BHG Metal with all labour and material (Excavation of earth will be done of size 500 x 500 x 1500mm.) |
| 114 | Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1500mm) =0.375 Cu. Mtr. |
| 115 | (PART-D) Shifting of approximately 0.9Ckm of new 1.1KV OH line with 4x35 + 1x35 sqmm ABC .LT AB Cable lineWPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)(Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg. |
| 116 | LT Stay set complete |
| 117 | 7/12 (SWG) G.I. Stay wire-Grade-2 |
| 118 | LT Stay Clamp (1.4 kg / pair) |
| 119 | LT Stay Insulator |
| 120 | Pole clamp for Eye hook for (XLPE erial bunched cable) |
| 121 | Eye hook for (XLPE erial bunched cable 25-70mmsq) |
| 122 | Dead end clamp for suitable for messenger XLPE Aerial bunched cable (25-70mmsq) |
| 123 | 4C x35mmsq + 1C x35mmsq LT AB Cable |
| 124 | Insulated piercing connector, Type B main 25 to 150mmsq and Tap 6 to 35sqmm. |
| 125 | Earthing of support (Coil type) |
| 126 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 127 | Danger Plate LT |
| 128 | Black Clamp for danger board plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No's. = (1x 0.59 x 0.510) |
| 129 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 130 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 131 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 132 | Black paint (GIS Numbering and & Zebra Sripping) |
| 133 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 134 | Civil & ServiceFixing of LT complete stay set includes, 1. turn buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay insulator, 4. Stay Wire, 5. Stay clamps with Nuts and bolts BA will do the excvation including excavation, suppy of 0.5 Cum Cement concrete foundaton 1:2:4 size (500mm x500mm x 800mm) using 20mm BHG Metal with all labour and material (Excavation of earth will be done of size 500 x 500 x 1500mm.) |
| 135 | Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1500mm) =0.375 Cu. Mtr. |
| 136 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 137 | (PART-E) Shifting of approximately 2.253km of New 1.1KV OH line with 2x35 + 1x25 sqmm ABCLT AB Cable line9Mtr. long PSC Pole 300 Kg. |
| 138 | Pole clamp for Eye hook for (XLPE erial bunched cable) |
| 139 | Eye hook for (XLPE erial bunched cable 25-70mmsq) |
| 140 | Dead end clamp for suitable for messenger XLPE Aerial bunched cable (25-70mmsq) |
| 141 | 2C x35mmsq + 1C x25mmsq LT AB Cable |
| 142 | Insulated piercing connector, Type B main 25 to 150mmsq and Tap 6 to 35sqmm. |
| 143 | Earthing of support (Coil type) |
| 144 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 145 | Danger Plate LT |
| 146 | Black Clamp for danger board plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No's. = (1x 0.59 x 0.510) |
| 147 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 148 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 149 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 150 | Black paint (GIS Numbering and & Zebra Sripping) |
| 151 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 152 | Civil & ServiceConcreting ratio 1:1.5 : 3 (500mm x 500mm x 1500mm) =0.375 Cu. Mtr. |
| 153 | Part-F-Shifting and Construction of 16KVA 11/0.23 KV DP mounted S/S =1No.WPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)(Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg. |
| 154 | Top Channel (GI) GI 100 x 50 x 6 mm 9.56 Kg / Mtr., each chanel length (3Mtr. 2Nos. Channel (GI) required (2 x 9.56 x 3) |
