| 1 | 11 KV Cut point with 90 degree angle.WPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)(Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg. |
| 2 | Straight Cross Arm 100 x 50 x 6 mm 9.56 KG per Mtr. each Channel (GI) length 1.2 Mtr. 4 Nos. Chanel required = (4x9.56 x 1.2) |
| 3 | Fish Plate 50 x 6mm, 2.36kg/Mtr. each 0.280 Mtr. length 16Nos. required = (16x2.36 x 0.280) |
| 4 | Straight Cross Arm 100 x 50 x 6 mm 9.56 KG per Mtr. each Channel (GI) length 0.306 Mtr. 4 Nos. Chanel required = (4x9.56 x 0.306) |
| 5 | Danger Plate 1Nos. |
| 6 | Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510) |
| 7 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 8 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 9 | 11 KV Pin insulator Polymer. |
| 10 | H.W. Fittings (B&S) 70KN 3 bolt |
| 11 | Disc insulator (B&S) 70 KN Polymer |
| 12 | Earthing of support (Coil type) |
| 13 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 14 | WEDGE CONNECTOR FOR 80 SQMM CONDUCTOR |
| 15 | PoLYCARBONATE BIRD GUARD |
| 16 | HT Stay Clamp 50x8mm flat, 3.14kg / Mtr., 0.551 Mtr. Length, 2Nos. qty required (1pair) |
| 17 | HT Stay set complete |
| 18 | HT Stay Insulator-Type C |
| 19 | 7/10 (SWG) Stay wire 15kg/Stay |
| 20 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 21 | Black paint (GIS Numbering and & Zebra Sripping) |
| 22 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 23 | Civil & ServicesFixing of complete 11KV line complete Stay set includes, 1. turn buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay insulator, 4. Stay Wire, 5. Stay clamps with Nuts and bolts BA will do the excvation including excavation, suppy of 0.5 Cum Cement concrete foundaton 1:2:4 size (500mm x500mm x 800mm) using 20mm BHG metal with all labour and material as per TPCODL drawing & Standard |
| 24 | Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr. |
| 25 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 26 | 11 KV Pin Points With WPB10Mtr. long PSC Pole 330 Kg. |
| 27 | WPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)(Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg. |
| 28 | PSC Pole clamp (GI) |
| 29 | 11KV V Cross Arm GI (10.2 Kg Each) |
| 30 | Top bracket 100 x 50 x 6mm GI Channel (GI) (2kg each) |
| 31 | Danger Plate 1No. for each pole |
| 32 | Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510) |
| 33 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 34 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 35 | 11 KV Pin insulator Polymer 3nos required for each support |
| 36 | Earthing of support (Coil type) |
| 37 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 38 | G.I. nuts, Bolts & washer of different size (1.45Kg/ Pin Point) |
| 39 | 55 mmsq AAAC |
| 40 | Black paint (GIS Numbering and & Zebra Sripping) |
| 41 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 42 | PoLYCARBONATE BIRD GUARD |
| 43 | Civil & ServiceConcreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr. |
| 44 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 45 | Part-ii: Construction of 11KV & LT Guarding for Road Crossing over single PoleGuarding Channel 75x40x4.8 mm, 7.14 KG/Mtr., each channel length 4 mtr., 4 no's channel required =( 4x7.14x4) ( For Single Pole) |
| 46 | No-6 GI wire (0.192 kg/mtr.) for Main String |
| 47 | No-8 GI wire (0.131 kg/mtr.) for lacing |
| 48 | Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.) |
| 49 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 50 | 50x6mm GI Flat for earthing, 2.36kg/mtr., (12.7 mtr For raising)= 12.7x2.36 |
| 51 | Civil & Service for Construction of 11KV & LT Guarding for Road Crossing over single Pole Construction Earthing chamber including installation of earthing pipe making earthing chamber including excavation, soil treatment with bentonide power, calculation of earth resistance, including installation of 3Mtr. GI Pipe 40mm / 50mm including welding of GI flat around pipe. |
| 52 | Part-iii Shifting & Construction of 16 KVA 11/0.25 KV SP mounted S/S =2 NoWPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)-DP |
| 53 | Top Channel (GI) GI 100 x 50 x 6 mm 9.56 Kg / Mtr., each chanel length (3Mtr. 2Nos. Channel (GI) required (2 x 9.56 x 3) |
| 54 | Fish Plate (GI) 50 x 6mm, 2.36kg/Mtr. each 0.280 Mtr. length 6Nos. required = (6x2.36 x 0.280) |
| 55 | Transformer mounting bracket (65 x 65 x 6mm) suitable for 16/10KVA 11/0.23 KV Transformer |
| 56 | AB Switch mounting Channel (GI) 75 x 40 x 4.8mm GI Chanel (3000mm long) 7.14Kg / Mtr., 2Nos. (Each 2 x 3.0 x 7.14 = 42.84 Kg) |
| 57 | Cantilever Support angle 50 x 50 x 6mm GI (1282 mm long) (4.5 Kg / Mtr. 2Nos.) (Each 2 x 1.282x 4.5 = 11.54Kg) |
| 58 | HG/DO Fuse mounting Channel (GI) 75 x 40 x 4.8 mm GI channel (2000mm long) 7.14Kg / Mtr., 2Nos. (Each 2 x 2.000 x 7.14 = 28.56 Kg) |
| 59 | 25x3mm GI flat for earthing, 0.59kg/mtr., (2.5 x 7 Mtr. for mesh formation, 12 Mtr. for LA and 2.5 Mtr. for raising, 11Mtr. for AB switch, 2.8Mtr. for HG Fuse, 5x2 mtr.for DTR and Nutral, (1.3 + 4.5) mtr for DTR Body 0.500 Mtr for LTDB & AB Switch operating handle, 3 Mtr. for Fenching) Each 62.6 x 0.59 =36.93 Kg). |
| 60 | LT distribution Box with MCCB, Aluminium Busbar of single bay with kit kat fuse for 16KVA S/S |
| 61 | 55mmsq All Alloy Aluminum Conductor (AAAC) covered conductor |
| 62 | 2C x 6mm2 LT XLPE Cable (Armoured) |
| 63 | AB switch (11KV 200A 3 Pole 50 Hz) |
| 64 | HG Fuse (11KV 200A 3 Pole) |
| 65 | WEDGE CONNECTOR FOR 80 SQMM CONDUCTOR |
| 66 | PoLYCARBONATE BIRD GUARD |
| 67 | Disc insulator (B&S) 70 KN Polymer |
| 68 | H.W. Fittings (B&S) 70KN 3 bolt |
| 69 | 11KV Lightning Arrestor 12KV-10KA (Station Class) |
| 70 | 11 KV Pin insulator Polymer. |
| 71 | HT Stay set complete |
| 72 | HT Stay Clamp 50x8mm flat, 3.14kg / Mtr., 0.551 Mtr. Length, 2Nos. qty required (1pair) |
| 73 | HT Stay Insulator-Type C |
| 74 | 7/10 (SWG) Stay wire 15kg/Stay |
| 75 | GI pipe earthing 40 mm 3Mtr. Long |
| 76 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 77 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 78 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 8No. = (8x 0.59 x 0.510) |
| 79 | Danger Plate 1Nos. |
| 80 | Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510) |
| 81 | Name plate |
| 82 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 83 | Black paint (GIS Numbering and & Zebra Sripping) |
| 84 | Civil & ServiceConcreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr. |
| 85 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 86 | PCC ratio 1:3 :6 (M 10 Grade) for DSS Area (5x3x0.1) = 1.5 Cum (Per pole) |
| 87 | Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 (M-10 Grade) size (900 x 600 x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire stay insulator. |
| 88 | Fixing and concreating of stay set with 0.5 cum cement concret foundation 1:3:6 size (900mm x 600mm x 900mm) using 40 mm BHG metal with all labour and material except stay set, stay wire, stay insulator. |
| 89 | Laying of 4C x 35mmsq LT XLPE Cable |
| 90 | SITC and Erection of GI fencing with Gate |
| 91 | Part-iv Shifting & Construction of 63 KVA 11/0.4KV DP mounted S/S =1 NoWPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)(Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg. |
| 92 | 9Mtr. long PSC Pole 300 Kg. |
| 93 | Pole Clamp for Eye hook for (XLPE erial bunched cable) |
| 94 | Eye hook for (XLPE erial bunched cable 25-70mmsq) |
| 95 | Dead end clamp for suitable for messenger XLPE Aerial bunched cable (25-70mmsq) |
| 96 | LT Cable raising Channel Channel (GI) 75 x 40 x 4.8mm GI Chanel (1000mm long) 7.14Kg / Mtr., 3Nos. (Each 3 x 1.000 x 7.14 = 21.42 Kg) |