| 155 | Fish Plate (GI) 50 x 6mm, 2.36kg/Mtr. each 0.280 Mtr. length 6Nos. required = (6x2.36 x 0.280) |
| 156 | Transformer mounting bracket (65 x 65 x 6mm) suitable for 16/10KVA 11/0.23 KV Transformer |
| 157 | AB Switch mounting Channel (GI) 75 x 40 x 4.8mm GI Chanel (3000mm long) 7.14Kg / Mtr., 2Nos. (Each 2 x 3.0 x 7.14 = 42.84 Kg) |
| 158 | Cantilever Support angle 50 x 50 x 6mm GI (1282 mm long) (4.5 Kg / Mtr. 2Nos.) (Each 2 x 1.282x 4.5 = 11.54Kg) |
| 159 | HG/DO Fuse mounting Channel (GI) 75 x 40 x 4.8 mm GI channel (2000mm long) 7.14Kg / Mtr., 2Nos. (Each 2 x 2.000 x 7.14 = 28.56 Kg) |
| 160 | 25x3mm GI flat for earthing, 0.59kg/mtr., (2.5 x 7 Mtr. for mesh formation, 12 Mtr. for LA and 2.5 Mtr. for raising, 11Mtr. for AB switch, 2.8Mtr. for HG Fuse, 5x2 mtr.for DTR and Nutral, (1.3 + 4.5) mtr for DTR Body 0.500 Mtr for LTDB & AB Switch operating handle, 3 Mtr. for Fenching) Each 62.6 x 0.59 =36.93 Kg). |
| 161 | LT distribution Box with MCCB, Aluminium Busbar of single bay with kit kat fuse for 16KVA S/S |
| 162 | 55mmsq All Alloy Aluminum Conductor (AAAC) covered conductor |
| 163 | 2C x 6mm2 LT XLPE Cable (Armoured) |
| 164 | AB switch (11KV 200A 3 Pole 50 Hz) |
| 165 | HG Fuse (11KV 200A 3 Pole) |
| 166 | WEDGE CONNECTOR FOR 80 SQMM CONDUCTOR |
| 167 | PoLYCARBONATE BIRD GUARD |
| 168 | Disc insulator (B&S) 70 KN Polymer |
| 169 | H.W. Fittings (B&S) 70KN 3 bolt |
| 170 | 11KV Lightning Arrestor 12KV-10KA (Station Class) |
| 171 | 11 KV Pin insulator Polymer. |
| 172 | HT Stay set complete |
| 173 | HT Stay Clamp 50x8mm flat, 3.14kg / Mtr., 0.551 Mtr. Length, 2Nos. qty required (1pair) |
| 174 | HT Stay Insulator-Type C |
| 175 | 7/10 (SWG) Stay wire 15kg/Stay |
| 176 | GI pipe earthing 40 mm 3Mtr. Long |
| 177 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 178 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 179 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 8No. = (8x 0.59 x 0.510) |
| 180 | Danger Plate 1Nos. |
| 181 | Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510) |
| 182 | Name plate |
| 183 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 184 | Black paint (GIS Numbering and & Zebra Sripping) |
| 185 | Civil & ServiceConcreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr. |
| 186 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 187 | PCC ratio 1:3 :6 (M 10 Grade) for DSS Area (5x3x0.1) = 1.5 Cum (Per pole) |
| 188 | Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 (M-10 Grade) size (900 x 600 x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire stay insulator. |
| 189 | Construction Earthing chamber including installation of earthing pipe making earthing chamber including excavation, soil treatment with bentonide power, calculation of earth resistance, including installation of 3Mtr. GI Pipe 40mm / 50mm including welding of GI flat around pipe. |
| 190 | Supply of AL Lugs suitable for 16 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement |
| 191 | SITC and Erection of GI fencing with Gate |
| 192 | Part-G Dismantalling materialsDismantling of 9/11 Mtr. Joist/WPB Pole 116 x 100mm Pole |
| 193 | Dismantling of 9/8 Mtr. PSC / Joist Pole |
| 194 | Dismantling of existing 11/0.4KV, 33/0.4KV, Three phase distribution Transformer 16KVA including removal of HT / LT leads, earth connection and unloading by crane if required. |
| 195 | Dismantling of ACSR / AAAC 34/55mmsq from overhead line |
| 196 | Dismantling of various type LT AB Cable Please Enable Macros to View BoQ information |