| 97 | Top Channel (GI) GI 100 x 50 x 6 mm 9.56 Kg / Mtr., each chanel length (3Mtr. 2Nos. Channel (GI) required (2 x 9.56 x 3) |
| 98 | Fish Plate (GI) 50 x 6mm, 2.36kg/Mtr. each 0.280 Mtr. length 6Nos. required = (6x2.36 x 0.280) |
| 99 | AB Switch mounting Channel (GI) 75 x 40 x 4.8mm GI Chanel (3000mm long) 7.14Kg / Mtr., 2Nos. (Each 2 x 3.0 x 7.14 = 42.84 Kg) |
| 100 | AB Switch Side support Channel (GI) 100 x 50 x 6mm, 9.56 Kg/Mtr. each Channel (GI) length 0.35 Mtr., 2Nos. Channel (GI) required (9.56 x 2 x 0.35) |
| 101 | Channel (GI) support for down pipe 75 x 40 x 4.8 mm 7.14Kg/Mtr. each Channel (GI) length 0.8 mtr., 1Nos Channel (GI) required (7.14 x 0.8 x 1) |
| 102 | HG/DO Fuse mounting Channel (GI) 75 x 40 x 4.8 mm GI channel (3000mm long) 7.14Kg / Mtr., 2Nos. (Each 2 x 3.000 x 7.14 = 42.84 Kg) |
| 103 | Cantilever Support Channel (GI) 75 x 40 x 4.8 mm GI Channel (GI) (810mm long 2Nos.) (Each 2 x 0.810x 7.14 = 11.57 Kg) |
| 104 | Cantilever Support angle 50 x 50 x 6mm GI (1282 mm long) (4.5 Kg / Mtr. 2Nos.) (Each 2 x 1.282x 4.5 = 11.54Kg) |
| 105 | Transformer base GI Channel (GI) 100 x 50 x 6mm (3000 mm long) 9.56 Kg / Mtr. 2Nos.) (Each 2 x 3.000x 9.56 = 57.36Kg) |
| 106 | Transformer base support GI Channel (GI) 100 x 50 x 6mm (515 mm long) 9.56 Kg / Mtr. 2Nos.) (Each 2 x 0.515x 9.56 = 9.85Kg) |
| 107 | Transformer belting Angle (GI) 50 x 50 x 6mm GI (3000 mm long) 4.5Kg / Mtr. 2Nos.) (Each 2 x 3.0x 4.5 Kg. = 27Kg) |
| 108 | Transformer belting support Angle(GI) 50 x 50 x 6mm GI (580 mm long) 4.5Kg / Mtr. 2Nos.) (Each 2 x 0.580x 4.5 Kg. = 5.22Kg) |
| 109 | LTDB Mounting Angle(GI) 50 x 50 x 6mm GI (1000mm long) 4.5Kg / Mtr., 2Nos.) Each 2 x 1 x 4.5 Kg.) |
| 110 | 50x6mm GI flat for earthing, 2.36kg/mtr., (2.5 x 7 Mtr. for mesh formation, 12 Mtr. for LA and 2.5 Mtr. for raising, 11Mtr. for AB switch, 2.8Mtr. for HG Fuse, 5x2 mtr.for DTR and AB Switch operating handle, 3 Mtr. for Fenching) Each 65.6 x 2.36 =154.81 Kg). |
| 111 | LT distribution Box with MCCB, Aluminium Busbar of single bay with kit kat fuse for 63KVA S/S |
| 112 | 55mmsq All Alloy Aluminum Conductor (AAAC) covered conductor |
| 113 | 4C x 95mm2 LT XLPE Cable (Armoured) for 63KVA Transformer |
| 114 | 4C x 95mm2 LT XLPE Cable (Armoured) for LTDB to PSC pole |
| 115 | AB switch (11KV 200A 3 Pole 50 Hz) |
| 116 | HG Fuse (11KV 200A 3 Pole) |
| 117 | WEDGE CONNECTOR FOR 80 SQMM CONDUCTOR |
| 118 | PoLYCARBONATE BIRD GUARD |
| 119 | Disc insulator (B&S) 70 KN Polymer |
| 120 | H.W. Fittings (B&S) 70KN 3 bolt |
| 121 | 11KV Lightning Arrestor 12KV-10KA (Station Class) |
| 122 | 11 KV Pin insulator Polymer. |
| 123 | HT Stay set complete |
| 124 | HT Stay Clamp 50x8mm flat, 3.14kg / Mtr., 0.551 Mtr. Length, 2Nos. qty required (1pair) |
| 125 | HT Stay Insulator-Type C |
| 126 | 7/10 (SWG) Stay wire 15kg/Stay |
| 127 | GI pipe earthing 40 mm 3Mtr. Long |
| 128 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 129 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 130 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 8No. = (8x 0.59 x 0.510) |
| 131 | Danger Plate 1Nos. |
| 132 | Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510) |
| 133 | Name plate |
| 134 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 135 | Black paint (GIS Numbering and & Zebra Sripping) |
| 136 | Civil & ServiceConcreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr. |
| 137 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 138 | PCC ratio 1:3 :6 (M 10 Grade) for DSS Area (5x3x0.1) = 1.5 Cum (Per pole) |
| 139 | Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 (M-10 Grade) size (900 x 600 x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire stay insulator. |
| 140 | Fixing and concreating of stay set with 0.5 cum cement concret foundation 1:3:6 size (900mm x 600mm x 900mm) using 40 mm BHG metal with all labour and material except stay set, stay wire, stay insulator. |
| 141 | Laying of 4C x 35mmsq LT XLPE Cable |
| 142 | SITC and Erection of GI fencing with Gate |
| 143 | Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1500mm) =0.375 Cu. Mtr. |
| 144 | Supply of AL lugs suitable for 95sqmm cable / conductor, crimping with cable and fixing / connecting include supply and erection of PVC tape as per voltage requirement. |
| 145 | Supply and erection of double compression flameproof type glanding for armoured cable 3.5 / 4c 50-95sqmm including making hole in base plate and dressing of cable along with vermin proofing properly, supply to be done as per TPCODL spec and approved make dowells. |
| 146 | Part-v Construction of LT OH line for 0.785 CKM over 9 mtr PSC pole with 2C×35 mm² (P)+1C×25 mm²(M) AB Cable & 10 Mtr PSC pole for Road crossingLT AB Cable line9Mtr. long PSC Pole 300 Kg. |
| 147 | 10Mtr. long PSC Pole 330 Kg. |
| 148 | LT Stay set complete |
| 149 | 7/12 (SWG) G.I. Stay wire-Grade-2 |
| 150 | LT Stay Clamp (1.4 kg / pair) |
| 151 | LT Stay Insulator |
| 152 | Pole clamp for Eye hook for (XLPE erial bunched cable) |
| 153 | Eye hook for (XLPE erial bunched cable 25-70mmsq) |
| 154 | Dead end clamp for suitable for messenger XLPE Aerial bunched cable (25-70mmsq) |
| 155 | Suspension clamp with EYE hook for ABC (25-70mmsq) |
| 156 | 2C x35mmsq + 1C x25mmsq LT AB Cable |
| 157 | Insulated piercing connector, Type A main 25 to 150mmsq and Tap 6 to 35sqmm. |
| 158 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 159 | Earthing of support (Coil type) |
| 160 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 161 | Danger Plate LT |
| 162 | Black Clamp for danger board plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No's. = (1x 0.59 x 0.510) |
| 163 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 164 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 165 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 166 | Black paint (GIS Numbering and & Zebra Sripping) |
| 167 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 168 | Civil & ServiceFixing of LT complete stay set includes, 1. turn buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay insulator, 4. Stay Wire, 5. Stay clamps with Nuts and bolts BA will do the excvation including excavation, suppy of 0.5 Cum Cement concrete foundaton 1:2:4 size (500mm x500mm x 800mm) using 20mm BHG Metal with all labour and material (Excavation of earth will be done of size 500 x 500 x 1500mm.) |
| 169 | Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1500mm) =0.375 Cu. Mtr. |
| 170 | Construction Earthing chamber including installation of earthing pipe making earthing chamber including excavation, soil treatment with bentonide power, calculation of earth resistance, including installation of 3Mtr. GI Pipe 40mm / 50mm including welding of GI flat around pipe. |
| 171 | Part-vi: Dismantalling materialsDismantling of 9/8 Mtr. PSC / Joist Pole |
| 172 | Dismantling / Removal of MS Channel from double pole structure / pole |
| 173 | Dismantling of existing 11/0.4KV, 33/0.4KV, Three phase distribution Transformer 16KVA including removal of HT / LT leads, earth connection and unloading by crane if required. |
| 174 | Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 63KVA including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 175 | Dismantling of ACSR / AAAC 34/55mmsq from overhead line |
| 176 | Dismantling of various type LT AB Cable |
| 177 | Dismantling of existing 11KV/ 33KV GO/AB Switch / Isolator / DD Fuse / Fuse set |
| 178 | Dismantling of Lightening Arrester (LA) Please Enable Macros to View BoQ information |